1、Ma-I)-60094 (MU) 30 October 1964 DETONATOR, ELECTRIC, 23465 PmS FOR 1. SCOPE 1.1 This specification covers the parts for one type of detonator designated as Detonator, Electric, XM65. 2. APPLIC- mS 2.1 The following documents of the Issue In effect on date . .- of invitation for bids or request for
2、proposal form a part of this speclficatlon to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2550 Specification for. MIL-P-10025 - Pacaing, Packing and Markhg for Interplant, Shipment of Inert Ammunition Components, General Specification for, MIL-1-45208 - Inspection Requirements, Genera
3、l Specification for. MDt-1-45607 - Inspection Equipment, Supply and Maintenance of. - Ammunition and Special Weapons; Qeneral MIL-STD-105 MIL-STD-109 MIL-STD-1235 - Single and Multilevel Continuous - Sampling Procedure8 and Table8 for Inspection by Attributes (ABC-STD-105). - Quality Assurance Tcm16
4、 and Definitions. -Sampling Procedures and Tables for Inspection by Attributas. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-60074 13 7777906 0335497 5 MILD40094 (MU) =WINGS 0-E CORPS 9204231 - gridge and PlUg Assembly 9204252 - Pl- AsCmbly
5、9204233 - CUP 9204234 = Plus 9204235 = Pin FWBLICATIO#S oRlx?ANm. cow iEZ-92006.c8 -,index of Inspection Equlpnt Lists. (copie8 Of SwCif ICatIOn8, 8tWWd8, dP8M-S and publiCatiOn8 required by contractor3 irr connection with speclilc procurement ltunctione should be obtained from the procuring activit
6、y or a8 dlmcted by the contracting officer) 3. FEQuIREm 3.1 Material.-Haterlala shall be In accoxvbnce with applicable 3.2 Parts.-The prts ahall comply with all requirements drawLnr3s and spclf lcatlona . spclf led on Drawlnga ( s of Specification Ma-1-45208. The contractors quality assurance system
7、 shall contain a procecwe for the reporting of critical defectives found durfng the course of his Inspection and during inspection by the Government. Any critical defect encountered, unless ann0tate.d by an asterisk (*) to the right of the characterlstlc code number(see 6.2), will be reported within
8、 48 hours. critical defects annotated by an asterisk will be fUrnlshe3. The agencies to whom the reports will be furnished are Identified In paragraph 6.5. The reporta shall contain, as a minimum, the f ollowing information: A monthly summary report covering those a. Contractor. and contract number.
9、 b. c. Characteristic code number. d. Lot or serial number. e. Number of defectives found. f. g. Corrective action taken or recommended. When the Number and revision date of specification. Assignable cause or analysis of occurrence. corrective action is beyond the control of the contractor or the sc
10、ope of the contract, the report shall contain the contractorrs recommendation to the Government. Submlsslon of product.-At the time the completed lot. of product io submitted to the ovement for acceptance the contractor shall supply the following information accompanle by a certificate which attests
11、 that the Information provided is correct and applicable to the product being submitted: assurance proviclions of the approved current written deecription of the system. _. -. 4.1.2 a. b. O. A statement that the lot complies wlth all quality Number of units of product inspected. Resulta obtained for
12、 all Inspection performed. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-6009q 13 9979706 0335q77 9 PIIL-D-60094 (MU) d. Drawing, specification number anddate, together with e. f. Number of items In the lot. g. Date submitted. an Identifica
13、tion and bate of changes. Certificates of compliance on all material purchased by the contractor when such material Is controlled by Qoosrnment specifications referenced in any of the contractual documents. The certificate shall be signed by a responsible agent of the certifying organization. be sub
14、stantiated by evidence of the agents authority to bind his principal. be required with subsequent ccrtiflcatea unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.1.3 quality assurance procedure, this detail specification, the applic
15、able rawings and other contractual documents as a guide? the Government fnspeetor shall verify at unscheduled Sntarvala all quality asaurance operations performed by the contractor. Verification will be in accordance with Specification ML-1-45208. and will be performed to the extent necessary to asa
16、um compliance with th8 contractual requirements. irispection of individual characteristics will be directly related to the seriousness of the claselfication assigned, In no instance will a characteristic classified *critical be accepted solely on the basis of the contractors records. The initial cer
17、tificate submitted shall Substantiation of the agents authority will not Government verification.-Using the contractors written Severity of Qovem 4.2 Initfal production inspection. 4.2.1 Submis8ion.-Prior to the start of regular production, the contraotor shall submit an initial production sample to
18、 a Government approved facility as designated by the Contracting Officer (see 6.4) for evaluation in accordance with the poviaions of 4.2.2. The initial production sample shall consist uf 50 complete sets of parts and 50 ea inert sub-assemblies which have been moduced by the contractor or furnished
19、by a supplier and mich has been manufactured using the same production oce8ies, procedures and equlpnent which will be used in fulfilling the contract. All parts and materials, Including packaging and packing, shall be obtained from the same sources of supply as will be used in regular production. o
20、f compliance for materials. or portion thereof, as directed by the Contracting Officer, shall The sample shall be accompanied by certificates An Initial production sample Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-D-60094 13 999990b 0335500
21、 1 i I3fL-O- 60094 (MU) . also be submitted whenever there is a lapse in production for a period in excess of 90 days, or whenever a change occurs in manufacturing process, material used, drawing, specification or source of supply as to significantly affect product uniformity as determined by the Go
22、vernment. Prior to submission, the con- tractor shall inspect the sample to the degree necessary to assure that It conforms to the requirements of the contract and submit a record of this inspection with the sample. A sample containing hown defects will not be aubmitted unless specifically authorize
23、d by the Contracting Officer. 4.2.2 Inspections to be performed.-Components will be sub- jected be the Government to any or all of the examinations specified in this apecliicaton and any or all requirements of the applicable drawings. 4.2.3 Rejection.-If any component falle to comply with any or all
24、 of the applicable requirements, the initial production sample shall be rejected. The Government reserves the right to terminate its inspection upon any failure of a component in the sample to comply with any or all of the stated requirements. the event of rejection, the Government reserves the righ
25、t to require the contractor to take corrective action and submit a new initial production sample or portion thereof. production sample is accepted, the contractor is, in no way, authorized by the Government to initiate regular production unless otherwise directed by the Contracting Officer. in Until
26、 an initial 4.3 Inspection grovisions . 4.3.1 Lot formation.-A lot shall consiat of parts produced by one manufacturer in one unchanged processg in accordance with the same drawing, same drawing revision, same specification, and same specification revision. Drawing, specificaton and process Change6
27、not affecting safety, performance, or fit, as determined by the Government, shall not necessitate changing the lot interfix number. Lots shall be submitted for inspection In accordance with Standard MIL-STD-105 (or Standsrd MIL-STD-1235 when applicable). - . 4.3.2 Examination.-Smpllng plane and poce
28、dures for the following claelflcatlons of defects shall be in accordance with Standard MIL-STD-105 except that Inspection for critical defects, when listed, shall be 100 gercent. Continobs sampling plans in Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS
29、-,-,-MIL-D-b0074 13 = 7777706 0335503 3 NIL-P- 60094 (KU) acco;.dance wth Standard MIL-STD-1235 may be used, for defects other than crltlcal, If approved by the procuring activity. Also, at the option of the p?ocurlng activity, AQLs and sampling plans my be applied to the inlvldual characteristics l
30、isted using an AQL of 0.10 percent tor each major defect and an AQL of 0.65 percent for each minor defect. Derformanca of the inssctions listed shall be in accordance nlth Equlpnent neceaaary for the Method of inspection Code #o. (see 6.2) 6 Critical : Major: AQL 0.65 percent 1. Cup eplit or cracd,.
31、Viaual 101. Thicheaa tbo*jgh bottom . .Gage 102. Outside diaIn8ttW, rnaxbuul (max).Gage 103. Total length, min.aage 104. Cup dented or diatorted.,.Visual 201. inside lametar, mlnGage 202. Evidence of poor workmanship Hinor : AQL 1.00 percent (see 3.3) .vaual 4.3.2.2 Pin (see isual 03006 4.3.3 Produc
32、tion testing 4.3.3.1 Puah test of pin after machining (see wg. 9204232) - Major defect - Code No. 03007.-A sample of 150 plug assemblies shall be selected at random from each lot. fi two or more plug aasembliea fail to comply with the requirerent 6pecifled the lot ahall be rejected. The test shall b
33、e performed as specified In 4.4.1 using teat equipment specifled in 4.3.4. falls to comply with the requirement shall be Classed defective. Any assembly which I . 1 .- . 4.3.3.2 Electrical resistance between pin and plug (see wg. 9204231) - MaJor defect - Code No. 03008.-Thls test shall be performed
34、 100 percent. The test shall be performed a8 specified in 4.4.2 using tegt equipment specified in 4.3.4. Any assembly which fails to comply with the requirement shall be clasaed defective and removed from the lot. Inspection Equipment. -Index or Inspection Equipnent . Number fEt-9200648 identifies t
35、he inspection equipaent required to perform the examinations and tests prescribed in this section. The contractor shall design inspection equipment in accordance with the instwctions in paragraph 6.3. equipment drawings and lista provided and revised in accordance wlth the rsqulremunts of the IEL ma
36、y be used by DOD activities *4. 3.4 4.3.4.1 overnment rights to documentation.-Inspection 7 I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-hO07LI 13 7777906 0335503 7 HIL-0-60094 (M) for design, procurement, manufacture, testing, evaluation,
37、 pawduction and receiving inapection, overhaul, shipping, storage, ldentlf ication of stock, ordering and storage of replacement parts, Inspection of items at overhaul, general Piaintenance of equlpent, construction, survey and whenever inspection equipuent drawings are needed. the equipment listed
38、on the EL shall be in accordance with Specification Ha-1-45607. overnnent uae of contractors inspection und test squipPient.-Tho cor,tractor shall maka available to the Goverment all inspection and test equipnent necessary for determining con- formance with contract requirements. equipmnt, and verif
39、ication of its accuracy, ehell be supplied by the contpactor for the performance of exaairxitlon or test by the Government . 4.3.4.2 Supply and maintenance.-Supply and maintenance of 4.3.4.3 Psraonnsl for operating the 4.4 Tst methods and proceduPt?#. 4.4.1 Push tost OZ pin eftsr machining.-The plug
40、 a88e1bly shall be placed in 8 hol of inspection crqulpnt (O0 Form 1242-3) the nunbepa of drawings of existing equipnent desims or codas ned in the %L by the following codes: CIIAF - Contpactorga design responsibillty on Army formt In CDCF - Contractaris design responsibllity on contractor AD - Army
41、 design. AWJ - Army design, mandatory for useo CE - Commercial equipment. SCD - Specification control drawing. accordance With Ma-D-65608. romt . 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-6007Y 13 7977706 0335505 O W MIL-D- 60094 (MU) 6
42、.3.3 Army designs.-Army designs ara reflected on detail the Army Ammunition Procurement and Supply Agency, ATTN: SNAP-RO; Picatinny Arsenal, Al“: SMPA-ND. Munitions Command procurements, critical defect reporting shall be as prescribed by the Contracting Officer. Contractor designs identified as CDL
43、F - 6.3.7 Submiesion of contractor designa.-Designs shall be Partial submission Upon All Commanding Officer, Picatinny 6.5.1 Reporting to other services.-For other than U. S. Army Custodian: -Mu Project NO. 1375-A 788 Preparing activity: Army-m 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-