ARMY MIL-M-63449-1982 MINE ANTI-TANK TRAINING M85 WITH FUZE MINE ANTI-TANK TRAINING PARTS FOR AND LOADING ASSEMBLING AND PACKING《训练反坦克地雷 M85型训练反坦克带导火线地雷 零件及装卸 组装和包装》.pdf

上传人:ideacase155 文档编号:445932 上传时间:2018-11-16 格式:PDF 页数:12 大小:326.56KB
下载 相关 举报
ARMY MIL-M-63449-1982 MINE ANTI-TANK TRAINING M85 WITH FUZE MINE ANTI-TANK TRAINING PARTS FOR AND LOADING ASSEMBLING AND PACKING《训练反坦克地雷 M85型训练反坦克带导火线地雷 零件及装卸 组装和包装》.pdf_第1页
第1页 / 共12页
ARMY MIL-M-63449-1982 MINE ANTI-TANK TRAINING M85 WITH FUZE MINE ANTI-TANK TRAINING PARTS FOR AND LOADING ASSEMBLING AND PACKING《训练反坦克地雷 M85型训练反坦克带导火线地雷 零件及装卸 组装和包装》.pdf_第2页
第2页 / 共12页
ARMY MIL-M-63449-1982 MINE ANTI-TANK TRAINING M85 WITH FUZE MINE ANTI-TANK TRAINING PARTS FOR AND LOADING ASSEMBLING AND PACKING《训练反坦克地雷 M85型训练反坦克带导火线地雷 零件及装卸 组装和包装》.pdf_第3页
第3页 / 共12页
ARMY MIL-M-63449-1982 MINE ANTI-TANK TRAINING M85 WITH FUZE MINE ANTI-TANK TRAINING PARTS FOR AND LOADING ASSEMBLING AND PACKING《训练反坦克地雷 M85型训练反坦克带导火线地雷 零件及装卸 组装和包装》.pdf_第4页
第4页 / 共12页
ARMY MIL-M-63449-1982 MINE ANTI-TANK TRAINING M85 WITH FUZE MINE ANTI-TANK TRAINING PARTS FOR AND LOADING ASSEMBLING AND PACKING《训练反坦克地雷 M85型训练反坦克带导火线地雷 零件及装卸 组装和包装》.pdf_第5页
第5页 / 共12页
亲,该文档总共12页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、- 5-37-43 MIL-M-634q7 13 M 7779306 0350761 5 W MIL-M-63449 (AR) 11 MARCH 1982 MILITARY SPECIFICATION MINE, ANTI-TANK, TRAINING: M85 WITH FUZE, MINE, ANTI-TANK, TRAINING; PARTS FOR AND LOADING, ASSEMBLING AND PACKING This specification is approved for use by the U.S. Army Armament Research and Develo

2、pment Conmiand, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers quality assurance provisions and - preparation for delivery of the M85 Anti-Tank Training Mine. 2. APPLICABLE DOCUMENTS 2.1 Government-documents. 2.1.1

3、. Specifications-arid- standards. Unless otherwise specified (see 6.2), the following specifications and standards, of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, form a part of this specification to the ex

4、tent spec if ied herein. SPECIFICATIONS MILITARY MIL-M-45406 - Mine, Anti-Tank, M21, Parts For. MIL-F-45430 - Fuze, Mine AT, M607, Parts For. MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification For. STANDARDS MILITARY MIL-STD-105 - Sampling Procedures And Tables Fo

5、r Inspection By Attributes. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improvin this document should be addressed to: Commander, US Army Armament desearch and Develo ment Command, Standardization Document Improvement Proposai (DD Form 14

6、26) appearing at the end of this document or by letter. Attn. DRDAR-QA, Dover, New Jersey 07801 by using t R e self-addressed Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-L flIL-fl-634L17 13 7777906 0350762 7 a MIL-M-63449 (AR) 2.1.2 ther-Governme

7、nt-documentsj-drawings;.and.pubications. The following other Government documents, drawings, and publications form a part of this specification to the extent specified herein. DRAWINGS (see 6.4) US ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND 9343033 - Mine, Anti-Tank, Training: M85 with Fuze, Min

8、e, Anti-Tank, Training. 9344288 - Packing and Marking for Mine, AT, Training: M85 (Copies of specifications, standards, drawings, and publications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contra

9、cting officer. ) 2.1.3 Order-of-precedence. of this specification and the references cited herein, the text of this specification shall take precedence. In the event of a conflict between the text 3. REQUIREMENTS 3.1 Materiais- and- parts. Materials and parts shall be in accordance with the applicab

10、le drawings, specifications and standards. 3.2 Mine- assemby. The mine assembly shall comply with all requirements specified on drawing 9343033, all associated drawings, and with all requirements specified in applicable specifications and standards. 3.3 First-artice-inspection. This specification co

11、ntains technical provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the cont.ract. 3.4 Workmanship. The mine assembly shall be fabricated and finished in a thorough, workmanlike manner, It shall be free of burr

12、s, chips, sharp edges, cracks, unblended radii, surface defects, dirt, grease, rust, corrosion products, and other foreign matter. The cleaning method used shall not be injurious to the parts nor shall the parts be contaminated by the cleaning agents. All markings and stampings shall be neat and sha

13、rply defined. mine shall be manufactured and processed in such a manner as to be uniform in quality and free from defects that will affect life, configuration and serviceability. The 4. QUALITY ASSURANCE PROVISIONS 4.1 provisions, provisions of MIL-A-48078 shall apply and are hereby made a part of t

14、his detail spec if ication. Responsibility- for- inspection- and- standard-quality- assurance Unless otherwse specified herein or in the contract, the 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-634LI7 13 7777906 0350763 7 - MIL-M-63449 (

15、AR) 4.2 Classification of inspections. The following types of inspections shalL be conducted on this item: a. First article .inspection (see 4.3). b. Quality conformance inspection (see 4.4). 4.3 First article inspection, 4.3.1 Submission. The contractor shall submit a first article sample as The fi

16、rst article sample shall consist of the following designated by the Contracting Officer for evaluation in accordance with the provisions of 4.3.2. items in sample quantities as indicated below and Table 1. Part Des cr ip ti on Drawings Metal parts assembly 8831343 Body assembly 934709 2 Fuze, Mine,

17、AT, Training 9 3430 35 Mine, AT, Training - M85 9343034 Mine, AT, Training: M85 with Fuze, Mine, AT, Training 9343033 Quant it y 10 10 10 10 10 4.3.2 Inspections to be performed. See MIL-A-48078 and Table I specified herein. 4.3.3 Kejection. See MIL-A-48078. 3 Provided by IHSNot for ResaleNo reprodu

18、ction or networking permitted without license from IHS-,-,-8 4 MIL-M-b3llll7 13 77777Ob 03507bll O Wb - D - 4 N e Q m N 4- e cl m tw N m m N m N m u3 u u al W 9) -a k -0 mw m oc mO Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-tlIL-M-63LILI7 13 777

19、7906 0350765 2 = MIL-M- 6344 9 (AR) 4.4 Oiialty conformance inspection. _-._ -_.- 4.4;1 Inspection lot formation. Inspection lots shall comply with the lot formation provisions of MIL-A-48078. 4.4.2 Examination. See MIL-A-48078. Unless otherwise specified in the Classification of Defects and Tests T

20、ables, sampling plans for major and minor defects shall be in accordance with MIL-STD-105, Inspection Level II. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-W u 3 E O U E U I MIL-M-63447 13 7779706 0350766 4 - CJ CJ rn m n n m m W W CI .rl u4 al a

21、 $ u u a, al a v) i? h h n P a a al al k k .rl .FI 7 w 3 CT al al k k ln v) 4 4 al z d .rl a al k .rl al $4 v) m al ,.cl l4 l4 m 2 -fi m .rl k al u .rl 5 2 al u u a a, u u m u O 4 m 2 al I4 o .FI u 2 k U Fri KI .- . Provided by IHSNot for ResaleNo reproduction or networking permitted without license

22、 from IHS-,-,-MIL-M-634LI 13 7977906 0350767 b W c, H w U W W u E! c O u rl I U dl4l44t-4 cd(d(dmcd 53355 x M &O x N M x M O00 00000 N O i-( O00 00000 -? ? al u O 2 -. d .rl e n PI (d u al M Fi (d 5 wl O uv) O0 a d 4-1 O) a 2 I-l (dl Provided by IHSNot for ResaleNo reproduction or networking permitt

23、ed without license from IHS-,-,-4 b t I4 w alal cc - MIL-M-63447 13 77777Ob 0350770 b I- - I4 rlrlrl a amrd 353 .rl .A .rl .rl 3 333 m wrnw M OH M o InInM 4 amo o O04 . k O 2 60 (d TI 3 n k u o cdcdo dl 10 3 a i i Provided by IHSNot for ResaleNo reproduction or networking permitted without license f

24、rom IHS-,-,-MIL-M-63499 23 m 779770b 0350772 = 4.4.3 Testing. Testing is described in the First Article and Quality Conformance-inspection tables. . 5.4.4 - Inspection equipment. - The inspection equipment required to perform the inspections and tests prescribed herein is described in the Paragraph/

25、Inspection Method columnn in the tables starting with Paragraph 4.4.2.1. The contractor shall submit for approval inspection equipment designs i.n accordance with the terms of the contract. See Section 6 of MIL-A-48078 snd 6.3 herein. 5 PACKAGING I 5.1 Preservation - and packaging. The mines shall b

26、e preserved and packaged in accordance with Dwg. 9344288. 5.2 Packing. The mines, preserved and packaged, shall be packed for shipment in accordance with Dwg. 9344288. 5.3 .Marking. Marking of the carton shall comply with Dwg. 9344288. 5.4 Shipping. When mines of more than one lot are shipped as a c

27、arload, each lot shall be kept separate and the division between lots clearly indicated to prevent mixing of the lots in transit. 6. NOTES 6.1 Intended use. The mine covered by this specification is intended for tise as a training device. 6.2 Ordering data. See MIL-A-48078. 6.3 Submission of inspect

28、ion equipment designs For approval. (See 6.2 _-.-_._.-._l-_ll _I-p of MIL-A-48078). Equipment designs shal be submitted as required to:Co&nander, U.S. Army Armament Research and Development Command, ATTN: DRDAR-QAT-I, Dover, New Jersey 07801. Request letter of submittal .should state contractor, con

29、tract number, specification number, item nomenclature, and classification of defects and test paragraph number. 1 6.4 Drawings. - Drawings listed in Section 2 of this specification under the heading US Army Armament Research and Development Command (ARRADCOM) may also include drawings prepared by an

30、d identified as: Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal, or Picatinny Arsenal drawings. Technical data originally prepared by these activities are now under the cognizance of ARRADCQM. 6.5 Distribution of certificate of compliance. Distribution of the certificate of compliance for

31、each lot shall be sent to: Commander, ARRADCOM, ATTN: DRDAR-QAT-M, Dover, New Jersey 07801. 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ - MIL-M-634Ll7 13 W 7777906 0350772 T W MIL-M-63449 (AR) 6.6 Data cards. (See MIL-A-48078). Distribution of data cards shall include the address specified in 6.5. Cus t od ian : Preparing activity . Aw-AR Amy-AR Project 1345-A157 “ f? U.S. GOVERNMENT PRINTING OFFICE: le82 O - 505-02211844 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1