ARMY MIL-M-70778-1988 MINE ANTI-PERSONNEL M86 ACCEPTOR LEAD ASSEMBLY FOR《杀伤地雷M86型接收器导线的安装》.pdf

上传人:dealItalian200 文档编号:445982 上传时间:2018-11-16 格式:PDF 页数:20 大小:726.01KB
下载 相关 举报
ARMY MIL-M-70778-1988 MINE ANTI-PERSONNEL M86 ACCEPTOR LEAD ASSEMBLY FOR《杀伤地雷M86型接收器导线的安装》.pdf_第1页
第1页 / 共20页
ARMY MIL-M-70778-1988 MINE ANTI-PERSONNEL M86 ACCEPTOR LEAD ASSEMBLY FOR《杀伤地雷M86型接收器导线的安装》.pdf_第2页
第2页 / 共20页
ARMY MIL-M-70778-1988 MINE ANTI-PERSONNEL M86 ACCEPTOR LEAD ASSEMBLY FOR《杀伤地雷M86型接收器导线的安装》.pdf_第3页
第3页 / 共20页
ARMY MIL-M-70778-1988 MINE ANTI-PERSONNEL M86 ACCEPTOR LEAD ASSEMBLY FOR《杀伤地雷M86型接收器导线的安装》.pdf_第4页
第4页 / 共20页
ARMY MIL-M-70778-1988 MINE ANTI-PERSONNEL M86 ACCEPTOR LEAD ASSEMBLY FOR《杀伤地雷M86型接收器导线的安装》.pdf_第5页
第5页 / 共20页
亲,该文档总共20页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-M-70778 13 7777906 0357432 T = s-37- 03 Beneticial comments (recommendations, additions, deletions) and any pertinent data which may be of use in Improving this document should be addressed to: Commander, U.S. Army Armament,Munitions and Chemical Command, Atm. AMSMC-QA, Picatinny Arsenal, New Je

2、rsey 07806-5000 by using the self-addressed Standardiza- tion Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. MIL-M-70778 (AR) 10 JULY 1988 . MILITARY SPECIFICATION MINE, ANTI-PERSONNEL, M86 ACCEPTOR . LEAD ASSEMBLY FOR . This specification is approve

3、d for use within the U.S. Army Armament Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification contains requirements not normally covered by the drawings and provides quality assurance jyovisions f

4、or the fabrication of parts, loading, assembling and packing for one type of Acceptor Lead Assembly used in the munition Pursuit Deterrent Munition (PDM) M86. .- 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and standards form a pa

5、rt of this specification to the extent cpecif ied herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited in the solicitation. SPECIFlCATIONS MILITAR

6、Y MIL-A-48078 - Ammunition, Standard Quality Assurance . Provisions, Genera Speclf ication For. AMSC N/A FSC 1345 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-7

7、0778 (AR) STAN DARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MIL-STD-3 3 1 MIL-STD- 6 50 - Explosive:. Sampling, Inspection Inspection by Attributes. and Performance Tests for. and Testing. - Fuze and Fuze components Environmental 2.1.2 Other Government documents and publications.

8、The i following other Government documents and publications form a part of this standard to the extent specified herein. O t n M Co I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-70778 13 m 77777Ob 0357g4b T m- MIL-M-70778 (AR) 4.4.3 Testing

9、. Testing is described in the First Article and Quality Conformance Inspection Tables. 4.4.4 Inspection equipment. The inspection equipment required ko perform the examinations and tests prescribed herein is described in the “Paragraph Reference/Inspection Method“ column in the tables starting with

10、4.4.2.1. The contractor shall submit for approval inspection equipment designs in accordance with the terms of the contract. See MIL-A-48078. 4.5 Methods of inspection. 4.5.1 Dimensional control of stamped parts. In place of the normal sampling associated with the Classification of Defects, and with

11、 the approval of the Contracting Officer, a sample of at least ten (10) parts shall be dimensionally inspected to qualify the tool used in the stamping process for use in production. In addition, a random sample of five (5) parts shall be selected from the last portion of each hours production for d

12、imensional inspection as a control of the tool during production, If any defective parts are found during qualification of the tool, the tool producing the defective Sart shall not be used in production . If any defective parts are found when inspection is performed for control of the tool, the tool

13、 producing the defective part shall be removed from production. Further, that portion of production since the last tool control check shall be returned to the contractor for corrective action. All tools removed from production because of some fault, may, after reworking, be returned to production pr

14、oviding they pass the qualification test above. The contractor may request a change of inspection frequency providing he presents objective evidence to the Contracting Officer to substantiate the request . 4.5.2 Moisture and volatiles content of explosive charge. The contractor shall provide adequat

15、e controls to insure compliance with the applicable requirements. The mositure and volatiles content of the explosive charge shall be determined at the loading station at the time of loading. This determination - shall be made at least once each four (4) hours of production. Sampling and testing of

16、the explosive charge shall be in accordance with MIL-STD-650, Method 101.5. In addition, if the moisture and volatiles content fails to comply with the requirement specified on the applicable drawing and loading has not begun, the explosive charge material shall be rejected until corrective action h

17、as been taken as verified by repeating the moisture and volatiles content determination. If loading has begun, acceptor lead assemblies loaded with the non-conforming explosive charge shall be rejected. 15 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-

18、,-,-MIL-M-70778 13 m 777770b 0357Li47 L W MIL-M-70778 (AR) 4.5.3 Density of explosive charge. A minimum of two (2) assemblies, representative of the acceptor lead assemblies being processed, shall be loaded and the densities determined to qualify each press prior to its use in production, In additio

19、n, a sample of two (2) assemblies shall be processed during the last portion of each one (i) hours production from each press and the density determined as a control of each press during production. If any defective assembly is found when inspection is performed for control of a press, the press pro

20、ducing the defective assembly shall be removed from production. Further, that portion of production since the last control check shall be returned to the contractor for corrective action. All presses removed from production because of some fault, may, after corrective action, be returned to producti

21、on providing they pass the qualification test above. The following procedure shall be used to determine the density of the explosive charge. a. Weight empty acceptor lead (grams). b. Measure bottom thickness (inches). c. Measure wall thickness (inches). d. Load cup. e. Weight loaded acceptor lead (g

22、rams). f . Measure height to top of charge (inches). g. Measure outside diameter of loaded acceptor lead h. Calculate weight of charge (e-a) (grams). i. Calculate height of charge (f-b) (inches). j. Calculate volume of explosive charge (cubic (inches). centimeters) = (.7854) x (16.39) x (g-2c) x (g-

23、2c) x (i). k. Calculate density of explosive charge (above). (grams per cubic centimeter) = (h/j). -. If any assembly fails to comply with the density requirements specified on the applicable drawing, it shall be classed defective. This is a destructive test. Assemblies so tested shall not be return

24、ed to the lot. 16 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-M-70778 13 = 777770b 0357448 3 a MIL-M-70778 (AR) NOTE: When weighing in water, use distilled water containing a suitable wetting agent, e .g. “Aerosol“ (lcc per 250cc distilled w

25、ater) . 4R5,4 Functioning output. The acceptor lead assemblies shall be assembled into a plastic holder and placed with the end of the assembly in contact with a witness plate of material and thickness as specified in 3.3. The acceptor lead assembly shall be initiated by an M100 electric detonator.

26、The detonator shall be initiated by applying the energy from a suitable power source (e.9. 100 microfarad capacitor charged to 1.6 volts maximum or 6 volt battery). The depth of the desression in the witness plate shall be determined using a dial indicator with a .O15 + .O01 inch spherical radius in

27、dicator tip. - 4. 5. 5 Conditioning and functioning. 4.5.5.1 Preparation of samsles. Each acceptor lead assembly to be subjected to the functioning test shall be assembled into a slider assembly as per 9366684. This assembly shall then be assembled into a SfA as per 9366668. The slider shall be asse

28、mbled as to be “in line“ with the centerline of detonator hole of housing to be off .O45 - .O05 inch from centerline of acceptor lead of slider. Assembly of the piston actuator and the safety pin shall be omitted. An electric detonator M100 (Dwg. 9245691) shall be shorted and assembled with seal was

29、her into the input hole of the SstA assembly-. A successful test shall constitute test shall consist of firing the detonator propagation thru the acceptor lead assembly igniting the transfer lead assembly and into the lead cup assembly. A similar test plan could be formulated by the contractor provi

30、ding that acceptance of the test method is approved prior to testing by the government agency. 4.5, 5. 2 Hot conditioninq. The acceptor lead assemblies to be conditioned and functioned at hot temperature shall be prepared as specified in 4.5.5.1. They shall then be placed in a suitable temperature c

31、onditioning box and the temperature increased to 165 + 50F with relative humidity not less than 15%. The rate of temperature increase shall not exceed 180F per minute. The samples shall be maintained at temperature for iortj! (40) hours minimum. The temperature in the oven shall then be reduced to 1

32、25 + 5oF and the assemblies shall be conditioned at temperature for two (2) hours minimum. The assemblies shall then be removed from the oven and functioned as specified in 4.5.5.4. Set-up time between removal from the oven and firing shall be five (5) minutes maximum. 1 17 Provided by IHSNot for Re

33、saleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-70778 13 9 997770b 0357447 5 MIL-M-70778 (AR) 4.5.5.3 Cold conditioninq. The acceptor lead assemblies to be conditioned and functioned at cold temperature shall be prepared as specified in 4.5.5.1. They shall then be plac

34、ed in a suitable chamber and the temperature decreased to -25 t S0F. The rate of decrease shall not exceed 18OF per minute. The assemblies shall be conditioned at temperature for two (2) hours minimum. The assemblies shall then be removed from the chamber and functioned as specified in 4.5.5.4. Set-

35、up time between removal from the chamber and firing shall be five (5) minutes maximum. - 4.5.5.4 Functioninq. Each assembly prepared as specified in 4.5.5.1 and after applicable temperature conditioning shall have a transfer lead assembly and lead cup assembly assembled to the output side of the acc

36、eptor lead using the S&A assembly as per 936668. The detonator shall be functioned behind an approved barricade. The detonator short shall be removed and the detonator shall be initiated by a suitable power source (e.g. 6 volt battery). If the acceptor lead assembly fails to initiate the transfer le

37、ad assembly (in the slider assembly) or fails to cause high order detonation of the lead cup assembly as specified in 3.4 as evidenced by a witness mark on the witness plate the acceptor lead assembly shall be classed defective. Any assembly in which the detonator fails to fire shall be classed as a

38、 “no test“ and a replacement S&A assembly as specified in 4.5.5.1 shall be used in its place. 4.5.6 Waterproofness test. The acceptor lead assemblies shall be immersed in water at a depth of 2 inches minimum from the surface of the water to the top of-the assemblies. The water temperature shall be m

39、aintained at 70 + 10F. After a minimum of 40 hours, the assemblies shall be removed from the water and subjected to the output test specified in 4.5.4. The functioning test of all samples shall be completed within four hours after the assemblies are removed from the water. WARNING: The above tests a

40、re conducted on assemblies containing an explosive component. Test barricades (where used) I procedures and equipment shall have prior approval of the contractors safety officer. 5. PACKAGING 5.1 Preservation an packaginq. 5.1.1 Level C. The acceptor lead assembly shall be preserved and packaged in

41、accordance with Dwg. 7548104. 5.2 Packing. 5.2.1 Level C. The acceptor lead assembly, preserved and packaged as specified in 5.1.1, shall be packed in accordance with Dwgs. 7548103. 18 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-=s! MIL-M-70778 1

42、3 m 779970b 0357450 1 The test shall be performed on lead cup assemblies for each lot which have been stored for more than two years, or under adverse conditions for any period of time. If the specification for the ammunition item into which the lead cup assemblies are assembled does not require tha

43、t the check test be performed, the Contracting Oficer should insert in the contract a provision for the performance of the check test. The contracting officer will arrange for the contractor to be reimbursed for expense incurred in his performance of the check test for possible deterioration. 6.5 Dr

44、awinqs. Drawings listed in Section 2 of this specification under the heading U.S. Army Armament, Research, Development and Engineering Center (ARDEC) may also include drawings prepared by and identified as Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal or Picatinny Arsenal drawings. Techni

45、cal data originally prepared by these activities is now under the cognizance of ARDEC, I i i i I L I a I MIL-M-70778 (AR) 5.3 Marking. Marking shall be in accordance with dwgs. 7548103, 7548104 and Code of Federal Regulations, Title 49, Parts 100-199. 5.4 Shipping. When components from more than one

46、 lot are shipped at one time, each lot shall be kept separate, and the division between lots clearly indicated to prevent mixing of the lots in transit. 6. NOTES 6.1 Intended use. The components covered by this specification are intended for use in the Munition for Mine, Anti-Personnel M86. 6.2 Orde

47、ring data. See MIL-A-48078. 6.3 Submission of inspection equipment design for approval. See MIL-A-48078. Submit equipment designs and test plans as required to Commander, ATTN: AMSMC-QAT-I (D) , Picatinny Arsenal, New Jersey 07806-5000. Request letter of submittal state contractor I contract number

48、, specification number, item nomenclature and classification of defects or test paragraph. This address will be specified on the Contract Data Requirements List, DD Form 1423 in the contract. Unless otherwise specified, data item DI-R-1714 will apply. 19 Provided by IHSNot for ResaleNo reproduction

49、or networking permitted without license from IHS-,-,-MIL-M-7077 13 E 9777706 0357Ll51 3 = MIL-M-7 O 7 7 8 (AR) 6.6 Subject term (key word) listinq. Accept or Lead Assembly Pursuit Deterrent Munition Custodian : Army-AR .- 20 Preparing activity: Army-AR (Project 1345-A519) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1