ARMY MIL-D-13319 B-1960 DRIVES BALLISTICS T24 T24E1 M5 AND M5A1 PACKAGING OF《弹道装置 T24 T24E1 M5和M5A1的包装》.pdf

上传人:bowdiet140 文档编号:442316 上传时间:2018-11-15 格式:PDF 页数:25 大小:1.38MB
下载 相关 举报
ARMY MIL-D-13319 B-1960 DRIVES BALLISTICS T24 T24E1 M5 AND M5A1 PACKAGING OF《弹道装置 T24 T24E1 M5和M5A1的包装》.pdf_第1页
第1页 / 共25页
ARMY MIL-D-13319 B-1960 DRIVES BALLISTICS T24 T24E1 M5 AND M5A1 PACKAGING OF《弹道装置 T24 T24E1 M5和M5A1的包装》.pdf_第2页
第2页 / 共25页
ARMY MIL-D-13319 B-1960 DRIVES BALLISTICS T24 T24E1 M5 AND M5A1 PACKAGING OF《弹道装置 T24 T24E1 M5和M5A1的包装》.pdf_第3页
第3页 / 共25页
ARMY MIL-D-13319 B-1960 DRIVES BALLISTICS T24 T24E1 M5 AND M5A1 PACKAGING OF《弹道装置 T24 T24E1 M5和M5A1的包装》.pdf_第4页
第4页 / 共25页
ARMY MIL-D-13319 B-1960 DRIVES BALLISTICS T24 T24E1 M5 AND M5A1 PACKAGING OF《弹道装置 T24 T24E1 M5和M5A1的包装》.pdf_第5页
第5页 / 共25页
亲,该文档总共25页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 MIL-D-33337B 32 m 7797706 0275323 4 m MIL-D -1 331 9B (Ord) 15 April 1960 SUPERSEDING MIL-P-l3319A(Ord) 14 November 1955 .MILITARY SPECIFICATION DRIVES, BALLISTICS: T24, T24E1, M5 AND M5A1; PACKAGING OF 1. SCOPE 1.1 -This specification covers the packaging and packing of Ballistic8 Drives T24, T24E

2、1, M5 and M5A1 for each level of protection. 2. APPLICABLE DOCUMENTS 2.1 The following documents, of the issue in effect on date of invitation for bids, form a part of this specification: SPECIFICATIONS Federal C-F-206 NN-P-515 UU-T-106 UU-T-111 PPP-B-601 PPP-B -62 1 PPP-B-676 PPP-C-843 PPP-P-291 PP

3、P-T -76 PPP-T-97 PPP-T -495 Felt, Sheet, Woal, Presired Plywood, Container Grade Tape, Masking, Paper (Pressure-Sensitive) Tape, Paper Gummed (Sealing and Securing) Boxe6, Wood, Cleated-Plywood BoxesI Wood, Nailed and Lock-Corner Boxea, Set-up, Paperboard Cushioning Mat erial, Celluio o ic Paperboar

4、d, Wrapping, Cushioning Tape, Pr e mur e -Sensitive Adhesive, Paper, Tape, Pressure -Sensitive Adhesive, Filament Tubes, Mailing and Filing, Paper Water Reaistant Reinforced FSC 1220 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-33337B 32 U 7

5、7777Ob 0275324 b i MIL -D -1 33 1 9B(Ord) Mi lit ar y MIL-P-116 Preservation, Methods of MIL -B -1 1 7 Bags, Interior Packaging MIL -B -1 21 Barrier Material, Greaseproafed Flexible MIL -B -1 3 1 Barrier Material, Water -vaporproof, Flexible (Waterproofed) MIL-C-3133 MIL -L -3 1 50 MIL -A -5092 MIL

6、-L -60 8 5 MIL-R-6855 MIL-C-11796 STANDARDS Military Cellular Rubber Products, General Purpose Lubricating Oil, Preservative, Medium Adhesive, Rubber (Synthetic and Reclaimed Lubricating Oil; Aircraft Instrument, Low. Rubber; Synthetic, Sheet, Molded, and Extrud Corrosion Preventive, Petrolatum, Hot

7、 (Exc ept Ebonit e ) Rubber Base) Volatility for Aircraft Applications Application MIL-STD-105 MIL -STD -1 29 Sampling Procedures and Tables For Lqspection Marking for Shipment and Storage by Attributes Ordnance BPAX3 Nails, Flat Head (Part No. 1168921, Coated (Copies of specifications and standards

8、 required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer. ) 3. REQUIREMENTS 3.1 Material and methods. - The materials, methods and procedures used in the packaging of items shall be in accordan

9、ce with this specificatisn. Materials and methods not covered by a specification shall be suited to the intended use and subject to the approval of the contracting officer. /- I i - I i ;. $ .* I. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D

10、-13317B 12 W 7777706 0275125 B W MIL-D-l3319B(Ord) 3.1 1 Materiaba. - The following shall apply wherever packaging materials are referred to in this specification by name ony: REFERENCE FULL IDENTIFICATION Filament tape Type III, at least 1 inch wide of Specification PPP -T -97 Greaseproofed barrier

11、 Type I, grade A, class 2 of Speciication mat er ia 1 MIL-B-121 Gummed tape Class 2 of Specification UU -T -1 11 Paperboard cushioning Type I, class 1 af specification PPP-P-29i Pressure -sensitive tape Type I or II of Specification UU-T-106, at least 1. inch wide 3.2 Size of containers. - The float

12、ing bag and exterior container shall be of a minimum size that will adequately contain the items. 3.3 Preservation and packaging, 3.3, I Level A, 3.3.1.1 Disassembling. 3 3,l I 1.1 Ballistics Drive T24 and T24El. - The telescopic shaft assembly and the junction box assembly shall be disassembled fro

13、m the ballistics drive unit at the coupling. be disassembled from the junction box assembly at the coupling, The eight screws, with the lock washers, shall be replaced in their respective holes in each coupling of the telescopic shaft assembly, be disassembled from the ballistics drive unit at the a

14、rm. disasse-mbled units on Ballistics Drive T24E1, The telescopic shaft assembly shall The shaft assembly shall See Figure 3 for 3.3.1.1.2 Ballistics Drive M5 . - The telescopic shaf assembly and the junction box assembly shall be disassembled from the ballistics drive unit at the coupling. replaced

15、 in their respective holes in the coupling; also, the shaft assembly shall be disassembled from.the ballistiadrive unit at the arms and the 1h.k assembly shall be disassembled- from he superelevation box assembly. The four screws, with the lock washere, shall be Provided by IHSNot for ResaleNo repro

16、duction or networking permitted without license from IHS-,-,-I I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-13317B 12 7777706 0275127 1 W 3.3.1.5.1 Locating pins and mounting hardware. - The locating pins shall be placed together and wrapp

17、ed with greaseproofed barrier material. The wrapped pins and mounting hardware (screws and washers) shall be placed together and wrapped with greaseproofed barrier material. The wrap shall be secured in place with pressure-sensitive tape. pins and hardware shall be overwrapped with paperboard cushio

18、ning or they can be placed in a bag conforming to type I or II, class b of Specification MIL-B -1 17. with gummed tape and if a bag is used, it shall be closed by heat sealing or stapling. The wrzpped The paperboard cushioning wrap shall be secured in place 3.3.1.5.2 Hardware for securing shock moun

19、t for M5Al. - The bolts, nuts and. washers used to secupe the shockmount to the junction box assembly and the boIts and washers used to secure he shock mount to the vehicle shall be placed together and wrapped with greaseproofed barrier material. The wrap shall be secured in place with pressure-sens

20、itive tape, The wrapped bolts, nuts, and washers shall be placed with the shock mount, The items shall then be wrapped with paperboard cushioning, which shall be secured in place with gummed tape. drive with filament tape, The wrapped items shall be secured ta the ballistics 3.3.1 5.3 Covering prese

21、rvative coated pupl#ng surfaces . - The preservative coated surfaces of all couplings (telescopic shaft assembly and junction box assembly) shall be covered or wrapped with greaseproofed barrier material, which shall be secured in place with pressure -sensitive tape 3.3.1.5.4 Covering other preserva

22、tive coated sui;faces of the ballistics drive. - All other preservative coated surfaces of the ballistics drive (including the disassembled shaft assembly and link aseembly) shall be covered or wrapped with greaseproofed barrier material, which sbIf Ire secured in place with pressure -sensitive tape

23、. on the alao, the exposed threads on the shaft and link assemblies shall be wrapped at least twice with the aforementioned grade C greaseproofed barrier material. The wraps shall be secured in place with tape confsrming to Specification PPP-T-76 as shown in Figures 3, 4, 6 and 7. barrier material s

24、hall be placed between the mounting surfaces and the wood blocks that do not contain felt. The greaseproofed Garsier Greaseproofed 5, 71 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-33339B 32 9999906 0295328 3 W - MIL-D -1 331 9B (Ord) 3.3.1

25、.5.5 Telescopic shaft assembly and junction box assembly for T24 and T24E1 . - The telescopic shaft assembly shall be placed in a.eet-up paperboard box, conforming to type I or IV, any class andstyle of specification PPP-B-676, or in a mailing tube conforming to type II or PLT. of SpetOl - Any style

26、 under domestic type PPP-B-621 - Class 1 (domestic), style 2 or 4 9. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-VIL-D-L33LSB 12 m 7799706 0275132 5 m 3.4.3 Level C. - Each plywood base containing a ballistics drive shall be Immobilized in a ship

27、ping container as specified in 3.4.1 e 1.1 and 3,d.l. 1.2. The shipping container shall conform to one of the following specifications; PPP-B-601 - Any style under domestic type PPP-B-621 - Class 1 (domestic), any style, except 1, 5 and 6 3.4.4 Strapping. - Strapping shall be applied as specified in

28、 the applicable container specification. 9.5 Marking. 3.5.1 Interior packages. - Each floating bag shall be marked in accordance with Standard MIL-STD-129. in the Identification data on the floating bag, After the drive is bolted in position on the base, the following information shall be added on a

29、 tag which shall be attached to the coupling of the superelevation box assembly of the Ballistics Drive M5 or M5A1: The serial number of each drive shall be added CAUTION DO NOT TURN THE INTERIM DRIVE COUPLING IN EITHER DIRECTION 3.5.2 Shipping container. - Each shipping container shall be mark6d.i.

30、n accordance with Standard MIL-STD-129. the identification data on each Level A or B shipping container and omitted on the Level C shipping container. in Standard MIL-STD-129, The serial number shall be added in Fragile markings shall be applied as spec%f%ed 3. 5.3 Stock number. - The stock number t

31、o be added in the identification data shall be obtained from the contracting officer. 3.6 Preproduction pack . - Prior to quantity packaging production, a pre- production pack, consisting of a complete and packed shipping container, shall be inspected to determine conformance with the applicable req

32、uirements of th.is specification. A rough handling test is required. 3 7 Workmanship . - All operations involved in accomplishing corrosion prevention, preservation, packaging, and packing by the procedures specified herein shall be in accordance with the highest grades of practice associated with t

33、his type of work. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL -D -1 331 9B (Ord) 4. QUALITY ASSURANCE PROVISIONS 4.1 . Contractor inspection. - Unless otherwise specified herein, the supplier is responsible for the performance of all inspecti

34、on requirements prior to submission for Government inspection and acceptance. Except as otherwise specified, the supplier may utilize his own facilities or any commercial laboratory acceptable to the Government. Inspection records of the examination and tests shall be kept complete and available to

35、the Government as specified in the contract or order. 4.2 .Contractors quality qssurance system, - The contractor shall provide and maintain an dequate quality assurance system acceptable to the Government covering the supplies under the contract. A current written description of the system shall be

36、 submitted to the contracting officer prior to Initiation of production. acceptable when it provides: The written description will be considered (a) The quality assurance required by the applicable drawings and specifications listed in the contract or order. (b) Contracto.ras quality standards of ac

37、ceptability. (c) Procedure for continually evaluating product quality. (d) Procedure for continually reporting evidence of actual product quality. (e) Measures for preventing any significant departure of product quality from stadards. 4.2.1 The contractor will not be restricted to the inspection sta

38、tion or to the method of inspection listed provided that an equivalent control is includled in the approved-quality assurance procedure. In cases of dispute a8 ta whether or not certain procedures of the system provide equal assurance, the cornpasable procedure required by this specification shall b

39、e used. The contractor shall notify the Government of, and obtain approval for, any change to the written procedure that might affect the -degree of assurance required by this specification and other applicable documents referenced herein. Provided by IHSNot for ResaleNo reproduction or networking p

40、ermitted without license from IHS-,-,-MIL-D-333L7B 32 9997906 0275334 7 = 4.3 Government verification. - All quality assuradce operations performed by the contractor will be subject to Government verification at unscheduled inter- vals. Verification will consist of (a) surveillance of the operations

41、 to determine that the practices, methods, and procedures of the written inspection plan are being properly applied, and (b) Government product inspection to measure quality of product offered for acceptance. Deviation from the prescribed OF agreed-upon procedures, or instances of poor practices whi

42、ch might have a detrimental affect upon the quality of the product, will be immediately called to the attention of the contractor. F.ailure of the contractor to promptly correct deficiencies discovered will be cause for suspension of acceptance until correction has been made or until conformance of

43、product to prescribed criteria has been demonstrated. To avoid interference with operations* the contractor will designate a responsible official or officials to whom the Government inspector will report such hstances. 4.4 Preproduction pack - One preproduction pack shall be inspected by the Governm

44、ent for Conformance to the requirements outlined herein. The preproduction pack shall be representative of the manufacturer Is normal pro - duction. 4.4.1 Dip.position of rgjected pr,eproduct$on pack. - Should the prepro- duction pack fail to pass the teet for Government acceptance, the contractor s

45、hall cease those operations which are causing rejecbable material and shall make the necessary corrections. When corrections have been madel a new preproduction pack shall be tested by the contractor under the surveillance of the Government. preproduction model has successfully passed ail inspection

46、s specified. Operations causing rejections shall not be resumed until a 4.5 inspection provisions. 4.5.1 Conrol of materials. - Materials shall be tested to determine conformance to contractually applicable specifications. conducted in the prime cohtractors or subcontractors facilities, or in other

47、suitably equipped laboratories. Government inspector for review. Certified test reports, identifiable with the material, may be accepted in lieu of repeated tests. reserves the right, in any case, to require retests to assupe that the mZtb and the fact that the Government may have formulated, furnis

48、hed, or in any way supplied the said drawings, specifications, or other data is not to be regarded by implication or otherwise as in any manner licensing the holder or any other persons cm corporation, or conveying any rights or permisaion to manufacture, uses or sell any invention that may in any w

49、ay be related theretoi I Custodian: Preparing Actvhy: - Army - Ordnance Corps Army - Ordnance Corps Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-t ia. L- 3.4 I I C3.J HOTE, PLYMWX) SHALL CWOW TO TYPE I. E OR m CUSS 2 OK SPECIFICATK)N CATION OF BLOCKS Ati STRINBERS. EAL I oRn LwER FoR FMI- NOTE M)(LL ALL HOLES IN

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1