ARMY MIL-M-52182 E (1)-1988 MELTER ASPHALT《沥青熔化器(炉)》.pdf

上传人:wealthynice100 文档编号:445851 上传时间:2018-11-16 格式:PDF 页数:8 大小:364.42KB
下载 相关 举报
ARMY MIL-M-52182 E (1)-1988 MELTER ASPHALT《沥青熔化器(炉)》.pdf_第1页
第1页 / 共8页
ARMY MIL-M-52182 E (1)-1988 MELTER ASPHALT《沥青熔化器(炉)》.pdf_第2页
第2页 / 共8页
ARMY MIL-M-52182 E (1)-1988 MELTER ASPHALT《沥青熔化器(炉)》.pdf_第3页
第3页 / 共8页
ARMY MIL-M-52182 E (1)-1988 MELTER ASPHALT《沥青熔化器(炉)》.pdf_第4页
第4页 / 共8页
ARMY MIL-M-52182 E (1)-1988 MELTER ASPHALT《沥青熔化器(炉)》.pdf_第5页
第5页 / 共8页
亲,该文档总共8页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-M-52182E (I) 38 7777906 02118502 I c -38.8 A MJXrM-52182E -1 6 Jly 1988 “MIPR-196 mLzic-46168 - Coating, Aliphatic Polyurethare, Chemical Agent Resistant.“ Under SWWQX, MILZINtY, delete gWILrS“W11881a in its entirety and add: 1WMIGs11)-1791 - Repair partc, Accessories and Kits, Mecham cal, Packa

2、ging of. I - Design for Internal Aerial Delivery in Fixed Wiring Aircraft. If PAGE 3 2.2, urder AMEEUCAN SCIETY FioR TESTR?G AND MATERIALS (ASIM), add: “D 3951 - standard practice for Cmmezcial packaging.“ AIGC N/A FL;C 3895 DISITUEwmoN “C A. Approved for public release, distribution is unlimited. 1

3、 of 8 : Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIGM-52182E -1 PAGE 5 3.4.11, line 4, delete IIANSI B31.1“ and substitute W3ME B31.1Il. PAGES 7 and 8 “3.13 Trancpo rtability. The acphalt miter shall be capable of being ?he asphalt melter shal

4、l be equipped with tiedawn and transported by military or commercial trailers, trains, vessels, aircrafts and can withstand the impact fores em=ountered in shiprrent without damage or permanent deformation. slinging pmisions. 209, for type II equipmt, class 2 or 3 pmisions and h MIGSTD-1791, for equ

5、ipment restraint criteria. amplete the piil testing as specified without weld failure, permanent deformation, conmcting structural camponents. STD-209, class 1 or 3, type II. The provisions shall enable the camplete asphalt to be lifted and placed in mting and storage tank. The provisions shall be l

6、ocated so that not less than one inch clearance is maintained between slings and all exterior parte and shall be fastend to memberc which will withstand stresses in the amaunt and direction of pul specified for the provisions without weid failure, pemianent deformation, cracking, looCening, or break

7、ing of the provision or its connecting sbcturai. camponents. siinging provisions may also be uced as tiedm provisions when such provisions meet the requirements specified in 3.13.1. Um -11, as appropriate, in i-inch high letters. in C-130, C-141, and C-5A aircraft in accordance with MLrsTD-1791. to

8、achieve air trancportable configuration shall be accomplished in not more than 2 hours, arid reassembly shall be accomplished in not more than 2 hours, using only 2 people and cx3mmon tools, and lifting devices available in the mil- unit. 113.13.1 Tiedm ?mwisions. ?he tiedawn provisions shall confor

9、m to MIZ-STD- The tiedawn pravisions shall satisfactorily v13.13.2 Slh-dm D ravisions. The slinging provisions shall confonnto NEG melter to be lifted in the nonnal operathg pition, and the dedrumming tunnel . All clinghg/tieduwn provisions shall be labeled %LFCtf, tY13BDWNtt or “3.13.3 Air lxansm r

10、tability. The asphalt mlter shall be air transportable Disaccembly “3.13.4 Rail lxansm rtabilitv. The acphalt melter shall be rail transportable The asphalt melter, shall have in OONUS an a dimencional profile within the Gabarit InteSnational de Chargement (GIC) outline diagram (seefigure 2) when lo

11、aded on a SO-hch high rail car. asphalt melter shall be capable of withstanding chock loads resuiting from rail bpct testing in accordance with 4.5.2.8 without failure, damage, or pemianent de ormation. countriec withcut mstrictions. The 2 Provided by IHSNot for ResaleNo reproduction or networking p

12、ermitted without license from IHS-,-,-MIL-M-52L82E (1) 38 7777706 023850V 5 W MIM-52182E -1 “3.13.5 Hicrhwav transPo rtability. The asphalt melter, when loaded on a dtrailer tractor, shall be within the highway permit limits of dl states. PAGE 9 3.19, delete in its entirety and substitute: 3.19 Trea

13、tment and paintinq. The portions of the asphalt melter normally painted, internally and extemal, shall be cleaned, treated, and painted in accordam=e with MIId-704, type F or G, as applicable. specified (see 6.2), lq? coat color shall becamouflage green 383 confo to When specified (see 6.2) , the as

14、phalt melter shall be ovenoated in accOraam=e with the Gavenrment furnished axnouflage patterm with MIM-46168 top coat of the colors cpecified in the camouflage pattemc except the first article may be camxlflage green 383. o shall be uced on parts of the asphalt melter subjected to a temperature of

15、400 F or higher. lusterless dark green ncmiber 34079 unless othmise specified. practicable after cleaning and before any corrosion p-ct or other contamination can result, the surfaces shall be ppared or treated with one coat of primer and one finish coat. surface as coon as practicable after cleanin

16、g an treating. with manufacturerls current rraterials according to manufacturerts current procesces and the total dry film thiclaiecc shall be not less than 2.5 mils over the ent* surface. other defects. II Unless othmise . MILrc-46168. Heat resistant paint conforming to MIGF.14105 Color per MIGP-14

17、105 shall be in accordance with F“EPSIll-595, As coon as Ihe primer shall be applied to a clean, dry Painting shall be The paint shall be free frcnn runs, sags, orange peel, or i 3.19.1 Camouflase pattern data. When specified (see 6.2), the contractor shall provide camouflage pattern data. When spec

18、ified (see 6.2), the follming propertY in the quantity indicated will be furnished by the Governmat (see 6.7). 3.19.2 Gavernt fumishd property . Item .NO. Wipt ion Quantity 1 4.5.1, 117. 117a. 11%. 117c. 117d. Il23a. l23b. Camouflage paint pattern As requindl c PAGE 11 item 117, delete in its entire

19、ty and SubstitUte: After item 123, add: Tiedam provisions not as specified. Slinging provisions not as specified. Air trancportability requirements not met. mil transportabilis requirements not met. Nighway transportability requirements not met. Color not as specified (see 3.19). camauflage pattern

20、data not provided when specified (see 3.19.1) .II 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-52382E (3) 38 7777706 0238505 7 . MIH-52182E -1 PAGE 12 4.5.2.3, lines 17 thru 21, delete Yihe conthucw thne period shall. the recorded continuc

21、m time period (1 and substitute Yhe continuous time period shall begin at the start of the cecond dzarge.Il 4.5.2.6 thru 4.5.2.7.2, delete in their entirety and substitue: “4.5.2.6 Tiedawn mwvisions. The tied- pmisions shall be tested in accordance with MiJiSiTl-209 to pme conformnce to 3.13.1. the

22、requirementc of 3.13.1 shall constitute failure of this test. accoKa.nce with MnisI9)-209 to prove conformance to 3.13.2. the mmments of 3.13.2 shall constitute failure of this *t. Inability to meet “4.5.2.7 Slhh muvisions. Ihe slinging pravisions shall be tested in Inability to meet lv4.5.2,8 Rail

23、bet test, The fht article asphalt melter shall be tested in accordame with the foilawing rail inpact test procedure: Ihe following conditions shall be satisfied: step 1, Fnxn one to five railcars shall be positioned on a level any mement greater than 5 centimeters (1.97 inches) shall be justificatio

24、n for retest. The end of the buffer car to be struck rnust have a standard draft gear. e. stex 2. Mount the test item on the test car. The test car shall be equipped with ctandard draft gears and conventional under Eramec. Mounting of the test item shall incorpOrate the ctandard loading and bracing

25、method as shm h any nonstandard loading and bracG must be appruved by the Military Traffic Managemnt camnard Transportation Engineering Agemy (KIMCTEA). A“: BWC-TR, P.O. Box 6276, Newport News, VA 23606-0276 prior to testing. to be tested shall be identical to that proposed and approved by l4IMXEA (

26、if The arrangement of the test item and its blccking and tiedown nons-). Stex, 3. Situate the test car between the buffer cars and the locanotive, and pull the test car at least 65 meters (200 feet) from the buffer car(s) along a level section of track (a minimum distance tu achieve the required loc

27、anotive speeac) 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-M-52182E (1) 38 9999706 0218506 9 U MIL-M-52182E AMENCMEIR:l I Step 4. SteX, 5. pocition the knuckles of the buffer and test cars for coupling. Install a timing device to measure

28、the test car speed (k.1 km/hr) just prior to impact with the buffer car(s) . elcxkronic timing (microswitrhec) and radar. stopwatch is permissible but not recommend because of the inaccuracies involved. loaoanotives speedameter or other means, release the test car when the desired test speed is reac

29、hed, thus allowing the test car to freely impcanponentC that do not fit in the accessory box, technical substitute: publications, repair parts, and maintenance tools shall be consolidated together in a close fitting box conformirg to PPP-l3-601, averseas type, style optional.v1 5.1.2, delete in its

30、entirety and substitute: 5.1.2 mel C. Each complete asphalt melter and all items issued with the asphalt melter shall be preservd in accordam=e with IClI&-116, method III.It 5.2, delete %amercia181 and substitute IrP. 5.2.2, delete in its entirety and substitute: ( “5.2.2 mel C. Fach complete asphal

31、t melter, preserved as specified in 5.1, shall be packed for mobile shipment. shall be packed so as to pmtect against ghysical and enviromtal damage during shipent, handling and storage. DicasCernbled CarrrpOnentc and acceccories I 5.3 thru 5.3.2, delete in their entirety and substitute: “5.3 Markin

32、q. Markhg shall be in accordance with MIGSTD-129.t1 s PAGE 17 6.2, item glltt, delete in its entirety and substitute: tgl. Level of preservation and packing (see 5.1 and 5.2). %I. When camauflage data will be provided (see 3.19.1) .I9 After 6.2, add: 6 Provided by IHSNot for ResaleNo reproduction or

33、 networking permitted without license from IHS-,-,-MIMI-52 182E AME“T1 ts. i “6.2.1 Data recluiremen when this specification is used for an acquisition wfiich brporates a DD Form 1423, Contract Data data recphmmts identified below shall be developed as specified by an appmed Data Item Description (D

34、D Form 1664) and delivered in accordance with the appraved Supplement, Part 27, sub-part 27.410-6 are invoked and the W Form 1423 is not used, the ata cpecified below shall be delivered by the contractor in accordance with the antract or purchace order reqhments. this specification is cited in the f

35、ollowing paragraphe. paragraph No. Data requirements Applicable DID No. ts List (CE&), the incorporated into the contract. When the pravisions of DOD FAR Deliverable data required by a. 3.19.1 Color photograph DI-MISC-80192 b. 3.19.1 camouflage line art DI-MISC-8 017 6“ prints data (Data item descri

36、ptions related to this specification, and identified in section 6 will be approved and listed as such in DOD 5000.19L, Vol. II, mDL. data item descriptions required by the contractom in connection with specific a&sition functions shdd be obtained from the Naval Publications and Fonns center or as di

37、rected by the contracting officer.) Copies of After 6.6, add: “6.7 Gavenmient-furniched P- . nie contracting officer should arrange to i furnish the property listed in 3.19.2.l Add new figure 2 after page 18. UIctodianc: -ME Navy - YD User activity: Army-m 7 preparing activity: Project 3895-0292 . .

38、- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1 - MIL-M-52182E (I) 38 777770b 0238509 4 m f4ILd4-52 182E z!Emrn 1 -i- f / 124.00 _-_-. - i- (3149.6) I n MGTE: DIMENSIONS SHOWN INCHES (MILL-IMETERS) 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1