ARMY MIL-D-48865 (1)-1981 DETONATOR ELECTRIC PA500 PARTS FOR LOADING ASSEMBLING AND PACKING《PA500电雷管零件的装载 组装和包装》.pdf

上传人:unhappyhay135 文档编号:442433 上传时间:2018-11-15 格式:PDF 页数:5 大小:177.36KB
下载 相关 举报
ARMY MIL-D-48865 (1)-1981 DETONATOR ELECTRIC PA500 PARTS FOR LOADING ASSEMBLING AND PACKING《PA500电雷管零件的装载 组装和包装》.pdf_第1页
第1页 / 共5页
ARMY MIL-D-48865 (1)-1981 DETONATOR ELECTRIC PA500 PARTS FOR LOADING ASSEMBLING AND PACKING《PA500电雷管零件的装载 组装和包装》.pdf_第2页
第2页 / 共5页
ARMY MIL-D-48865 (1)-1981 DETONATOR ELECTRIC PA500 PARTS FOR LOADING ASSEMBLING AND PACKING《PA500电雷管零件的装载 组装和包装》.pdf_第3页
第3页 / 共5页
ARMY MIL-D-48865 (1)-1981 DETONATOR ELECTRIC PA500 PARTS FOR LOADING ASSEMBLING AND PACKING《PA500电雷管零件的装载 组装和包装》.pdf_第4页
第4页 / 共5页
ARMY MIL-D-48865 (1)-1981 DETONATOR ELECTRIC PA500 PARTS FOR LOADING ASSEMBLING AND PACKING《PA500电雷管零件的装载 组装和包装》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、-. MIL-D-48865 (1) 13 999990b 0324859 2 I 5#37+? MIL-D-48865 (AR) Amendment 1 29. March 1981 MILITARY SPECIFICATION DETONATOR, ELECTRIC, PA500 AND PACKING PARTS FOR, LOADING ASSEMBLING This Amendment forms a part of Military Specification MIL-D-48865 (PA) dated 30 March 1976. PAGE 1 2.1, after the p

2、aragraph number add: “Issues of documents.“ 2.1 Under the heading SPECIFICATIONS, MILIITARY: delete “MIL-G-45204 - Gold Plating, Electro deposited“ PAGE 2 2.1 After the heading DRAWINGS: add (see 6.5) Under the heading DRAWINGS: delete “PICATINNY ARSENAL“ and substitute “US ARMY ARMAMEWI RESEARCH AN

3、D DEVELOPMENT COMMAND“ After the last drawing listed insert the following parenthetical statement: “ (Copies of specif ications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed

4、by the Contracting Officer) .“ 3.3 line 3: delete the words, “when tested as specified in 4.5.2 3.4 line 3: delete the words, “when tested as specified in 4.5.3“ PAGE 3 3.6.1 line 3: delete the words “when tested as specified in 4.5.8.1“ 3.6.2 line 2: after 3.6.1 add “and 3.6.318 line 4: in 4.5.8.2“

5、 delete the words “, when tested as specified FSC: 1375 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-48865 (1) 13 m 7799706 0324860 7 MIL-D-48865 (AR) Amendment 1 3.6.3 line 2: delete the words “when tested as specified in 4.5.8.3“ 3.7.1 lin

6、e 5: delete the words “and tested as specified in 4.5.9.1“ 3.7.2 line 3: delete the words “and tested as specified in 4.5.9.2“ 3.7.3 line 3: delete khe words “and tested as specified in 4.5.9.3l Add new paragraph 3.10 as follows: “3.10 GOLD PLATING FINISH - Gold Plating shall be smooth, fine grained

7、, adherent and free from exposed base metal or underplate, visible blisters, pits, nodules, porosity, indications of burning, excessive edge build up, residual plating salts, and other detrimental defects. Correction of a burned condition by burnishing or tumbling is not acceptable.“ PAGE 5 Table I,

8、 in the column “Requirement Paragraph“ for Gold Plating of Electrodes: change “3.2“ to “3.10“. PAGE 11 4.4.2.4, delete Major Defects 101 and 102 in their entirety. PAGE 12 4.4.2.5 Major Defect 105: change the last four column entries to read “(a)“, “0.40%“, “3.10“, “4.5.4/Gagen. “Sampling applies to

9、 each plating lot“. Under the heading Notes: change note (a) to read PAGE 18 4.4.2.11 Major Defect 108: change the last column entry to read “Visual“ PAGE 19 4.4.4, line 8: change “6.2“ to read “6.3“. PAGE 2 of 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr

10、om IHS-,-,-MIL-D-48865 (AR) Amendment 1 4.5.4, delete in its entirety and substitute: “Gold Platinq of Electrodes. The gold plating shall be visually examined at four (4) diameters magnification, minimum, for compliance to the requirements. PAGE 21 4.5.8.2, line 11, after “shall be recorded“: add “a

11、nd evaluated to determine compliance with the requirements“ . PAGE 22 4.5.9.2, add the following note after the end of the paragraph : “NOTE: If functioning at the maintained conditioning temperature is impractical, the detonator shall be functioned within one (1) minute of its removal from the cond

12、itioning chamber. All components, used in this functioning test (that is detonator, containment fixture, and witness block) shall be temper ature cond i ti oned . 4.5.9.3, add the following note after the end of the paragraph: “NOTE: IF functioning at the maintained conditioning temperature is impra

13、ctical, the detonator shall be functioned within one (1) minute of its removal from the conditioning chamber. All components, used in this functioning test (that is detonator, containment fixture, and witness block) shall be termperature conditioned“ . PAGE 23 6.1, delete in its entirety and substit

14、ute: “6.1 Intended Use. Detonators covered by this specifi- cation are intended for use in the M934 Fuze for the Stinger Missile. “ 6.2, delete in its entirety and Substitute: “6.2 Orderinq Data. See MIL-A-48078 (AR) . PAGE 3 Of 5 Provided by IHSNot for ResaleNo reproduction or networking permitted

15、without license from IHS-,-,- MIL-D-4bC (2) 23 7797906 0324b2 2 MIL-D-48865 (AR) Amendment 1 PAGE 24 6.3, delete in its entirety and substitute: “6.3 Submission of Inspection Equipment Designs for Approval See MIL-A-48078 - Submit equipment designs, as required, to Commander, US Army Armament Resear

16、ch and Development Command, ATTN: DRDAR-QAR-I, Dover, New Jersey, 07801. I Add new paragraph as follows: “6.4 Check Test for Possible Deterioration. The following test is designed to prevent the loading of detonators which have deteriorated, into a major ammunition item. The test shall be performed

17、on detonators from each lot which has been stored under normal conditions for more than two years, or under adverse conditions for any period of time. If the specification for the ammunition item into which the detonators are loaded does not require that the check test be performed, the contracting

18、officer should insert a provision for the performance of the check test in that contract. The contracting officer will arrange for the contractor to be reimbursed for expenses incurred in the performance of the check test for possible deterioration. Two hundred (200) detonators shall be selected fro

19、m each lot for this test.“ Add new paragraph as follows: “6.4.1 Functioning. The detonators shall be selected at random from each lot. The detonators shall be tested in the following sequence. a. Measure resistance between electrodes, using a current limited to one milliampere. The resistance shall

20、be no less than 2.5 ohms nor more than 4.0 ohms. If any detonator fails to meet the requirement, it shall be classed defective. If four or more defectives occur, the lot shall be rejected. b. The detonators that are not classed defective in step a. shall be functioned as specified in 4.5.8.1 and mee

21、t the requirements of 3.6.1. If any detonator fails to meet the requirements, it shall be classed defective. If one or more defectives occur, the lot shall be rejected.“ PAGE 4 of 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-qb5 (1) 13 m 7

22、77770b 0324863 4 MIL-D-48865 (AR) Amendment 1 Add new paragraph as follows: “6.5 Drawings. Drawings listed in Section 2 of this specification under the headings US Army Armament Research and Development Command (ARRADCOM) may also include drawings prepared by, and identified as, Edgewood Arsenal, Fr

23、ankford Arsenal, Rock Island Arsenal or Picatinny Arsenal drawings. Technical Data originally prepared by these activities is now under the cognizance of ARRADCOMOn Custodian: Army-AR *US. GOVERNMENT PRINTINQ OFFICE: 1981 - 703-01312193 Preparing Activity: Army-AR Project Number: 1375-173 PAGE 5 Of 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1