ARMY MIL-M-13693 A (1)-1963 MINE APERS NM M14E1 WITH INTEGRAL FUZE LOADING ASSEMBLING AND PACKING《M14E1型杀伤地雷海哩整个导火线的装配 组装及包装》.pdf

上传人:twoload295 文档编号:445686 上传时间:2018-11-16 格式:PDF 页数:3 大小:237.88KB
下载 相关 举报
ARMY MIL-M-13693 A (1)-1963 MINE APERS NM M14E1 WITH INTEGRAL FUZE LOADING ASSEMBLING AND PACKING《M14E1型杀伤地雷海哩整个导火线的装配 组装及包装》.pdf_第1页
第1页 / 共3页
ARMY MIL-M-13693 A (1)-1963 MINE APERS NM M14E1 WITH INTEGRAL FUZE LOADING ASSEMBLING AND PACKING《M14E1型杀伤地雷海哩整个导火线的装配 组装及包装》.pdf_第2页
第2页 / 共3页
ARMY MIL-M-13693 A (1)-1963 MINE APERS NM M14E1 WITH INTEGRAL FUZE LOADING ASSEMBLING AND PACKING《M14E1型杀伤地雷海哩整个导火线的装配 组装及包装》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 inspection of item at overhaul, general maintenance of equipment, construction, survey and when- ever inspection equipment drawings are 43.4.2 Suppt9 and maintenance. Supply and maintenance of the equipment listed on the IEL shall be in accordance with Specifica- tion MIG1-46607. 4.3.43 Goum- we of

2、 tmhwtors inspecw a ORDM-608-12. CDCF - Contractors design responsi- bility on contractor format. OD - Ordnance design. ODMU - Ordnance design, mandatory CE . -Commercial equipment. : SCD. -Specification Control Draw- for use . ing. I Provided by IHSNot for ResaleNo reproduction or networking permit

3、ted without license from IHS-,-,-6.3.3 Ordnance desigw. Ordnance designs ase reieckd on detailed drawings which completely depict ali the information neces- sary for the fabrication of the item of inspec- tion e3pment The contractor need pro- vide no design when an Ordnance design is listed for an i

4、tem of inspection equipment, Ordnance designe fall into two basic classifi- cations; mandatory and nonmandatory. ings. When an inspection equipment list ref- erences mandatory Ordnance designs, the contractor shall comply with, and use these designs accordingly. The contractor may, however, in conne

5、ction with nonmandatory designs and with the approval of the Govern- ment, design alternate inspection equipment or use comparable commercial equipment to facilitate his operations. Such contractor pre- pared designs or commercial equipment selec- tions must be approved by the Government prior to fa

6、brication or procuring of the equip ment. Designs shall be submitted for ap- proval as specified in 6.3.7. 6.3.4 Specificatm control drawings. Spec- ification control rawings depict the mini- mum equipment requirements in outline, de- scriptive, diagrammatic, or pictorial form only and specify the r

7、equired performance or other characteristics. Contractors must pre- pare detailed drawings (see 6.3.6) of their designs in support of specification control drawings. These contractor prepared de- signs must be approved by the Government prior to the fabrication or procuring of the equipment. Commerc

8、ial equipment meeting the requirements of specification control drawings may be approved if described in sufficient detail to permit identification and evaluation by the Government. Designs shall be submitted for approval 88 specified in 6.3.7. 6.3.5 Cornmer& sqt4ipmennt. Commercial equipment is ins

9、pection equipment that has univerd application for a specific function. It is comprised of items commonly used by industry and government. Contractors are not required to furnish drawingB of com- mercial inspection equipment but a list of suchequipment must be approved by the Government. Lists shall

10、 be submitted for approval to the inspection element of the agency administering the contract. 6.3.6 Contractor designs. Contractor de- signs are designs of inspection equipment for which the Government has assigned design responsibility to the contractor. Contractor designs shall be supported by de

11、tailed draw- ings which depict all information necessary to completely fabricate, calibrate and operate an item of inspection equipment. This re- quires that the necessary views, dimensions, materials, finish, notes, operating and cali- bration instructions be properly depicted in accordance with ap

12、proved practices to the ex- tent that further calculation or clarification will not be required. Contractor designs identified 85 CDCF may be developed on the format the contractor normally employs in his equipment design procedure provided such format re ects the detail and informa- identilied as C

13、DOF hll comply with the format and requirements of ORDM 608-12, and, in addition, contain the detail and in- formation specified above. 6.3.1 Submission of contractor designs. Designs shall be submitted for approval to the Commanding Officer, Picatinny Arsenal, ATTN: SMUPA-ND. Design review will nor

14、mally be accomplished within one month after receipt by Picatinny Arsenal. Partial submission of inspection equipment designs is permissible and encouraged. However, the Arsenal completion date for design re- view will be based on the date of the final submission of designs.“ tion specified 4 above. Contractor designs heparing activity: hY-MU Project No. 134SA117 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1