1、II . i MIL-D-20B 13 777770b 0464348 8 MIL-D-2088B (MU). - I 27 August 1968 1 SUPERSEDING MIL-D-2088A (MU) 18 March 1966 MILITARY SPEC IItt CATION DEMOLITION KIT, BANGALORE TORPEDO, M1A2 AND TORPEDO, BANGALORE, MlA1, INERT PARTS FOR 1. SCOPE 1.1 This specification covers the parts for two types of de
2、molition kits deaignated as Demolition Kit, Bangalore Torpedo, MlAZ and Torpedo, Bangalore, MlAl, Inert. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request .for proposals, form a part of this specification to the extent specified here
3、in, SPECIFICATIONS MILITARY MIL-A-2550 MIL-1-45607 - Inspection Equipment, Supply and - Ammunition and Special Weapons; General Specification for Maintenance of STANDARDS MILITARY MIL-STD-105 NIL-STD-la9 MIL-STD-1168 - Lot Numbering of Ammunition - Sampling Procedures and Tables for Inspection by At
4、tributes (ABC-STD-105) - Quality Assurance Term8 and Definitions FSC: 1375 I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-20BB 13 W 77777b 0464349 T = MIL-D-2088B (M) MIL-STD-1169 - Packaging, Packing and Marking for Shipment of Inert Ammuni
5、tion Components MIL-STD-1235 - Single and Multilevel Continuous Sampling ?rocedures and Tables for Inspection by Attributes I DRAWINGS U. S. ARMY MUNITIONS COMMAM) 8863371 - Sleeve Nose 8863372 - Sleeve Connecting 8863374 - Tube 8863375 8863376 - End Cap and Detonator Well Assembly - End Cap and Det
6、onator Well Assembly (Alternate) PUBLICATIONS U. S, ARMY MUNITIONS COMM mandatory (designated “MU“) and non-mandatory (indicated by drawing or Federal Stock Number) . equipment list references mandatory Army designs, the contractor shall comply with, and use these designs accordingly. The con- tract
7、or may, however, in connection with non-mandatory designs, and with the approval of the Government, design alternate inspection equipment or use comparable commercial equipment to facilitate his operations. Such contractor prepared designs or commercial equipment selections must be approved by the G
8、overnment prior to fabrication or procuring of the equipment. Designs shall be submitted for approval as specified in 6.3.5. When an inspection 15 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-20B 13 m 77999Ob 04b43b3 4 m 1 MIL-D-2088B (MU) f
9、. 6.3.4 Contractor designs.- Contractor designs are designs of inspection equipment for which the Government has assigned design responsibility to the contractor. Contractor designs shall be supported by detailed drawings which depict all infor- mation necessary to completely fabricate, calibrate an
10、d operate an item of inspection equipment. This requires that the necessary views, dimensions, materials, finish, notes, operating and calibration instructions be properly depicted in accordance with approved practices to the extent that further calculation or clarification will not be required. Unl
11、ess otherwise specified, contractor designs may be developed on the format the contractor normally employs in his equipment design procedure provided such format reflects the detail and information specified above, subject to the following controls: All submitted contractor designs shall conform to
12、MIL-D-1000, Category E, Form 2. Legibility and reproducibility shall permit conventional making of clearly under- standable, high contrast reproductions. Contractors shall submit three copies of final designs as a flat set. Designs shall be submitted for approval as specified in 6.3,5. 6.3.5 Submiss
13、ion of contractor designs.- All submitted designs shall contain a reference to the applicable five digit Code Number contained in Section 4 of this specification and the appropriate component or assembly drawing number and revision specified on the EL, all designs of equipment for inspection of defe
14、cts classified as critical and major shall be submitted for approval to the Commanding Officer, Picatinny Arsenal, ATTN: SMUPA-ND1. All other designs of inspection equipment shall be approved by the inspection element of the agency administering the contract; submission shall be as directed by the c
15、ontracting officer, Partial submission of inspection equipment designs is permissible and encouraged. However, the Arsenal completion date for design review will be baaed on the date of the final submission of designs. Picatinny Arsenal design review will be accomplished normally within one month after receipt. Custodian: Preparing activity: Army-MU Army-MU letter to which the specific design applies. Unless otherwise ,/-= L Project Number: 1375-A-018 16 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-