1、AMSC N/A Page 1 of 2 FSC 8455 INCH-POUND MIL-DTL-3628/46F 15 August 2009 SUPERSEDING MIL-DTL-3628/46E 15 November 1996 DETAIL SPECIFICATION SHEET BADGE, QUALIFICATION, INTER-DIVISION PISTOL TEAM, MARINE CORPS This specification is approved for use by all Departments and Agencies of the Department of
2、 Defense. The requirements for acquiring the product described herein shall consist of this specification sheet and the latest issue of MIL-DTL-3628. MATERIAL: Red Brass FINISH: OBVERSE: PENDANT: Gold Plated, Relieved, Polished Highlights and shall match The Institute of Heraldry (TIOH) Metal Finish
3、 Chip Number 8. SUSPENSION BAR AND LINKS: Gold Plated, Matte Finish Polished Highlights and shall match TIOH Metal Finish Chip Number 8. REVERSE: PENDANT: Gold Plated, Mirror-like Polished and shall match TIOH Metal Finish Chip Number 6. SUSPENSION BAR AND LINKS: Gold Plated, Mirror-like Polished an
4、d shall match TIOH Metal Finish Chip Number 6. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-3628/46F Page 2 of 2 DIMENSIONS: HEIGHT (Overall): ASSEMBLED: 2 inches (REF) PENDANT (Excluding Lugs): 1-1/2 inch (REF) SUSPENSION BAR (Excluding L
5、ugs): 9/32 inch (REF) WIDTH (Overall): PENDANT: 1 inch (REF) SUSPENSION BAR (Including Balls): 1-17/32 inches (REF) THICKNESS: PENDANT (At Thickest Point): 0.110 inch + 0.005 inch SUSPENSION BAR (At Rim): 0.065 inch + 0.005 inch NOTES: 1. The term (REF) refers to the measurements taken from the Gove
6、rnment furnished hub or die. 2. The lugs are an integral part of both the pendant and the suspension bar. 3. The connecting links shall be formed from 0.042 inch + 0.002 inch diameter wire, shall be oblong shaped and 3/16 inch + 1/64 inch long by 1/8 inch + 1/64 inch wide. 4. The attaching device sh
7、all be a prong and flat ball clutch type. The prongs shall be located on the horizontal center line of the back of the suspension bar equidistant from each end and 1-1/8 inches + 1/32 inch apart. CHANGES FROM PREVIOUS ISSUE: The margins of this specification are marked with vertical lines to indicat
8、e where changes from the previous issue were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespect
9、ive of the marginal notations and relationship to the last previous issue. Custodian: Preparing activity: Army - IH Army - IH Navy - MC (Project No. 8455-2009-102) Review activities: DLA - CT NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at http:/assist.daps.dla.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-