ARMY MIL-M-63330-1979 MOUNT TELESCOPE M149E1《M149E1型望远镜装配》.pdf

上传人:diecharacter305 文档编号:445913 上传时间:2018-11-16 格式:PDF 页数:23 大小:1.02MB
下载 相关 举报
ARMY MIL-M-63330-1979 MOUNT TELESCOPE M149E1《M149E1型望远镜装配》.pdf_第1页
第1页 / 共23页
ARMY MIL-M-63330-1979 MOUNT TELESCOPE M149E1《M149E1型望远镜装配》.pdf_第2页
第2页 / 共23页
ARMY MIL-M-63330-1979 MOUNT TELESCOPE M149E1《M149E1型望远镜装配》.pdf_第3页
第3页 / 共23页
ARMY MIL-M-63330-1979 MOUNT TELESCOPE M149E1《M149E1型望远镜装配》.pdf_第4页
第4页 / 共23页
ARMY MIL-M-63330-1979 MOUNT TELESCOPE M149E1《M149E1型望远镜装配》.pdf_第5页
第5页 / 共23页
亲,该文档总共23页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-il-63330 12 7979706 0348377 4 MIL-M-63330 (AR) 17 April 1979 MILITARY SPECIFICATION MOUNT, TELESCOPE: M149E1 This specification is approved for use by the U.S. Army Armament Research and Development Command and is available for use by all Departments and Agencies of the Department of Defense. 1.

2、 SCOPE 1.1 This specification covers one type of telescope mount which supports Telescopes M119 and M127 (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 The following documents, of the issue in effect on date of invitation for bids or request for proposals, form a part of this specification to the extent spe

3、cified herein. SPECIFICATIONS Mi 1 i t ary MIL-0-13830 Optical Components for Fire Control Instruments; General Spec if i cat i on Governing the Manufacture, Assembly and Inspection of MIL-F-13926 Fire Control Materiel; General Specification Governing the Manufacture and Inspecti on of MIL-P-14232 P

4、arts, Equipment and Tools for Army Materiel , Packaging and Packing of MIL- 1-45607 Inspection Equipment, Supply and Maintenance of STANDARDS Mi 1 i tary MI L-STD- IO5 Sampling Procedures and Tables for Inspection by Attributes FSC 1240 Beneficial commenta (recommendations, additions, deletions) and

5、 any pertinent data which may be of um in improving thia document should be addressed to: Commander, US Army Armament Research and Development Command, Attn. DRDAR-QA, Dover, New Jersey 07801 by using the self-addressed Standardization Document Improvement h.OPosal (DD Form 1426) appearing at the en

6、d of thia document or by letter. 1 I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-63330 (AR) STANDARDS (Cont d) Mi 1 i tary MIL-STD- 109 M IL- STD- 202 MIL-STD-810 Envi ronmental Test Methods Qual i ty Assurance Terms and Definitions Test Me

7、thods for Electronic and Electrical Component Parts DRAWINGS (See 6.4) U. S. Army Armament Research and Development Command (ARRADCOM) F8565556 F 11 8348 19 Mount , Telescope: M149E1 F10541523 Gage, Functional, Maximum F10541525 Gage, Functional , Maximum F 11 72 8050 Pressure Tester - Two Station T

8、est Set, Radiometer PACKAGING DATA SHEET 11 8348 19 Packaging of Mount, Telescope: M149E1 (Copies of specifications, standards, drawings, and packaging data sheets required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by

9、 the contracting officer.) 3. REQUIREMENTS with Drawing F11834819 and drawings pertaining thereto. 3.1 Fabrication. The mount shall be manufactured in accordance 3.2 General specification. The contractor chal 1 be responsible for adherence to, and compliance with, the following requirements of MIL-F

10、-13926. MIL-F-13926. (a) Order of precedence (b) Dimensions and tolerances (c) Inorganic protective surface finishes (d) Part ident if i cati on and marking (e) Wor km ans h i p (f ) Sol der i ng electrical connect ions 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without l

11、icense from IHS-,-,-MIL-M-63330 12 977370b 0348401 7 - MIL-M-63330 (AR) 3.3 Envi ronmental servi ce conditions. 3.3.1 Storage temperatures. The mount shall show no evidence of physical failure, such as cement separation, glass breakage, or casting failure after having been exposed and thermally stab

12、ilized at temperatures of -800 and +1600 Fahrenheit (F), 3.3.2 Extreme operating temperatures. The mount shall be operable (3.19 and 3.19.1) at temperatures of -650 to +150OF. 3.3.3 Standard ambient temperatures. Unless otherwise specified, the mount shall meet the requirements of 3.4 through 3.21,

13、at standard ambient temperatures between 600 and 900F. 3.4 Vibration, The mount shail show no evidence of physical failure due to being vibrated successively along three (3) mutually perpendicular axes. Vibration shall be a simple harmonic motion, the frequency varying either lineraly or logarithmic

14、ally from 5 to 55 to 5 CPS in five minute cycles for a total of 15 minutes along each of the axes, The amplitude of vibration shall be maintained constant at 1/64 inch (U32 inch total excursion). Following the vibration test the mount shall meet all subsequent requirements. 3.5 C1 eanl i ness, 3.5.1

15、 Dirt. Inspection for dirt and foreign particles (classed as dirt) shrbe made with the unaided eye from both ends of the mount by transmitted and reflected light. The maximum size of any visible particle on the glass surfaces shall be 1/8 inch. The total number of particles shail not exceed five (5)

16、, The total number of particles on any one (i) glass component shall not exceed two (2). Dirt particles smaller than 1/32 inch shall be ignored regardless of di str i but i on. 3.5.2 Other defects. There shall be no evidence of moisture, grease, fingerprints or fractures when viewing hrough either e

17、nd of the mount by transmitted and reflected light. 3.6 Sealin . The mount shall show no evidence of leakage in - excess of + O. pound per square inch gage when subjected to an internal pressure of 5 + 0.10 pound per square fnch (psig) for a minimum of 2 hours. 3.7 TelesCoDe and tracker mountinq fea

18、tures. 3.7.1 Orientation. The mount shall be positioned with the telescope mounting surface of the mount in a vertical plane and the locating keyway for the telescope at the six oclock position. ! 3 . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-M

19、IL-M-63330 22 M 7779706 0348Li02 O i MIL-M-63330 (AR) 3.7.2 Insertion and removal. The mount shall permit insertion and removal of the type telescope and tracker which the mount is intended to support. tracker inserted and removed while the telescope is positioned in the mount and with the telescope

20、 inserted and removed while the tracker is positioned and bolted securely in the mount. The mount shall meet this requirement with the 3.7.3 Ridgidity. The locking mechanism shall securely lock the type telescope which the mount is intended to support. 3.8 Collimation. 3.8.1 Telescope-to-tracker. Wi

21、th the incident line of sight perpendicular to the telescope mounting surfaces and entering the entrance window, the two emerging lines of sight shall remain perpendicular to this same mounting surface within 2 mils and parallel to each other within 2 mils. . 3.8.2 Checksight-to-tracker. With the AL

22、IEN lever in clockwise position (error wedge removed from line of sight counterclock-wise) the image of the illuminated checksight emerging from the beam-spl i tter pl ate shall be centered on tracker cavity axis within 0.25 mil. the full b earn the 3.9 Resolution. The resolution on the telescope ca

23、viby axis shall be 6.0 seconds of arc or less when using a telescope with a two inch entrance pupil at one established focus setting. 3.10 Light transmission. White light transmission to the telescope cavity axis shall be at least 75 percent. 3.11 Spherical power. The spherical power shall not excee

24、d 5-0 millidiopters using a telescope of two inch entrance pupil on the tel escope axi s. 3.12 Astigmatism. Astigmatism shall not exceed 3.0 millidiopters using a telescope of two inch entrance pupil on the telescope axis. 3.13 Wedge deviation. From the position established in 3.8.2 the conditions o

25、f 3.13.1 and 3.13.2 shall be met. P 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-63330 12 W 7777706 0348403 2 =I MIL-M-63330 (AR) 3.13.1 Line of sight deviation. The line of sight of the checksight beam shall deviate by 0.39 + 0.03 mil in

26、azimuth and 0.39 + 0.03 mil in elevation and shall be i? the upper right quadrant Tabove the horizontal centerline and to the right of the vertical centerline) when viewed along the tracker axis, and the ERROR lever is in the full clockwise position. 3.13.2 Repeatability. At no time during repeated

27、operation of the ERROR lever shall the line of sight deviate less than 0.36 mil or more than 0.42 mil when the ERROR lever is in the full clockwise posi ti on. 3.14 Signal frequency. Signal frequency derived from light pulsations of 2400 + 24 pulses per second shall be indicated on the tracker axis

28、(see 3T8.2) through the beam-splitter with the f o 1 1 owi ng p re val ent condi ti on s : (a) of 400 + 0.4 cps. Tb) (c) Chopper motor energized with 115 - + 6 vac at a frequency ALIGN lever in maximum clockwise position. ERROR lever in maximum countercFockwise position. 3.15 Diaphragm adjustment. F

29、rom the position established in 3.8.2 th AZ and EL boresight knob shall meet the rotation conditions of 3.15.1 and 3.15.2. 3.15.1 Elevation. The checksight beam shall be adjustable over a range of 3.75 + 0.25 mils irr elevation and 3.75 + 0.25 mils in depression in a vertical plane by rotation of th

30、e elevation boresi ght knob. 3,15.2 Azimuth. The checksight beam shall be adjustable over a range of 3.75 + 0.25 mils to the left and 3.75 + 0.25 mils to the right in a horTzonta1 plane by rotation of the azimuth boresight knob. 3.16 Checksight lens. The checksigh lens shall be adjusted such that th

31、e image of the diaphragm circle of the checksight, wheti viewed at the tracker aperture opening shall appear to be at a range of 2000 meters - + 100 meters. 3,17 Irradiant intensity (infrared power). From the position established in 3.8.2, the effective power of the checksight beam at the fundamenta

32、l frequency of 3.14, output shall be 6.0 x 10-9 watts minimum. 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-b3330 12 9799906 0348404 4 W MIL-M-63330 (AR) 3.18 Projected checksight image beam. From the position established in 3.8.2 the imag

33、e of the checksight beam, when viewed along the tracker axis shall be circular and shall have a diameter of angular subtense of 1.0 + .O0 minus (-) .O5 mil. 3.19 Operability. The telescope locking lever, the checksight levers (ERROR AND ALIGN), and the diaphragm adjusting screws, AZ and EL, shall be

34、 mechanically operable over their full excursion of travel. clockwise position) shall be 11 - + 3 inch pounds. The torque required to latch the ALIGN lever (full 3.19.1 Porro prism. When the ALIGN lever is in the maximum clockwise position, the porro prism shall be in th optical path of tracker and

35、the pilot light shall be illuminated. lever is moved to the maximum counter-clockwise position, the porro prism shall be completely removed from the optical path and the pilot light shall be extinguished. When the ALIGN 3.20 Electrical. 3.20.1 Checksight illumination. With the checksight lamp energi

36、zed, the diaphragm shall appear clearly defined when viewed through the exit windows of the mount. shall 0.080 - + 0.002 amperes. The current draw of the lamp 3.20.2 Circuitry. The circuitry of the mount shall be in accordance with the electrical schematic drawings. 3.20.3 Dielectric strength. There

37、 shall be no puncture of insulation, no sparkover, no decrease in dielectric strength when the insulated areas of the circuitry are subjected to an alternating current (ac) root mean square (rms) potential of 500 volts plus twice the rated voltage at a frequency of 60 cps for a period of 15 seconds

38、- + 5 seconds, applicable drawings, all insulation between ungrounded circuits and ground, and between isolated circuits, shall have a minimum resistance of 100 megohms with 500V dc applied. 3.20.4 Insulation resistance. Unless otherwise specified on 3.21 Interior atmosphere. The interior atmosphere

39、 of the optical section of the mount shall contain nitroqen havinq a dew point at leastas low as -25OF and the internal pressure f the mount shall be 3 psi - + 0.5 psi. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-63330 12 7999906 03L18110

40、5 6 MIL-M-63330 (AR) 3.22 Workmanship. The workmanship requirements of MIL-F-13926 shall be adhered to. Exterior protective surface finishes shall be free of voids which may effect the protective qualities of the finish or appearance. Optical surfaces shall be free of scratches and blemishes which m

41、ay affect their optical qualities or appearance. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requiremens as specified herein. Except as otherwise spe

42、cified in the contract or order, the supplier may utilize his own facilities or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. reserves the right to perform any of the inspections set forth in the specification

43、 where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. In addition, the Government 4.1,l General provisions. The component and subassembly inspection requirements of MIL-F-13926 form a part of the quality assurance provisions of this specific

44、ation. inspection terms shall be as listed in MIL-STD-109. Definitions of 4.2 First article (initial production) approval. The requirement for first article arJDrova1 and the responsibilitv (Government or contractor) for first article testing shall b; as specified in the contract. The sample for fir

45、st article approval tests shall consist of 3 mounts plus 3 each of all items covered by SQAP. The sample shall be manufactured in the same manner, using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, including packaging and packing, s

46、hall be obtained from the same source of supply as used in regular production. 4.3 Inspection provisions. 4.3.1 Submission of product. Unless otherwise specified by the contracting officer, inspection lot size, lot formation and presentation of lots shail be accordance-with “Submission of Product“ p

47、rovisions of MIL-STD-105. 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-fl-b3330 12 U 9999906 0348406 = MIL-M-63330 (AR) 4.3.2 Examination and tests. 4.3.2.1 Components and subassemblies, All components and subassemblies shall be inspected in

48、 accordance with the inspection provi si ons contained in Suppiementary Qual i ty Assurance Provi si ons (SQAP) listed in the technical data package (TDP). In the absence of SQAPs, the applicable Quality Assurance Provisions of MIL-F-13926 shall apply. Examination, and tests related to Section 3 her

49、ein shall be performed on a single defect (individual characteristic) basis in accordance with MIL-STD-105 and the sampling plans specified in Tables I, II and III herein. Examination and tests for packaging, packing, and marking shall be in accordance with MIL-P-14232 and Section 5 herein, The tabulated classification of defects in Tables I, II and III shall constitute the mnimum inspection to be performed by the supplier

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1