1、- - MIL-D-70b02 13 I 997970b 0355798 b f , 3- 3-9- i9 MIL-D-70602 (AR) 6 June 1986 a MILITARY SPECIFICATION DETONATOR, STAB, PA523 PARTS FOR I This specification is approved for use within the U.S. Army Armamentt Munitions and Chemical Command, and is available for use by all Departments and Agencie
2、s of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers quality assurance P provisions and preparation for delivery for the loading and I assembling of Detonator, Stab, PA523. I l 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The followin
3、g specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISSI and supplement thereto, listed in
4、the solicitation. SPECIFICATIONS MILITARY MIL-STD-1169 - Packaging, Packing and Marking for Shipment of Inert Ammuni tion Components. MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification For - Beneficial comments (recommendations, additions, deletions) and any perti
5、nent data which may be of use in improv- ing this documentshould be addressed to: Commander, US. Army Armament Research, Development and Engineer- ing Center. Ath: AMSMC-QA, Dover. New Jersey 07801-5001 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearin
6、g at the end of this document or by letter. /- I 1- THIS DOCUMENT CONTAINS / PAGES. AMSC N/A FSC 1345 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. a- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-70b02 13
7、9999POb 0355999 W MIL-D-70 602 (AR) STANDARDS MILITARY MIL -S TD- 1 O 5 - Sampling Procedures and Table for MIL -S TD- 12 3 5 - Continuous Sampling Procedures and Inspection by Attributes. Table for Inspection by Attributes. (Copies of specifications, standards , drawings, and publications and other
8、 Government documents required by the suppliers in connection with specific procurement functions shall be obtained from the procuring activity or as directed by the Contracting Officer). 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings
9、, and publications Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. - form a part of this specification to the extent specified herein. DRAWINGS . u.S. ARMY ARMAMINT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC ) 87 95 797 - Disc, Detonator 87 9
10、7036 - Disc , Detonator Closing 8797745 - Cup , Detonator 2.2 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this specification shall take precedence Nothing in this specification, however , shall supersede applicab
11、le laws and * .regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Material. Materials, parts and assemblies shall be in accordance with applicable drawings, specifications and standards. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without licens
12、e from IHS-,-,- MIL-D-70602 13 I 997970b 035b000 9 E MIL-D-70602 (AR) 3.2 Parts. The parts shall comply-with all requirements specified on Drawings (dwgs.) 9358081, 9358082, and 9358083 as applicable, and with all requirements specified in applicable a specifications. 3.3 First article inspection. T
13、his specification contains provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 3.4 Workmanship. All parts and assemblies shall be fabricated and finished in a thorough workmanlike manner and all ma
14、nufacturing, processing, and assembly operations shall be correctly performed. They shall be clean and free of cracks, gouges, burrs, sharp edges, unblended radii, surface defects, chips, dirt, grease, and oil (except where specifically required), corrosion products, and other foreign matter. The cl
15、eaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. Exterior surface coatings shall be continuous except for a few light scratches not exposing base material. All required markings shall be neat, and sharply defined. All packing shall be d
16、ry. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance provisions. Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.1.1 Responsibility for complianc
17、e. All items must meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the res
18、ponsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to a
19、cceptance of defective material. a 3.2 Classification of inspections. The inspection requirements specified herein are classified as follows: a. First article inspection. b. Quality conformance inspection. 4.3 First article inspection. 4.3.1 Submission. The contractor shall submit a first article sa
20、mple as designated by the Contracting Officer or evaluation in accordance with provisions of 4.3.2. The first article sample shall 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-70b02 13 U 777770b 0356001 O = MIL-D-706 02 (AR) The first arti
21、cle sample shall be evaluated in accordance with the provisions of 4.3.2 and 4.3.3. Unless otherwise directed by the Contracting Officer, loaded components shall not be submitted to a Proving Ground for any test until the above assemblies submitted in accordance with this paragraph have been accepte
22、d. 4.3.2 Inspections to be performed. See MIL-A-48078 and Table I specified herein. If any item fails to comply with any of the applicable requirements, the first article sample shall be rejected. 4.3.3 Rejection. See MIL-A-48078. If any items fails to comply with any of the applicable requirements,
23、 the first article sample shall be rejected. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-70602 13 I 0b O356002 2 I 6 c U 3 d c1 m rJ N N -3 -3 -3 v -3 v . . . . . . . . m m m m m m . O O O In In In 5 U al v) S al n c - U s 3 05 3 C 7 n E L
24、O LL v) al U la c Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-70b02 13 m 777770b 035b003 4 m MIL-D-70 602 (AR) 4.4 Quality conformance inspection. 4.4.1 Inspection lot formation. Inspection lots shall comply with the lot formation provision
25、s of MIL-A-48078. 4. 4. 2 Examination. See MIL-A-48078. a. Samplinq plans. Unless otherwise specified in the Classification of Defects and Tests Tables, sampling plans and procedures for major and minor defects shall be in accordance with MIL-STD-105, Inspection Level II. Continuous sampling plans i
26、n accordance with MIL-STD-1235 may be used if approved by the pr ocur i ng act i vi ty . 4 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-70b02 13 E 7770b 035b00Li b W I ri ti ri Ei B &I O U m c O +, al n 4 U u) Q .Fi ri a -r -Y * . .- CIN *
27、 mm m e. mm . O0 O m al C -Fi u) c W Liu) u) al alal C rcI UC a ay: E al EU Y .L m a) oi 3 C r- h n v n W Y Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-70602 13 9999906 035b005 B m I c p: 4 c (v O La O I- l c1 I c : 4. 8 li B m .c .d tn O 4
28、 -u. u O 4J m c O 3, a, CI . u ltn NCJ d O S c - U n m al rn 3 C n O a E L O IL h n v O m _. W U m 9 W LL E L O LL Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-70602 13 W 7997706 035b007 I W MIL-D-70602 (AR) 4.4.3 Testinq. Testing is describ
29、ed in the First Article and . : Quality Conformance Inspection Tables. 4.4.4 Inspection equipment. The inspection equipment required to perform the inspections and test prescribed in this specification is identified in the “Paragraph Reference/Inspection Method“ column in the table starting with par
30、agraph 4.4.2.1, and the test method paragraph (see 4.5) . The contractor shall submit for approval inspection equipment designs in accordance with the terms of the contract. See Section 6 of MIL-A-48078, and 6.3 herein. 4.5 Methods of inspection. Not applicable 5. PACKAGING 5.1 Packaqinq. c 5.1.1 Le
31、vel C. Packing and marking shall be in accordance with Specification MIL-STD-1169. 6.1 Ordering data. See MIL-A-48078. 6.2 Data cards. (See MIL-A-48078). Distribution of data cards shall include the following: Commander, US ARDEC, ATTN: AMSMC-QAT-M (D) , Dover, New Jersey 07801-5001. 6.3 Submission
32、of inspection equipment desiqns for approval. (See MIL-A-48078). Equipment designs shall be submitted as required to: Commander , US ARDEC, ATTN: AMSMC-QAT-I (D) , Dover, New Jersey 07801-5001. 6.4 Drawings. Drawings listed in sect-ion 2 of this specification under the heading US Army Armament Resea
33、r-ch, Development and Engineering Center (ARDEC) may also include drawings prepared by and identified as US Army Armament Research and Development Command (ARRADCOM) , Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal or Picatinny Arsenal drawings. under the cognizance of ARDEC. . Technical d
34、ata originally prepared by these activities a 6.5 Chanqes from previous issue. Asterisks are not this revision to identify changes with respect to the pr issue, due to the extensiveness of the changes. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
35、MIL-D-70602 13 I 779770b 0356008 3 I MIL-D-70602 (AR) 6.6 Subject term (key word) listing. Detonator, Stab Disc CUP Cuc tod i an : Army-AR Preparing activity: Army-AR (Project 1345-A3 61) 11 U.8. BOVERNHENT PRINTINS OFFICE: 19% - 603-056/45229 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-