ARMY MIL-P-46269-1960 PRIMER PERCUSSION ELECTRIC M75 METAL PARTS FOR《M75式电撞两用引物用金属件》.pdf

上传人:arrownail386 文档编号:446276 上传时间:2018-11-16 格式:PDF 页数:9 大小:451.75KB
下载 相关 举报
ARMY MIL-P-46269-1960 PRIMER PERCUSSION ELECTRIC M75 METAL PARTS FOR《M75式电撞两用引物用金属件》.pdf_第1页
第1页 / 共9页
ARMY MIL-P-46269-1960 PRIMER PERCUSSION ELECTRIC M75 METAL PARTS FOR《M75式电撞两用引物用金属件》.pdf_第2页
第2页 / 共9页
ARMY MIL-P-46269-1960 PRIMER PERCUSSION ELECTRIC M75 METAL PARTS FOR《M75式电撞两用引物用金属件》.pdf_第3页
第3页 / 共9页
ARMY MIL-P-46269-1960 PRIMER PERCUSSION ELECTRIC M75 METAL PARTS FOR《M75式电撞两用引物用金属件》.pdf_第4页
第4页 / 共9页
ARMY MIL-P-46269-1960 PRIMER PERCUSSION ELECTRIC M75 METAL PARTS FOR《M75式电撞两用引物用金属件》.pdf_第5页
第5页 / 共9页
亲,该文档总共9页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-P-462b9 13 7779706 0310544 b m s-37-17 KUlTAR SPECIFICATIOE PRIIW, PERCSSI, EIZCIIRIC, “75 mrAL PARTS FOR 1. scope 1.1 Thfe eptciifcatfon cover8 the =tal ppte for one type primer mlgmted as Priiez-, Iiecueion, Electric, m5 for use in Ay+,Uepy Amunition. 2.1 The following doeoPiiiente of thie les

2、ue n effect on bate of fivbtian for bids form 8 pert af this epcekfcation to the extent spscfe herein. W-T-111 - Tape; C-d (Sealing ard Securing) QQ-H-i5l - Idctale: General Specifleation for Inspection of PPP-B- - BOXGE, Pibe* PPP-(2-843 - Cushioning hteral, Celluloee MIL-C-490 - CbeanPng anb Prepa

3、ration of Farrow and Zinc Coated Surfaces 1IIL-G-2550 - General Speefficatian for Anrmuiitfon Except SnaU Apiae ldu-P-10025 - Fackagng and BhlrIng %OF DoPiestfr Shiprcnt oi Inert for OPganic Protective Coatings. Anaunition. Aiianmftion Components Provided by IHSNot for ResaleNo reproduction or netwo

4、rking permitted without license from IHS-,-,-MIL-P-462b7 13 I 997770b 0330545 8 I na-ST-log - sriiipiq Proctdurco and Wbbs for Inapectloa by Attrlbuter, Ma4TD-lOg - Inspection Pam and Definitiono. c-754956 - Boby A-754959 - Cloeure Asieirbly B-754962 - Ccataii#f Assembly B-7548483 - Dim, Cloefng 3.1

5、 Ilrferirl.-Yhteriala shall be In aceort. The test shall be performsd a8 specified in 4.3.2. 4.2.3.3 aupimre teat (aee 3.5) mur bfect.-Th+ earigling pian for thir teat shrill be ia accordance with ML-STD-lO5, using Table IV-A, cod4 letter K and an AU of 0.10 percent. 4.2.3.4 ir mesanre bet (ate dvg.

6、 754926 2).-he sanrpiing pian for aiil tert ahai be in accordance with MIL-STD-lO5, using ccde letter L and an AQL of 0.25 percent. The test 8haU be peromd a apacified in par8graph 4.3.4. 4.2.3.5 Freedom firam alkalies and strong acids.-Thrae sampling containerr from each four hour production ehsll

7、be eelected for thii, teat. peerimmed as specified in peragraph 4.3.5. 4.2.3.6 Freedarn from oil and greaae.-Three sample containers rcm each i- hour production shall be aelectsd for this teet. specified in 4.3.6. 4.2.4 Ispectian cquigmsnt.-For the peronrrnce of the examhutiom arid teats specified i

8、n 4.2 and 4.3, when applicable, the contractor shall have available, and utilize correctly, ali necemsary gagea, measuring and testing equipnt identified by -ex of inspection Equipment Lists No. GL-8801950, or approved equivalcnta tereto. When inspecta the contractore inspection equipment, the Gover

9、nment inspector will Betermine that the cmtractor has available, and utilizes correctly, gages, measurng and testing eqaipeient oi the required accuracy and precisian ami that the inetriinients are of the proper type and range to nmke masuremente of the required accuracy. standarde, and appropriate

10、inatwnts for regularly echeduled calibration of his inepection equipnt. iaaintaintd by the contractor anb mdd available for review by the Governiient. caltbration of gapes, staadards, and inetrioient0 wlll be periodically checked by authorized Government personnel. The teat ahall be perfarmed as spe

11、cified in 4.3.3. The test ebU be The test shall be prfd am The contractor will have apgilable 8 set of meter gagea, Recorde of auch regularly scheduled calibration will be The 4.3 Teat methode and procedures. 4.3.1 Strese relief.-The monitoring 6hai. consiet of surveillance of the operations at regu

12、iar but unechedule intervals to deteriaine th8t they are be- conducted in accorance with the piremcrlbed wocedurcs. Wben, the iniipectoa discovers that the operations are not being perfarud in accordance with the required procedurca, he ehaU reject all item treer relieved since his last satisfactory

13、 eurveance. 100 percenC. Tba ContmCtW ah.U reprocess these reJected item 7 r Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.3.2 Mercurous nitrate test.-The primer bodies shall be tested in accordance with Federal Test Method Standard Bo. 151, ktho

14、d 831. Each body shall be examined for cracks. 4.3.3 Rupture test.-The container assembly shall be tested ln accordance with the procedure specified In the Index of Inspection Equipment List (see 6.2). 4.3.4 Air pressure test.-The sample container shall be subjected to the teat and procedure specifi

15、ed in the Index of neipectlon EquipiPent Liete (see 6.2). 4.3.5 Freedom from alicaiee anci strong acide. -The container aseaipbiiie rim be tested in accorance with Specification MIL-C-490. If the lWtr specified herein have not been complied with, inspection for acceptance shall be-stopped until corr

16、ective action ha8 been taken. Aiter corrective action, eriirpiing shall be reemred as specified In 4.2.3.5. 4.3.6 Freedom from oil and greaea.-The container assemblies shrl be terted and action taken in accordance with Specification MIL-C-490. 5. PREPARATION FCW DELIVERY 5.1 Preeervation and packag-

17、. 5.1.1 Level C. 5.1.1.1 DIOC, ci08ing ( dWg. B-75WI83 .-Ihn thowand closing disce ib8U be 5.2 Packiq.-All prts ehall be packed in accordance with the reqitireients packed in bulk in a 5 by 7 1/2 inch comnerciil, minima 30 pound (lb.) basis weight, kraft coin envelope with erunipaed en8 flap. epecif

18、ied in Specification bIIL-P-lOO25 alad ehaU comply with the Quality Aseurance provieions themoi. hvel C. -The inert parts eh8i.i be pcked ao irzdicated below. construction of the carton and the Paterial requirements of the carton and partitioqe ahall comply with Federal Specification PPP-B-. iuniieh

19、ed preproduction sampler of all packing naterial so that proper ft of packing Poteriala and nietal parte can be determined. rterial diilicnrrione to provide a proper fit of all prte, as deteraiaed to be necessary by elpirminatlon of sample pschs, is permissable. by 20 arrangepent within half-slotted

20、 “A“ flute, 200 Ib. bet, double-faced corrugstsd parttcm6 In 2 layers in a 275 lb. test RSC ityle, “B“ flute (loable- faced Typc I, class 1, fiberboard carton. pb. inri and the fact that the Govermnt my have formulated, furnished, or In any my supplied the aaid drawings, spclficatione, or- other dat

21、a Is not to be regarded by implication or otherwiee a8 in any menner Ucenelng the holder or any other person or corporation, or conveying any rights or perniesion to mnufacture, use, OP sell any patented invention that may in any way be related thereto. Custodian Ariely - Ordnance Corps Preparing activity8 Army - Ordrunce Corpi 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1