ARMY MIL-M-63333-1980 MOUNT PERISCOPE ASSEMBLY 11834833《潜望镜装配 11834833》.pdf

上传人:ownview251 文档编号:445917 上传时间:2018-11-16 格式:PDF 页数:15 大小:136.18KB
下载 相关 举报
ARMY MIL-M-63333-1980 MOUNT PERISCOPE ASSEMBLY 11834833《潜望镜装配 11834833》.pdf_第1页
第1页 / 共15页
ARMY MIL-M-63333-1980 MOUNT PERISCOPE ASSEMBLY 11834833《潜望镜装配 11834833》.pdf_第2页
第2页 / 共15页
ARMY MIL-M-63333-1980 MOUNT PERISCOPE ASSEMBLY 11834833《潜望镜装配 11834833》.pdf_第3页
第3页 / 共15页
ARMY MIL-M-63333-1980 MOUNT PERISCOPE ASSEMBLY 11834833《潜望镜装配 11834833》.pdf_第4页
第4页 / 共15页
ARMY MIL-M-63333-1980 MOUNT PERISCOPE ASSEMBLY 11834833《潜望镜装配 11834833》.pdf_第5页
第5页 / 共15页
亲,该文档总共15页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-M-63333(AR)15 February 1980MILITARY SPECIFICATIONMOUNT PERISCOPE ASSEMBLY: 11834833This specification is approved for use by the U.S. Army Armament Researchand Development Command and is available for use by all Departments andAgencies of the Department of Defense.1. S COPE1.1 This specification

2、 covers a periscope mount which is used withperiscopes: XM44E1 and XM44E2 (See 6.1).2. APPLICABLE DOCUMENTS2.1 The following documents, of the issue in effect on date of invitationfor bids or request for proposal, form a part of this specification to theextent specified herein.SPECIFICATIONSMilitary

3、MIL-F-13926MIL-P-14232MIL-I-45607STANDARDSMilitaryMIL-STD-105MIL-STD-109MIL-STD-810Fire Control Materiel; General SpecificationGoverning the Manufacture and Inspection of “Parts, Equipment and Tools for Army Materiel;Packaging and Packing ofInspection Equipment, Acquisition, Disposi-tion and Mainten

4、ance ofSampling Procedure and Tables for Inspectionby AttributesQuality Assurance Terms and DefinitionsEnvironmental Test MethodsBeneficial comments (recommendations, additions, deletions) and any pertinent datawhich may be of use in improving this document should be addressed to: Commander,US Army

5、Armament Research and Development Command, Attn. DRDAR-QA, Dover,New Jersey 07801 by using the self-addressed Standardization Document ImprovementProposal (DD Form 1426) appearing at the end of this document or by letter.FSC 1240Provided by IHSNot for ResaleNo reproduction or networking permitted wi

6、thout license from IHS-,-,-MIL-M-63333(AR)DRAWINGSU.S. Army Armament Research and Development Command (ARRADCOM)F8565556F11834833F11834841F105422O4F105582O3FI1738174FI1738175FI1738176F11738177F11738180F11738181F11738182F11738183Pressure Tester - Two StationMount, Periscope Assy: 11834833Body Assembl

7、y, Tank Periscope: 11834841Head Assembly, Tank Periscope: 10542204Head Assembly, Tank Periscope: 10558203Gage - Interchangeability - Body MaximumGage - Interchangeability - Body MinimumGage - Interchangeability - Head MinimumGage - Interchangeability - Head MaximumFixture - Pressure Testing - Head M

8、aximumFixture - Pressure Testing - Head MinimumFixture - Pressure Testing - Body MaximumFixture - Pressure Testing - Body MinimumPACKAGING DATA SHEETPS11834833 Packaging of Mount, Periscope: 11834833(Copies of specifications, standards, drawings and packaging data sheetsrequired by suppliers in conn

9、ection with specific procurement functions shouldbe obtained from the procuring activity or as directed by the contractingofficer.)3. REQUIREMENTS3.1 Fabrication. The periscope mount, hereinafter referred to as “mount”shall be manufactured in accordance with Drawing F11834833 and drawingspertaining

10、thereto.3.2 General specification. The contractor shall be responsible foradherence to, and compliance with, the requirements of MIL-F-13926 specifiedbelow:a. Order of precedenceb. Dimensions and tolerancesc. Inorganic protective surface finishesd. Part identification and markinge. Workmanshipf, Sol

11、dering electrical connections3.3 Environmental.2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-63333(AR)3. 3.1 Storage temperatures. The mount shall show no evidence of physicalfailure such as casting failure, adhesive failure, or deterioratio

12、n of Gasket10513302 due to storage at temperatures ranging from -80 to +160Fahrenheit (F). Subsequent to meeting this requirement, the mount shall becapable of meeting the requirements of 3.8.1.3.3.2 Extreme operating temperatures. The mount shall meet theapplicable requirements of 3.8.1 while expos

13、ed to and thermally stabilized attemperatures of -650 and +150F.3.3.3 Standard temperature. unless otherwise specified herein, the mountshall meet the following requirements while exposed to a temperature between+60 and +90F.3.4 Orientation. The requirements of 3.6, 3.7 and 3.8 shall be met withDatu

14、m Plane “A” in a horizontal plane within 2.0 degrees of arc and the shieldassembly and Mount Assembly 11834835 positioned as shown on DrawingF11834833. Unless otherwise specified, the shield shall be in the raisedposition.3.5 Vibration. The mount shall show no evidence of physical failure dueto bein

15、g vibrated successively along 3 mutually perpendicular axes. Vibrationshall be a simple harmonic motion, the frequency varying either linearly orlogarithmically from 5 to 55 to 5 cycles per second in 5 minute cycles for atotal of 15 minutes along each of the axes. The amplitude of vibration shallbe

16、maintained constant at 1/64 inch (1/32 inch total excursion). Followingthe vibration test, the mount shall meet the requirements of 3.7.3, and shallthen meet all of the following requirements.3.6 Sealing. The mount shall be capable of meeting this requirementwhile exposed to prolonged rainfall with

17、the shield in the raised position.Gasket 10513302 shall be capable of preventing water penetration below thecontact surfaces when the periscope head assembly is positioned in the mount.3.7 Periscope holding features.3.7.1 Insertion and removal. The mount shall permit insertion andremoval of the head

18、 assembly and body assembly of the periscope withoutrestriction.3.7.2 Periscope mounting repeatability. An original line of sight,through the periscope body assembly, shall not deviate more than 0.10 mil dueto repeated mounting of the body assembly to the mount.3.7.3 Rigidity (line of sight retentio

19、n). The mount shall be capable ofmaintaining a previously established line of sight, through the periscope bodyassembly, within 0.10 mil subsequent to vibration (see 3.5).3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-63333(AR)3.8 Operability

20、. The requirements of 3.8.1 shall be met at thetemperatures specified in 3.3.2 and 3.3.3.3.8.1 Controls.3.8.1.1 Periscope locking lever. Lever Assembly 8589900, shown onDrawing F11834835, shall be manually operable through the range required tosecure and permit removal of the periscope body assembly

21、.3.8.1.2 Shield actuating handle. Handle 10542148 shall be manuallyoperable through the range required to raise and liner the shield to the fullyopen to the fully closed position.3.8.1.3 Handle locking latch. When Latch 10542138 is released while theshield is being raised, the handle shall lock the

22、shield in the fully openposition. When the latch is released while the shield is being lowered, thehandle shall lock the shield in the fully closed position.3.9 Circuitry. The circuitry of the mount shall have electricalcontinuity between its respective terminations and show no continuity betweenter

23、minations and mount.3.10 interchangeability.3.10.1 Interchangeability - mechanical. The mount shall be capable ofaccepting Head Assemblies 10542204 and 10558203 and Body Assemblies 11834841-2and 11834841-1.3.10.2 Interchangeability - pressure retention. With the head and bodyassemblies mated to the

24、mount, the mount shall withstand an internal pressureof 5 + 0.10 pounds per square inch gage (psig) for a minimum of 2 hourswithout loss of pressure in excess of 0.2 pounds (psig).4. QUALITY ASSURANCE PROVISIONS4.1 Responsibility for inspection. Unless otherwise specified in thecontract or purchase

25、order, the supplier is responsible for the performance ofall inspection requirements as specified herein. Except as otherwisespecified, the supplier may utilize his own facilities or any other facilitiessuitable for the performance of the inspection requirements specified herein,unless disapproved b

26、y the Government. The Government reserves the right toperform any of the inspections set forth in the specification where suchinspections are deemed necessary to assure supplies and services conform toprescribed requirements.4Provided by IHSNot for ResaleNo reproduction or networking permitted witho

27、ut license from IHS-,-,-MIL-M-63333(AR)4. 1.1 General provisions. The component and subassembly inspectionrequirements of MIL-F-13926 form a part of the quality assurance provisions ofthis specification. Definitions of inspection terms shall be as listed inMIL-STD-109.4.2 First article (initial prod

28、uction) approval. The requirement forfirst article approval and the responsibility (Government or contractor) orfirst article testing shall be as specified in the contract. The sample forfirst article approval tests shall consist of 3 mounts plus 3 each of allitems covered by SQAP. The sample shall

29、be manufactured in the same manner,using the same materials, equipment, processes, and procedures as used inregular production. All parts and materials, including packaging and packing,shall be obtained from the same source of supply as used in regular production.4.2.1 Government testing. When the G

30、overnment is responsible forconducting first article approval tests, the contractor, prior to submittingthe sample to the Government, shall inspect the sample to insure that itconforms to all the requirements of the contract and submit a record of thisinspection with the sample, including certificat

31、es of conformance formaterials.4.2.2 Contractor testing. When the contractor is responsible forconducting first article approval tests, the sample shall be inspected by thecontractor for all the requirements of the contract. The sample and a recordof this inspection, including certificates of confor

32、mance for materials, shallbe submitted to the Government for approval. The Government reserves theright to witness the contractors inspection.4.3 Inspection provisions.4.3.1 Submission of product. Unless otherwise specified by thecontracting officer, inspection lot size, lot formation and presentati

33、onlots shall be in accordance with “Submission of Product” provisions ofMIL-STD-105.of4.3.2 Examination and tests.4.3.2.1 Components and subassemblies. All components and subassembliesshall be inspected in accordance with the inspection provisions contained inSupplementary Quality Assurance Provisio

34、ns (SQAP) listed in the technical datapackage (TDP). In the absence of SQAPS, the applicable Quality Assuranceprovisions of MIL-F-13926 shall apply. Examination, and tests related toSection 3 herein shall be performed on a single defect (individualcharacteristic) basis in accordance with MIL-STD-105

35、 and the sampling plansspecified in Tables I, II and III herein. Examination and tests forpackaging, packing, and marking shall be in accordance with MIL-P-14232 andSection 5 herein. The tabulated classification of defects in Tables I, II,III shall constitute the minimum inspection to be performed b

36、y the supplierafter first article approval and prior to Government acceptance or rejectionby item or lot.5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-63333(AR)TABLE I - CLASSIFICATION OF DEFECTSCLASSCRITICAL : NONEMAJOR: AQL .65% Defective1

37、01.102.103.104.105.106.107.108.109.110.Rigidity, pre-vibrationVibrationRigidity, post-vibrationMounting repeatabilityInsertion and removalPeriscope locking lever - operabilityShield actuating handle - operabilityHandle locking latch - operabilityCircuitryInterchangeability - mechanicalMINOR : NONE D

38、EFINEDREQUIREMENT3.7.33.53.7.33.7.23.7.13.8.1.13.8.1.23.8.1.33.93.10.1TEST PROCEDURE4.6.34.6.44.6.54.6.64.6.84.6.9.14.6.9.24.6.9.34.6.104.6.11.1NOTE : The tests in Table I shall be conducted at a temperature between +600and +90F.4.3.3 Acceptance and rejection. Rejected lots shall be screened for all

39、defective characteristics. Removal. or correction of defective units andresubmittance of rejected lots shall be in accordance withRejection” as specified in MIL-STD-105.4.4 Special sampling.4.4.1 General. One mount shall be selected at randomrepresentative as a control sample fron each 100 produced.

40、shall meet the requirements and tests in Table II.TABLE 11“Acceptance andby a GovernmentThe control sampleCONTROL TEST REQUIREMENT TEST PROCEDURE301. Fabrication 3.1 Applicable Drawings - Visual302. General specifications 3.2 MIL-F-13926 - Visual4.4.2 Environmental. Three mounts shall be selected at

41、 random as samplesfron each 50 produced, or from each months production, whichever occursfirst. Each sample shall meet the requirements and tests in Table III andshall then meet the requirements and tests in Table I.6Provided by IHSNot for ResaleNo reproduction or networking permitted without licens

42、e from IHS-,-,-MIL-M-63333(AR)TABLE IIICONTROL TEST REQUIREMENTS TEST PROCEDURE303.304 l305.306.307.308.Storage temperature(-80 and +160F)Periscope locking leverShield actuating handleHandle locking latchSealingInterchangeability-3.3.13.3.2, 3.8.1.13.3.2, 3.8.1.23.3.2, 3.8.1.33.63.10.24.6.14.6.2, 4.

43、6.9.14.6.2, 4.6.9.24.6,2, 4.6.9.34.6.74.6.11.2pressure retentionNOTE: The tests for Characteristics 304 through 306 inclusive shall beconducted at -65 and +l5OF. The test for Characteristics 307and 308 shall be conducted at a temperature between +60 and +90F.4.4.3 Failure of sample. Should any one i

44、tem of a special sampling failto meet the specified test requirements,-acceptance of the product shall besuspened by the Government until necessary corrections have been made by thecontractor and resubmitted samples have been approved (see 4.3.3).4.5 Inspection equipment. Except as otherwise provide

45、d for by thecontract, the contractor shall supply and maintain inspection equipment inaccordance with the applicable requirements of MIL-I-45607.4.5.1 Government furnished inspection equipment. Where the contractprovides for Government furnished inspection equipment, supply and maintenanceof test eq

46、uipment shall be in accordance with the applicable requirementsspecified in MIL-I-45607.4.5.2 Contractor furnished inspection equipment.4.5.2.1 Government design. Unless otherwise specified in the contract,all inspection equipment specified by drawing number in specifications orSQAPs forming a part

47、of the contract shall be supplied by the contractor inaccordance with technical data listed in the technical data package (TDP).4.5.2.2 Contractor design. The contractor shall design and supplyinspection equipment compatible with the “Test Methods and Procedures”specified in 4.6 of this specificatio

48、n and with the component inspectionprocedures specified in “Examination” and “Test Facilities” requirements ofMIL-F-13926. Since tolerance of test equipment is normally considered to bewithin 10% of the product tolerance for which it is intended, this inherenterror in the test equipment design must

49、be considered as part of theprescribed product tolerance limit. Thus, concept, construction, materials,dimensions and tolerances used in the design of test equipment shall be so7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-63333(AR)selected and controlled as to insure that the test equipment will reliablyindicate acceptab

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1