ARMY MIL-DTL-44484-1996 TRUSS ASSEMBLY PLATFORM TYPE V《V型装卸台扎》.pdf

上传人:吴艺期 文档编号:444296 上传时间:2018-11-15 格式:PDF 页数:5 大小:200.59KB
下载 相关 举报
ARMY MIL-DTL-44484-1996 TRUSS ASSEMBLY PLATFORM TYPE V《V型装卸台扎》.pdf_第1页
第1页 / 共5页
ARMY MIL-DTL-44484-1996 TRUSS ASSEMBLY PLATFORM TYPE V《V型装卸台扎》.pdf_第2页
第2页 / 共5页
ARMY MIL-DTL-44484-1996 TRUSS ASSEMBLY PLATFORM TYPE V《V型装卸台扎》.pdf_第3页
第3页 / 共5页
ARMY MIL-DTL-44484-1996 TRUSS ASSEMBLY PLATFORM TYPE V《V型装卸台扎》.pdf_第4页
第4页 / 共5页
ARMY MIL-DTL-44484-1996 TRUSS ASSEMBLY PLATFORM TYPE V《V型装卸台扎》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、I INCH-POUND 1 MIL-DTL-44484 28 MAY 1996 DETAIL SPECIFICATION TRUSS ASSEMBLY, PLATFORM, TYPE V This specification is approved for use by the Natick Research, Development, and Engineering Center, Department of the Army, and is available for use by all Departments and Agencies of the Department of Def

2、ense. 1. SCOPE 1.1 ScoDe. This specification covers 1 type of Truss Assembly used with the Type V Airdrop Platform. 1.2 Classification. The Trusses will be of the following sizes, and as specified (see 6.2). Type 1 - 12 Foot Type II - 16 Foot Type III - 20 Foot Type IV - 24 Foot Beneficial comments

3、(recommendations, additions, deletions) and any pertinent data which may be used in improving this document should be addressed to: U.S. Army Natick Research, Development, and Engineering Center, Natick, MA 01760-5017, by using the Standardization Document Improvement Proposal (DD Form 1426) appeari

4、ng at the end of this document or by letter. AMSC N/A FSC 1670 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Licensed by Information Handling ServicesMIL-DTL-44484 9999906 2039209 347 I * MIL-DTL-44484 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in t

5、his section are needed to meet the requirements specified in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the complete

6、ness of this list, document users are cutioned that they must meet all specifjed requirements documents cited in sections 3 and 4 of this specification, whether or not they .are listed. 2.2 Government documents 2.2.1 Other Government documents, drawinss, and rmblications. The following other Governm

7、ent documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. DRAWINGS U.S. ARMY NATICK RESEARCH, DEVELOPMENT, AND ENGINEERING CENTER 11-1-3600 - Truss Assembly Installation, Airdrop

8、(Copies of drawings are available from the U.S. Army Natick Research, Development, and Engineering Center, ATTN: SSCNC-MII, Natick, MA 01760-5017.) 2.3 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes p

9、recedence. Nothing in this document,however,supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified(see 6.2), a sample shall be subjected to first article inspection in accordance with 4.2. 3.2 Materials. Materials a

10、nd components shall be as specified on Drawing 11-1-3600 and all subsidiary drawings and parts lists and as specified herein. It is encouraged that recycled material be used when practical as long as it meets the requirements of this specification. 2 Licensed by Information Handling Services MIL-DTL

11、-44484 m 9999906 2OL92LO O69 W MIL-DTL-44484 3.3 Construction. Assemblies and components shall be constructed in accordance with the requirements of the Drawing 11-1-3600 and all subsidiary drawings and parts lists. 3.4 WorkmanshiD. The end item shall conform to the quality of product established by

12、 this specification. All components and assemblies of the Truss Assembly shall be free of any rust or corrosion, dirt and other foreign matter. All surfaces shall be free from sharp edges or burrs. Components shall not be fractured, cracked, buckled, loose, dented, missing, malformed or misaligned.

13、4. VERIFICATION 4.1 Classification of inspections. The inspection requirements specified herein are classified as follows: a. First article inspection (see 4.2). b. Conformance inspection (see 4.3). 4.2 First article inspection. When a first article is required (see 3.1 and 6.2), it shall be examine

14、d for the defects specified in 4.6 and 4.7. Any nonconformance shall be cause for the rejection of the first article. 4.3 Conformance Insnection. Conformance inspection shall include the examinations of 4.6 and 4.7. 4.4 Component and material inspection. In accordance with 4.1, components and materi

15、als shall be inspected in accordance with all the requirements of referenced documents unless otherwise excluded, amended, modified, or qualified in this specification or applicable purchase document. 4.5 In-process inspection. Inspection of subassemblies shall be made to ascertain that construction

16、 details which cannotebe examined in the finished product are in accordance with specified requirements. Whenever nonconformance is noted, correction shall be made to affected items and process. Items that cannot be corrected shall be removed from the process. The Government reserves the right to ex

17、clude from consideration for acceptance, any material or service for which in- process inspection has indicated nonconformance. 4.6 End item visual examination. The end items, defined as completely fabricated units of the Truss Assembly being purchased, shall be examined for the defects listed in ta

18、ble I. The lot size shall be expressed in units of Truss Assemblies. The sample unit shall be one Truss assembly. The finding of any defect shall be cause for the rejection of the lot. 3 Licensed by Information Handling ServicesMIL-DTL-44484 TABLE I End item visual defects Examine Defect Final paint

19、 Construction and workmanship Marking Color not as specified Tacky (not dry to touch) Color separation Incomplete Blistered, peeling, flaking, or not adherent Embedded dirt or other foreign matter Any component missing, cracked, fractured, misaligned, or malformed (unless otherwise classified herein

20、) Any component not assembled or joined as specified Any sharp edges, burrs, or metal slivers Any machine screw or rivet missing, loose or wrong type One rivet not properly set (i.e., head cracked, cocked, ringed or not flush) More than one rivet not properly set Missing, incomplete, not legible, or

21、 otherwise not as specified 4.7 End item dimensional examination. Examination of the enditems, defined as completely fabricated units of the Truss Assembly being purchased, shall be examined for conformance to the dimensions specified on the drawings. Any dimensions not within the specified toleranc

22、e shall be classified as a defect. The lot size shall be expressed in units of Truss Assemblies. The sample unit shall be one Truss Assembly. The finding of any defect shall be cause for the rejection of the lot. 5. PACKAGING 5.1 Packaainq. For acquisition purposes, the packaging requirements shall

23、be as specified in thecontract or order (see 6.2). When actual packaging of material is to be performed by DoD personnel, these personnel need to contact the responsible packaging activity to ascertain requisite packaging requirements. Packaging requirements are maintained by the Inventory Control P

24、oints packaging activity within the Military Department or Defense Agency, or within the Military Departments System Command. Packaging data retrieval is available from the managing Military Departments or Defense Agencys automated packaging files, CD-ROM products, or by contacting the responsible p

25、ackaging activity. 4 Licensed by Information Handling Services6. NOTES (This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.) 6.1 document is to strengthen and link together several combinations of the Type V platform. 6.2 Acauisition requir

26、ements. Acquisition documents must specify the following : Intended use. The intended use of the Trusses described in this a. b. 6. d. e f. g* Title, number, and date of this specification. Type and size (see 1.2). Issue of DODISS to be cited in the solicitation, and if required, the specific issue

27、of individual documents referenced (see 2.3). When first article is required (see 3.1, 4.2, and 6.3). Preservation and packing (see 5.1). Palletization (see 5.2). Marking,if required, see (5.3). 6.3 Subject term (key word) listing. Airdrop System Cargo loads Modular assemblies Parachute Resupply Platform Custodians: Army - GL Navy - AS Air Force - 99 Preparing Activity: (Froj ect 167 0-082 7 ) Army -GL Review Activities: Army - AV 5 Licensed by Information Handling Services

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1