ARMY MIL-F-12777 A-1982 FUZE MINE AT PRACTICE M604 LOADING ASSEMBLING AND PACKING《训练用反坦克地引信 M604组装及包装》.pdf

上传人:赵齐羽 文档编号:444565 上传时间:2018-11-15 格式:PDF 页数:16 大小:537.79KB
下载 相关 举报
ARMY MIL-F-12777 A-1982 FUZE MINE AT PRACTICE M604 LOADING ASSEMBLING AND PACKING《训练用反坦克地引信 M604组装及包装》.pdf_第1页
第1页 / 共16页
ARMY MIL-F-12777 A-1982 FUZE MINE AT PRACTICE M604 LOADING ASSEMBLING AND PACKING《训练用反坦克地引信 M604组装及包装》.pdf_第2页
第2页 / 共16页
ARMY MIL-F-12777 A-1982 FUZE MINE AT PRACTICE M604 LOADING ASSEMBLING AND PACKING《训练用反坦克地引信 M604组装及包装》.pdf_第3页
第3页 / 共16页
ARMY MIL-F-12777 A-1982 FUZE MINE AT PRACTICE M604 LOADING ASSEMBLING AND PACKING《训练用反坦克地引信 M604组装及包装》.pdf_第4页
第4页 / 共16页
ARMY MIL-F-12777 A-1982 FUZE MINE AT PRACTICE M604 LOADING ASSEMBLING AND PACKING《训练用反坦克地引信 M604组装及包装》.pdf_第5页
第5页 / 共16页
亲,该文档总共16页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、i MIL-F-12 77 7A (AR) 26 Aprj1 1982 SUPERSEDING .MIL-F-12777 (ORD) 3 June 1953 FUZE, MINE, AT, PRACTICE: M604 LOADING, ASSEMBLING AND PACKING This specification is approved for use by the U.S. Army Armament Research and Development Command, and is available for use by all Departments and Agencies of

2、 the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers quality assurance provisions and preparation for delivery for Fuze, Mine, AT, Practice: M604. (See 6.1,) 2 . APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. Unless otherwise specified (see 6.

3、2), the following specifications and standards of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A- 48 O 78 - Ammun

4、ition, Standard Quality Assurance 9 Provisions, General Specification For. MIL-P- 60 345 - Primer, Stab, M45, Loading, Assembling and Packing. STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MIL-STD-286 - Propellants, Solid: Sampling, Inspection by Attributes. Examination and Tes

5、ting. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be o* use in improvin this document should be addressed to: Commander, US Army Armament fiesearch and Develo ment Command, Attn. DRDAR-QA, Dover, New Jersey 07801 by using tle self-addossed Standardiza

6、tion Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. I , t FSC 1345 THIS DOCUMENT CONTAINS b PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-). . z .- MIL-F-LZ777A 13 797770b 0274943 b MIL-F-127

7、77A (AR) 2.1.2 Other Government documents, drawinqs, and publications. The following other Government documents, drawings, and publications form a part f this specification to the extent specified herein. 1 DRAWINGS (See 6.5) US ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND 7548394 - Container, Amm

8、unition, Metal, For Fuze, 7548395 - Box, Packing, Ammunition, For Fuze, Mine, 934933.5 - Fuze, Mine, AT, Practice, M604 (Loading Mine, AT, Prac, M604. AT, Prac, M604. Assembly) . (Copies of specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with

9、specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer .) 2.2 Other publications. The following document(s) form a part of this specification to the extent specified herein. The issues of the documents which are indicated as DoD adop

10、ted shall be the issue listed in the current DoDISS and the supplement thereto, if applicable . AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) 1 ASTM B 117 - Salt Spray (Fog) Testing (Application for copies of ASTM publications should be addressed to the American Society for Testing and Materials

11、, 1916 Race Street, Philadelphia, Pennsylvania 19103.) 2.3 Order of precededce. the text of this specification and the references cited herein, the text of this specification shall take precedence. In the event of a conflict between 3. REQUIREMENTS 3.1 Materials and parts. Materials and parts shall

12、be in accordance with the applicable drawings, specifications and standards . 3.2 Fuze assemblies. The mine fuze assemblies shall comply with all requirements specified on Drawing (Dwg.) 9349315, all associated drawings, and with all requirements specified in applicable specifications and standards.

13、 3.3 Moisture content of smoke composition. The moisture content of the smoke comxosition at the time and place of loading shall not exceed 0.10 peicent when tested as specified in 4.5.1.- t 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-127

14、77A (AR) 3.4 Functioninq. The fuzes shall function with a characteristic loud report and produce a characteristic smoke volume when a load of three-hundred (300) pounds, maximum, is applied when tested as specified in 4.5.2. 3.5 Waterproofness. The fuzes shall show no evidence of leakage and shall f

15、unction satisfactorily following submersion in . water for not less than twenty-four (24) hours when tested as specified in 4.5.3. 3.6 First article inspection. This specification contains technical provisions for first article inspection. Requirements for the submission of first article samples by

16、the contractor shall be as specified in the contract. 3.7 Workmanship. All parts and assemblies shall be fabricated and assembled in a thorough, workmanlike manner . They shall be free of burrs, chips, sharp edges, chipped edges, gouges, cracks, surface defects, dirt, grease, corrosion products, and

17、 other foreign matter. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agents. All required markings shall be neat and sharply defined. 4 . QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard qualit assurance pro

18、visions. Unless otherwise specified herein o: in the contract, the provisions of MIL-A-48078 shall apply and are hereby _ - - made a part of- this detail specification. 4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: a. First artisle inspect

19、ion (see 4.3). b. Quality conformance inspection (see 4.4) . 4.3 First article inspection. 4.3.1 Submission. The contractor shall submit a first article . sample as designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2. The first article sample shall consist of

20、the following items in sample quantities as indicated below and TABLE 1. -Part Description Drawinqs Fuze, Mine, AT, Practice, M604 (Loading Assembly 9349315 Quantity 50 4.3.2 Inspections to be performed. See MIL-A-48078 and Table I specified herein. 4.3.3 Rejecton. See MIL-A-48078. 3 Provided by IHS

21、Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-. a, FI u .Pl U LI m U u) 8 8a .d 5s alrn YC oa aE LIS ULI O al3 b LILI ao CO Vpi rl Id1 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-al u C 8 8 W C c C c r r r c

22、 r I CI I L . c 9 r c r i;li O Y d Y Y a z O 5 s 4 $! u N 8 rl u a rl ( m I .rl 3 Nm N *rnNN NNNNN N m mmmm mmmmm m . -a. a . 8 5 al rl E al vi vi a: h rl U u al Li u C .rl Y WC urn al -I+ WE m VI n 8 80 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-

23、,-,-c c 2 4 I- I- I- cv rl I i H c r m W c hi 8 hi !i 5 - MIL-F-12777A 13 I 7777906 0274453 5 I L 0 E yti Y U hi hie m mm * dPa In In* o wo o 04 *. U c nm 8 a .FI c m c a E 10 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-u1 c .d al u s E 8 O W c A

24、 U -4 d m I o n 5 al rl m al VI Li al c .d m U E O u d 4 U al c Y * w t u 1 cvcv cvcvcvcv cv fl “.-Y * e* mm mmmm m m mm a, a,* a,a,a,* O000 VI In In* I I wwww u) u) cbb - *a* *. O000 O o Od InIn cvcv 5 al E .rl W al a al z 8 8 al rl O c 5 sial 5-46 o5 11 Provided by IHSNot for ResaleNo reproduction

25、 or networking permitted without license from IHS-,-,-MIL-F-12777A 13 W 7777706 0274453 7 m 4 8 t rl Y I H 0 5 al rl a al m Y 8 rn m c .4 and shall not constitute a basis for rejection against either contractor except where deterioration has occurred as a direct result of carelessness in handling, s

26、torage, etc., permitted while the primer lot was under the jurisdiction of either contractor. 6.5 Drawinqs. Drawings listed is Section 2 of this specification under the heading US Army Armament Research and Development Command (ARRADCOM) may also include drawings prepared by, and identified as, Edge

27、wood Arsenal, Frankford Arsenal, Rock Island Arsenal or Picatinny Arsenal drawings. Technical data originally prepared by these activities are now under the cognizance of ARRADCOM . 6.6 Data cards. (See MIL-A-48078). Distribution of data cards shall include the following: Commander, U. S. Army Armam

28、ent Research and Development Command, ATTN: DRDAR-QAT-M, Dover, New Jersey 07801. (See 6.7) 6.7 Data items. Data required by this specification are cited in the paragraphs listed below. The Form DD 1423 should include distribution of data cards-, as specified in 6.6. Paragraph Data Requirement Appli

29、cable DID 4.4.2.3 Quality Inspection Test Demonstration and Evaluation DI-R-1724 . Report (Tailored) 6.6 Ammunition Data Card DI-L- 1410 6.8 Changes from previous issue. Asterisks are not used in this revision to identify changes with respect to the previous issue, due to the extensiveness of the changes. - Custodian: Army-AR . .P -. Preparing activity: Army-AR (Project 1345-A210) *US. GVERNMENT PRINTING OFFICE: 1982-505-022/2544 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1