1、o MIL-E-70694A (AR)26 September 1991SUPERSEDINGMIL-E-70694 (AR)30 December 1988MILITARY SPECIFICATIONELECTRONIC CONTROL INIT: 11784504This specification is approved for use by the U.S. ArmyArmament, Munitions and Chemical Command, and is available for useby all Departments and Agencies of the Depart
2、ment of Defense.1. SCOPE1.1 Scope. This specification covers the general requirementsand tests for the Electronic Control Unit (ECU) part of the ImprovedLifting Target Elevating Mechanism (ILTEM) and the Target HoldingMechanism/Tank Gunnery (THWTG) for the Remote Target System (RETS)(see 6.1).2. APP
3、LICABLE DOCUMENTS2.1 Government documents.2.1.1 Specifications, standards and handbooks. The followingspecifications, standards and handbooks form a part of this documentto the extent specified herein. Unless otherwise specified, theissues of these documents are those listed in the issue of theDepar
4、tment of Defense Index of Specifications and Standards (DODISS)and supplement thereto, cited in the solicitation (see 6.2).SPECIFICATIONSMILITARYMIL-F-13926MIL-I-45607Fire Control Materiel, Manufacture andInspection, General Specification forInspection Squipment, Acquisition,Maintenance and Disposit
5、ion ofamo16.al (rmmmmdatiun,rxldidm$,dclcdmr)Mdnoypcrdncntdala t+tLicbmydistributionisunlhnh.ut.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-E-70694A (AR)STANDARDSMILITARYMIL-STD-109 - Quality Assurance Terms and DefinitionsMIL-STD-81O - Envir
6、onmental Test Methods and EngineeringGuidelinesMIL-STD-2000 - Standard Requirements for SolderingElectrical and Electronic Assembliesotherwise indicated. coDies of federal and militarv(Unlessspecifications, standards, and handbooks are available fro thestandardization Documents Order Desk, Building
7、4D, 700 RobbinsAvenue, Philadelphia, PA 19111-5094. ) ?2.1.2 Other Government documents, drawinqs and publications.The following other Government documents, drawings and publications -form a part of this document to the extent specified herein. Unlessotherwise specified, the issues are those cited i
8、n the solicitation.DRAWINGS (See 6.4)US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER(ARDEC )11784504 - Electronic Control11784505 - Schematic Diagram,11784632 - Panel, ElectronicSPECIAL PACKAGING INSTRUCTIONPs 11784504 - Packaging of(Copies of drawings, publications andrequired by cont
9、ractors in connectionfunctions should be obtained from thedirected by the contracting activity.UnitElectronic Control UnitElectronic Control Unitother Government documentswith specific acquisitioncontracting activity or as)22 Order of precedence. In the event of conflict between thetext of this docu
10、ment and the “references cited herein, the text ofthis document takes precedence. Nothing in this document, however,supersedes applicable laws and regulations unless a specificexemption has been obtained.3. REQUIREMENTS3.1 Fabrication. The electronic control unit shall bemanufactured in accordance w
11、ith drawing 11784504 and drawingspertaining thereto.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-E-70694A (AR)o 3.2 General specifications. Where applicable, the ECU shallmeet the requirements of MIL-F-13926 as follows:a. Dimensions and tolera
12、ncesb. Inorganic protective surface finishingsworkmanship: Part identification and marking3.3 Environmental requirements.3.3.1 Vibration.3.3.1.1 Non-operatinq. The ECU shall meet the requirements of3.5.1.1 through 3.5.2.7 after having been subjected to MIL-STD-81O,;Method 514, Procedure 1-3.3.1 usin
13、g Figure 514.4-1 for one hour ofrandom vibration along the vertical axis.3.3.2 Temperature.3.3.2.1 on-operatinq (storaqe. The ECU shall not sufferpermanent damage when subjected to at least four hours at eachtemperature extreme of -40 deqrees F and +160 degrees F and shallmee”the requirements of 3.5
14、.i.l through 3.5.2.i when returned toand thermally stabilized at ambient temperature (+60 degrees F to+90 degrees F).e3.3.2.2 OPeratinq. The ECU shall resetthe requirements of3.5.1.1 through 3.5.2.7 when thermally stabilized at -25 degreesand 125 degrees F.F3.3.3 Pressure and water tiqht test. The E
15、CU shall not showany signs of bubbles from any surface part when submerged in a tankof water and dry nitrogen pressurized to 1.5 to 2 PSI for 5 minutes.It shall meet the requirements of 3.5.1.1 through 3.5.2.7.3.4 Construction.3.4.1 General description. The Electronic Control Unit (ECU)responds to t
16、arget commands, operating relays that raise or lower anarmored vehicle target and fire the gunfire simulator (GUFS). TheECU is a sealed operating unit containing circuit cards and isoperated through connectors and switches on the front panel.3.4.1.1 Front panel. The front panel contains seven connec
17、torswith robber waterproof covers, two rotary switches, one t0991eswitch and a battery ljght indicator.3.4.1.1.1 Connectors. Four connectors are used to input targethit information from four hit sensors attached to the targets. Theremaining three connectors are used for the visual hit indicatorlamp,
18、 the smoke scorer unit, the gunfire simulator.o3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-E-70694A AR)3.4.1.1.2 Rotary switches. The rotary switch marked “Punction”has seven Dositions with the first Dosition turnina the ECU on and a71positi
19、ons two through seven providi;g selectable mdes varying target raising and lowering functions. The second rotary switchprovides four positions to vary hit sensor sensitivity, depending onammunition type used.3.4.1.1.3 Toqqle switch. The togglecapability of target raising and loweringindicator lamp o
20、perating functions.switch provides a testand the visual hit3.4.1.1.4 Battery lamp indicator. The battery lamp indicatorprovides the battery voltage condition during target raising orlowering operations. r,3.4.1.2 Electronic components. The inner electronics consistsof three printed circuit cards and
21、 six relays.3.4.1.2.1 Circuit cards. The three circuit cards consists of alogic control card, a hit amplification card, and a battery testcard.3.4.1.2.2 Relays. The six relays controls the hydrauliclifting unit, visual hit indicator lamp, smoke scorer, and thegunfire simulator.3.4.2 Construction. Th
22、e ECU shall conform to the requirementsdrawings and notes contained in technical data package 11784504. a713.5 Performance requirements.3.5.1 Test switch.3.5.1.1 Raise tarqet. The test switch is placed in the raiseposition and a signal is generated to raise the target and to turnon the visual hit in
23、dicator lamp. The target will remain in araised position until a lower target signal is received. The visualhit indicator lamp will remain lit for as long as test switch isheld in position. The up-valve relay will disengage 2 1 secondsafter the motor relay disengages.3.5.1.2 Lower tarqet. The test s
24、witch is placed in the lowerposition and a signal is generated to lower the target. The down-valve relay shall disengage 2 1 seconds after motor relaydisengages.3.5.2 Function switches.3.5.2.1 Position zero. Position zero will perform as an offswitch and shall remove all electrical power from the EC
25、U.4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-o00MIL-E-70694A (AR)3.5.2.2 Position one. The target will be raised and lowered byremote signal and hit signals from the hit sensor will have noeffect on the target position. The smoke scorer relay w
26、ill activatefor 2 1 seconds after a hit.3.5.2.3 POSitiOn tWO. The target will be raised and lowered byremote signal and hit signals from the hit sensor will lower thetarget until another signal to raise the target is received. Thesmoke scorer relay will activate for 2 1 seconds after a hit.3.5.2.4 P
27、osition three. The target will be raised and loweredby remote signal and hit signals from the hit sensor shall lower thetarget. The ECU will generate another signal 11 2 seconds afterreceipt of the hit signal to raise the target. The smoke scorerrelay will activate for 2 1 seconds after a hit.3.5.2.
28、5 POSltiOn four. The target will be raised and loweredby remote signal and the visual hit indicator and smoke scorerrelays will operate for 2 1 seconds after a hit. Hit signals fromthe hit sensor will have no effect on target position.3.5.2.6 Position five. The target will be raised and loweredby re
29、mote signal. Hit signals from the hit sensor will operate thevisual hit indicator lamp and smoke scorer relays for 2 1 secondsand lower the target until another signal to raise the target isreceived.3.5.2.7 Position six. The target will be raised and lowered byremote signal. Hit signals from the hit
30、 sensor will operate thevisual hit indicator lamp and smoke scorer relays for 2 1 seconds.The ECU will generate another signal 11 2 seconds after receipt ofa hit signal to raise the target.3.5.3 Liftinq mechanism failure. Failure of the target tocomDlete raisina or lowerinq ooeration will result in
31、the ECUgenerating a sinal to shut-of the lifting mechanism motor 11 2seconds after raisingllowering motion was initiated.3.5.4 Battery check indicator. The voltage indicator light(LED) will indicate sufficient power is available during raising andlowering of the target to operate the lifting mechani
32、sm. The lightwill remain constant when voltage exceeds 10.5 volts and will flashwhen voltage is equal to 10.5 -0.1 volts.3.5.5 Tarqet sensitivity limit switch. The target sensitivitylimit switch will oDerate indeDendentlv of the function switch orsensitivity switch ny assembly,component or test spec
33、imenany f the applicable requirements, the firstarticle sample shall be rejected. The Government reserves the rightto terminate its inspection upon any failure of any assembly,component or test specimen to comply with any of the requirements.4.4 Quality conformance inspection.o 4.4.1 Inspection lot
34、formation. The term inspection lot” isdefined as a homogeneousCO1lection of units of product from which arepresentative sample is drawn or which 1s inspected 100 percent to7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-E-70694A (AR)determine co
35、nformance with applicable requirements. Units ofproduct selected for inspection shall represent only the inspectionlot from which they are drawn and shall not be construed to a71represent any prior or subsequent quantities presented forinspection. Homogeneity shall be considered to exist provided th
36、einspection lot has been produced by one manufacturer, in oneunchanged process, using the same materials and methods, inaccordance with the same drawings, same drawing revisions, samespecifications and same specification revisions. All materialsubmitted for inspection in accordance with this specifi
37、cation shallcomply with the homogeneity criteria specified herein, regardless ofthe type of inspection procedure which is being applied to determineconformance with requirements.4.4.2 Examinations and tests.4.4.2.1 Components, assemblies and subassemblies.The contractors quality program or detailed
38、inspectionplan sha;l provide assurance of compliance of all characteristicswith the applicable drawingsand specifications utilizing as aminimum the conformance criteria specified in this document and theQuality Assurance Provisions (QAP) listed in the Technical DataPackage (TDP). In the absence of Q
39、APtS, the applicable qualityassurance provisions of MIL-F-13926 shall apply.b. Alternative inspection procedures, methods or equipment,such as statistical process control, tool control, other types of a71sampling procedures, etc., may be used by the contractor when theyprovide, as a minimum, the lev
40、el of quality assurance required bythe provisions specified herein. Prior to applying such alternativeprocedures, methods, or equipment, the contractor shall describethem in a written proposal submitted to the procuring contractingofficer for evaluation and approval by the Government. Whenrequired,
41、the contractor shall demonstrate that the effectiveness ofthe proposed alternative(s) is equal to or better than the specifiedquality assurance provisions herein. In cases of dispute as towhether the contractors proposed alternative(s) provide equalassurance, the provisions of this specification sha
42、ll apply. Al1approved alternative inspection provisions shall be specificallyincorporated into the contractors quality program plan or detailedinspection system, as applicable.4.4.2.2 Final acceptance inspection. Subsequent to firstarticle approval, examinations and tests related to Section 3 herein
43、shall be performed on a single defect (individual characteristic)basis in accordance with the sampling plans specified in 4.4.2.3herein. Examination and test for packaging and marking shall be inaccordance with Section s herein. The tabulated classification ofdefects in 4.4.2.3 shall constitute the
44、minimum inspection to beperformed by the contractor after first article approval and priorto Government acceptance or rejection by item or lot. a718Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-.,. MIL-E-70694A (AR)o 4.4.2.3 Functional tests. The t
45、ests in Table I shall beperformed on a 100% basis.TABLE I. Functional tests (100 percent inspection.CHARACTERISTIC REQUIREMENT TEST PROCEDURECritical: None N/AMajor:101. Test switch - raisetarget.102. Test switch - lowertarget103. Function switchposition 1104. Function switchposition 2105. Function
46、switchposition 3106. Function switchposition 4107. Function switchposition 50108. Function switchposition 63.5.1.13.5.1.23.5.2.23.5.2.33.5.2.43.5.2.53.5.2.63.5.2.74.7.4.1.24.7.4.24.7.4.114.7.4.124.7.4.134.7.4.144.7.4.144.7.4.14Minor: Noneo9N/A“l,.Provided by IHSNot for ResaleNo reproduction or netwo
47、rking permitted without license from IHS-,-,-MIL-E-70694A AR)4.5 Special samplinq. One ECU out of the first 50 produced andone out of each 100 produced thereafter shall be selected at random. a71The sample shall have met the requirements and tests of Table II andshall then meet the tests in Table II
48、I. Unless otherwise specifiedin the contract, the items shall be returned to the lot uponsuccessful completion of testing.TABLE II. Control samplinq testCHARACTERISTIC REQUIREMENT TEST PROCEDURESCritical:-:301.302.303.304.305.306.307.308.309.FabricationGeneral specificationsLifting mechanism failure
49、Battery check indicatorRemote control operationBad hit sensors40 ms output pulseBad target sensitivitylimit switchAmplifier sensitivityMinor:TABLE III.CHARACTERISTICCritical:!mit positive rejection when nonconforming. Construction shall besuch as to facilitate routine calibration of test equipment.Contractor inspection equipment designs shall be submitte