ARMY MIL-P-10480 D-1973 PLUNGER DELAY M1 LOADING ASSEMBLING AND PACKING《M1式延期药柱的装药 组装和包装》.pdf

上传人:figureissue185 文档编号:446060 上传时间:2018-11-16 格式:PDF 页数:13 大小:562.13KB
下载 相关 举报
ARMY MIL-P-10480 D-1973 PLUNGER DELAY M1 LOADING ASSEMBLING AND PACKING《M1式延期药柱的装药 组装和包装》.pdf_第1页
第1页 / 共13页
ARMY MIL-P-10480 D-1973 PLUNGER DELAY M1 LOADING ASSEMBLING AND PACKING《M1式延期药柱的装药 组装和包装》.pdf_第2页
第2页 / 共13页
ARMY MIL-P-10480 D-1973 PLUNGER DELAY M1 LOADING ASSEMBLING AND PACKING《M1式延期药柱的装药 组装和包装》.pdf_第3页
第3页 / 共13页
ARMY MIL-P-10480 D-1973 PLUNGER DELAY M1 LOADING ASSEMBLING AND PACKING《M1式延期药柱的装药 组装和包装》.pdf_第4页
第4页 / 共13页
ARMY MIL-P-10480 D-1973 PLUNGER DELAY M1 LOADING ASSEMBLING AND PACKING《M1式延期药柱的装药 组装和包装》.pdf_第5页
第5页 / 共13页
亲,该文档总共13页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MI L-P-10480D DRAW I NGS ARMY .MIL-P-LOqBOD 13 7777706 0273026 7 MU 8797864 - Delay Plunger, M1, Assembly 8858565 - Box, Packing, Ammunition for Delay P,unger, MI 8858566 - Carton, Packing, Ammunition f

2、or Delay Plunger, MI PUBLICATIONS ARMY ET-8797864 - Equipment Tabulation .- -. , . (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be ob- tained from the procuring activity or as directed by the Contractin

3、g Officer.) 3. REQU I REMENTS 3.1 Material. - Materials and parts shall be in accordance with applicable drawings and specifications. 3.2 Delay Plunger. - The delay plungers shall comply with all ments specified on Drawing (dwg.) 8737364 and with all requirements in applicable specifications. 3.3 Jo

4、lt and Jumble. - The delay plunger assemblies shall cor the requirements of 111 L-STD-331 , Tes-ts 101.1 and 102.1. requ i re- cpeci f ied ly with 3.4 Drop. - The delay plunger assemblies shall have no explosive ele- ments explode when subjected to a drop of not less than three (3) feet or more than

5、 three and one half (3 1/21 feet. 3.5 Arming. - The delay plunger assembly sha!l have no parts fail and shall move to the armed position when rotated at a speed of not less than 2075 revolutions per minute (rpm) nor more than 2125 rpm. The armed position is that position whereby both centrifugal plu

6、nger pins are fully retracted into the body cavity and locked in that position by the centrifugai plunger pin lock. 3.6 Non-Arming. - The delay plunger assembly shall have no parts fail and shall remain in the unarmed position when rotated at a speed of not less than I300 rprn nor more than 1325 rpm

7、. The unarmed position is that pos tion wherebythe distance between the centrifugal plunger pins is less than 0.115 inch. 2 . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MI L-P-1048OD (MU) 3.7 Functioning. - The delay plunger assembly shall funct

8、ion satis- factorily as evidenced by the subsequent detonation of the Hl7 Detonator when tested as specified in 4.3.5. 3.8 Workmanship. - All parts and assemblies shall be fabricated and loaded in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, rust and other

9、foreign matter. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. shall be continuous except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined, Exterior surface coatings 4

10、. QUALITY ASSURANCE PROVISIONS 4.1 General Quality Assurance Provisions. - Unless otherwise speci- fied in the contract or purchase order, the supplier is responsible for the performance of al 1 inspect ion requ i rements as speci f ied herei n. Ex- cept as otherwise specified in the contract or ord

11、er, the supplier may use his own or any other facilities suitable for the performance of the inspec- tion requirements specified herein, unless disapproved by the Government. The Government reserves the riqht to perform any of the inspections set forth in the specification where such inspections are

12、 deemed necessary to assure suppl es and services conform to prescribed requirements. Refer- ence shall be made to Standard MIL-STD-109 in order to define terms used herein. The provisions of Specification MIL-A-2550 shall apply. 4.1.1 Submission of Product. - At the time each completed lot of items

13、 deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the following information accom- panied by a certificate which attests that the information provided is correct and appl icable to the product being submi tted: a. A statement that the lot comp

14、lies with all of the quality assurance provisions specified in this specification. . b. Drawing and specification number and date, together with . identification and date of changes thereto. c. A statement that all material purchased by the contractor meets requirements, when such material is contro

15、lled by Government or commercial specifications referenced in any of the contractual documents, and that certificates of conformance are on file and available for review. d. Number of items in the lot. e. Date submi tted. The certificate shall be signed by a responsible agent of the certifying organ

16、ization. The initial certificate submitted shall be substantiated 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo repr

17、oduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-c MIL-P-304BOD 33 = 9993906 0293033 O i” - MI L-P-1048OD (MU) Minor: AQL 1 .O Percent 201. C.ontents mve when carton is 202. Marking mislead

18、ing or unidenti- shaken Hanual 04003 fiable Visual 04004 4.2.2.5 Bag, Sealed Barrier (see dwg. 3658566, when appl cable) Ca tegor i es Defects Method of I ns pec t i on Critical: Idone defined. bajor: AQL O.lt0 Percent 101. Waterproofness destroyed by separation of heat seal or rip, tear or puncture

19、 Visual Minor: None defined. 4.2.2.6 Box, Packing, Wood, Sealed (see dwg. 8858565). Categories Critical: None defined. Defects Method of I nspec t i on Code No. O5001 Code No. Major: AQL 1 .O Percent 101. Hardware missing, broken or loose . Visua Man ua 102. Strapping missing, broken or loose . Visu

20、a Manua 103. Contents exposed Visua 104. Board broken or split . Visua 105. DOD symbol misleading or unidentifiable Visua Minor: APL 2.5 Percent 201. Hardware improperly engaged . Visual- 202. Handle missing or insecure Visual- Man ua 1 klanua 1 203. Contents loose (when box is tilted) Manual 204. S

21、trapping improperly assembled Visual 0600 1 oGoo2 06003 O6004 06005 06006 06007 06009 06009 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MI L-P-1048OD (MU) 205. Marking misleading or unidenti- 206. Car seal missina, unsealed or fiable Visual imp

22、roper1 y pos i t ioned . Vi sun 1 060 060 4.2.3 Testins 4.2.3.1 Arming (sce 3.5) - !ajor Defcct - Code 140. O20 shall be performed 1OC rci-cent. rsny tlclay plun9er wtiicli fa the requirements of. 3.5 shall be classed defective and renov The tests shall be perforned as specified in 4.3.3 using eclu

23、ance with 4.2.4, o 1 4. - This test s to comply with d from the lot. pment n accord- 4.2.3.2 Non-Arming (see 3.6) - Critical Defect - Code Ilo. O20 5. - This test shall be performed 100 percent. Any delay plunoer which fails to comply with the requirements of 3.6 shall be classed defective and remov

24、ed from the lot. The test shall be performed as specified in It.3.4 using equipment in accordance with 4.2.4. 4.2.3.3 Jolt and Jumble (see 3.3) - Critical Defect - Code idoe 02016.- Beginning with the first lot produced and continuing until three consecutive lots have complied with the specified req

25、uirements, 36 loaded delay plunger assemblies shall be selected from each lot, Thereafter, 12 delay plunaer assemblies shall be selected from each lot. The sanie assemblies subjected to the jolt test shall be subjected to the jumble test. The test shall be performed as specified in 4.3.1 using equip

26、ment in accordance with 4.2.4. if one or more delay plunger assemblies fail to comply with the specified . requirements, or if one or more plunqers arm, function or cause explosive breakup (dusting), the lot shall be rejected. 4.2,3.4 Drop (see 3.4) - Critical Defect - Code No. 02017. - This test sh

27、all be performed 100 percent. The test shall be performed as specified in 4.3.2 using equipment in accordance with 4.2.4. Delay plunger assemblies which fail this test shall be removed from the lot. 4.2.3.5 Functioning (see 3.7) - Major Defect - Code NO. 02018. - Beginning with the first lot produce

28、d and continuing until three consecutive lots have been accepted, the sampling plan shall be in accordance with Stan- dard MIL-STD-105 using Code Letter L and an AQL of 1.0 percent. Thereafter, the sampling plan for this test shall be in accordance with MIL-CTD-105 usinq Code Letter J at an AQL of 1

29、 .O percent. 4.2.3.6 Check Test for Deterioration of Delay Element Assembly (see MIL-D-46486A or MIL-D-118116) - Major Defect - Code No. OCl. - If the total time between original acceptance of any delay element assembly lot and the assembly of that lot into the delay plunger assemblies exceeds two y

30、ears, 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-fflIL-P-lO4OD 13 9777706 0273033 4 mi MIL-P-1048QD (MU) or if the delay element assemb.lies have been subjected to adverse condi- tions, however brief, at any time since previous tests the delay

31、 element assembly lot shall be subjected to and must satisfactorily pass the check test for deterioration specified ti MIL-46435A or MIL-D-I+8116 immedi- ately before the delay element assembly lot is assembled into the delay plunger assemblies. This test shall be performed by the contractor on dela

32、y element assemblies selected by the Government Inspector at the faci 1 i ty assembl ing the delay element assembl ies into the delay plunger assembl es (see 6.4). . 4.2.4 inspection Equipment. - The inspection equipment required to perform the examinations and tests prescribed in this section is id

33、enti- fied by Equipment Tabulation ET-8797864 and under the Method of Inspec- tion“ headings in 4.2.2 and 4.2.3 (see 6.3). 4.2.4.1 Government Rights to Documentation. - Inspection equipment drawings and lists provided and revised in accordance with the requirements may be used by DOD activities for

34、design, procurement, manufacture, testing, evaluation, production and receiving inspection, overhaul, shipping, storage, identification of stock, ordering and storage of replacement parts, inspec- tion of items at overhaul, general maintenance of equipment, construction, survey and whenever inspecti

35、on equipment drawings are needed. 4.2.4.2 Government Use of Contractors Inspection and Test Equipment.- The contractor shall make available to the Government all inspection and test equipment necessary for determining conformance with contract requirements. Personnel for operating the equipment and

36、verification of its accuracy shall be supplied by the contractor for the performance of examination or test by the Government. 4.3 Test Methods and Procedures 4.3.1 Jolt and Jumble. - The delay plunger assemblies shall be sub- jected to the jolt test specified in Standard MIL-STR-331, Test 01.1. Aft

37、er completion of the jolt test and prior to disassembly for inspection purposes, the same delay plunger assemblies shall be subjected to the jum- ble test specified in Standard MIL-STD-331, Test 102.1 Examination shall then be made to determine compliance with 3.3. 4.3.2 Drop. - The unarmed delay pl

38、unger assembly shall be placed in a specified fixture, with the plunge down a tube not less than 3.0 feet n more than 3.5 feet. Observation shall be made to determine compl iance with 3.4. body facing up, and allowed to drop 4.3.3 Arming. - The delay plunger assemblies shall be subjected to the armi

39、ng test in accordance with all of the following requirements: 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MI L-P-I 04080 (MU) I a. The delay plunger assembly, in the unarmed position, shall be rotated in a vertical position with the open end of

40、 the housing in the upward pos i t ion. be as nearly uniform as practicable for each assembly under test. b. The acceleration imparted to the delay plunger assembly shall c. No assembly shall be rotated at a speed exceeding 2125 rpm. d, Total time from starting to stopping of the plunger assembly e,

41、 Examination shall be made to determine compliance with 3.5. f. Upon completion of the test, the assembly shall be restored shall not exceed five (5.0) seconds. manual 1 y to the unarmed pos i t ion. 4.3.4 Non-Arming. - This test shall follow the arming test and shall be performed in accordance with

42、 4.3.3, except that no assembly shall be rotated at a speed less than I300 rpm, nor more than I325 rpm. When using equipment which requires a visual inspection for the non-arming condi tion, the total time from starting to stopping of the rotation of the plunger body assembly shall not be less than

43、three (3) seconds. Examination shall be made to determine compliance with 3.6. 4.3.5 Functioning. - The delay plunger assembly, in the armed posi- tion, shall be placed in a holding fixture which simulates the delay portion of the M557 fuze. The MI7 Detonator shall be located below the straight thro

44、ugh flash hole of the MI plunger body at a distance of 0.150 inches. A weight not exceeding eight (8) ounces shall fall from a vertical height not exceeding twelve (12) inches to impact the housing of the assembly. Obser- vation shall be made to determine compliance with 3.7. The test fixture shall

45、be as specified in 4.2.4. Assemblies subjected to this test shall not be returned to the lot. 5. PREPARATION FOR DELIVERY 5.1 Preservation and Packaging 5.1.1 Level C. - Packaging for Plunger, Delay, M1 shall be in accord- ance wi th dwg. 8858566. I 5.2 Packing 5.2.1 Level C. - Packing for Plunger,

46、Delay, MI shall be in accordance with dwg. 8858565. 5.3 Marking. - Marking shall be in accordance with the applicable I packing drawing. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MI L-P-1048OD (MU) 6. NOTES 6.1 Ordering Data. - Procurement docu

47、ments shall specify the fol lowing: a. Title, number and date of this specification. b. Data Cards. - Data cards shall be perpared for each lot in accordance with the information specified in Standard MI L-STD-1167. 6.2 Inspection Code Numbers. - The five digit code numbers assigned to the inspectio

48、ns herein are to facilitate future data collection and anal YS i s by the Government. 6.3 Inspection Equipment Designs. - Inspection equipment designs are of two types - Government Special Inspection Equipment (SIE) designs and contractor designs. SIE designs are designated by drawing numbers on the

49、 Equipment Lists referenced on the Equipment Tabulation. Design responsi- bi 1 i ty for al 1 other inspection equipment is assigned to the contractor. Equipment to be designed by the contractor is designated “Ci?“. The con- tractor need not furnish any design when a complete Government SIE desiqn is provided. Unless otherwise specified, however, the contra

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1