1、MIL-H-60332 (3) 66 m 7777706 0342573 5 W =-i?- 2-1 MIL-H-60132 (MU) 28 April 1972 SUPERSEDING AMENDMENT 2 29 November 1968 AMENDMENT 3 . MILITARY SPECIFICATION HEAD ASSEMBLY, TANK PERISCOPE: 10513625 - This amendment forms a part of Military Specification MIL-H-60132(MU), dated 2 November 1964. Para

2、graph 3.4: Delete and substitute: “3.4 Sealing.- The head assembly shall show no evidence of leakage when subjected to an internal air pressure of 5 psig (constant) and while submer- ged, inverted from its normal mode, in 5 k 1 inches of water.“ Add the following new paragraphs: “4.1.2 First Article

3、 (Initial Production) Approval.- The requirement for first article approval and the responsibility (Government or contractor) for first article testing shall be as specified in the contract. The sample for first article approval tests shall consist of three head assemblies plus 3 each of all items c

4、overed by SQAP. The sample shall be manufactured in the same manner, using the same materials, equipment, processes, and procedures as usediin regular production. and packing shall be obtained from the same source of supply as used in re- gular production. All parts and materials, including packagin

5、g 4.1.2.1 Government testing.; When the Government is responsible for con- ducting first article approval tests, the contractor, prior to submitting the sample to the Government, shall inspect the sample to insure that it conforms to all the requirements of the contract and submit a record of this i

6、nspec- tion with the sample, including certificates of conformance for materials. 4.1.2.2 Contractor testing.- When the contractor is responsible for con- ducting first article approval tests, the sample shall be inspected by the contractor for all the requirements of the contract. The sample and a

7、re- cord of this inspection, including certificates of conformance for materials, shall be submitted to the Government for approval. The Government reserves the right to witness the contractors inspection.“ Paragraph 4.2.2, Table 1: Add the following: 11104. Sealing 3.4 4.5.3“ * Paragraph 4.3.2: Del

8、ete “304. Sealing 3.4 4.5.3“ PAGES. , THIS DOCUMENT CONTAINS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-H-60132 (MU) AMENDMENT 3 Paragraph 4.5.3: Delete and substitute: “4.5.3 Sealing.- An adapter that is capable of sealing the lower cavi- t

9、y of the head assembly shall be utilized in this test. be equipped with a valve, or port, that is capable of accepting an air hose for pressurizing the lower cavity of the head assembly. Affix the ad- apter to the head assembly. Pressurize the lower cavity of the head assem- bly with clean dry air t

10、o the value specified in 3.4. ized head assembly (prism down) and immerse it in water to the required depth for a period of 3 minutes f 15 seconds. head assembly shall be observed for evidence of leakage that will be in the form of air bubbles coming from within the assembly. shall conform to the re

11、quirements specified in 3.4. the water for this test shall be between 60 and 90F. this test the head assembly shall be thoroughly dried and cleaned.“ The adapter shall Invert the pressur- During this time period the The head assembly The temperature of Upon completion of Paragraph 6.2: Add: “(e) Req

12、uirement for first article testing“; *“The margin of this specification is marked with an asterisk to indicate where changes (additions, modifications, corrections, deletions) from the previous issue were made. This was done as a convenience only and The Go- vernment assumes no liability whatsoever

13、for any inaccuracies in these no- tations. Bidders and contractors are cautioned to evaluate the require- ments of this document based on the entire content irrespective of the mar- ginal notations and relationship to the last previous issue.“ Custodian: Army - MU Preparing activity: Amy - MU Project No. 6650-AO58 - *U.S. GOVERNMENT PRINTING OFFICE: 1972-714-166/7356 Page 2 of 2 L Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文