ARMY MIL-P-48566 (1)-1983 PERISCOPES TANK 11747126 AND 11747127《坦克潜望镜 11747126和11747127》.pdf

上传人:bonesoil321 文档编号:446399 上传时间:2018-11-16 格式:PDF 页数:2 大小:95.44KB
下载 相关 举报
ARMY MIL-P-48566 (1)-1983 PERISCOPES TANK 11747126 AND 11747127《坦克潜望镜 11747126和11747127》.pdf_第1页
第1页 / 共2页
ARMY MIL-P-48566 (1)-1983 PERISCOPES TANK 11747126 AND 11747127《坦克潜望镜 11747126和11747127》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、AMENDMENT 1 14 March 1983 i c MILITARY SPECIFICATION PERISCOPES, TANK: 11747126 AND .11747127 This Amendment forms a part of Military Specification MIL-P-48566(MU), dated 9 April 1976, and,is approved for use by the U.S. Army Armament Research and Development Command, and is available for use by all

2、 Departments and Agencies of the Department of Defense. PAGE 2 .Add Paragraph 3.6.1 as follows: I “3.6.1 Sealing. The Periscope equipped with purging valve, without the head assembly, shall show no evidence of leakage in excess of 0.1 psi/hour at 5 + 0.25 psig internal pressure using dry . nitrogen

3、gas having a dew poht of -250 or lower. also be purged and filled with ry nitrogen gas.“ The unit shall Add Paragraph 4.6.6.1 as follows: “4.6.6.1 Sealing. For Periscope equipped with purging valve. The nitrogen gas used for this test shall conform to Federal Specification BB-N-411, Type 1, Grade B,

4、 Class 1. Prior to performing the sealing test, the internal atmosphere of the Unit shall be tested utilizing the internal pressure testing apparatus of Drawing F8565556 together with a ew point tester. Attach the internal pressure testing apparatus to one purging port and the dew point tester to th

5、e other purging port. Apply an internal pressure of 1.0 to 2.0 psig (.O7 to -14 kg/cm2) of nitrogen gas to the periscope assembly while simultaneously capturing the initial exhaust of gas. exhausted gas from the unit shall conform to the requirements of 3.6.1, as measured with the dewpoint tester. S

6、ubsequent to this test, the sealing test of the unit shall be performed. The internal pressurizing to test the sealing of the unit shall be performed using the special testing equipment conforming to Drawing F8565556. The unit shall be pressurized to the re.quirements of 3.6.1 in The dew point of th

7、e initial amount of the FSC 1330 1 of 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I NIL-P-48566 4Jh.R) AMENDMENT 1 accordance with the internal pressure -test procedure delineated on Sheets 1 of 2 of Drawing F8565556. The pressure shall be reta

8、ined for the time period specified. Any evidence of leakage at the end of the minimum time period shall not exceed the tolerance specified in 3.6.P, .as measured on the -monitoring pressure gages of the testing equipment. Should leakage of the wit exceed the tolerance specified in 3.6.1, the unit sh

9、all be considered defective and shall be rejected. A record of beginning and sndiiyg 1ocal.atmospheric pressure and temperature shall be kept. Corrections torthe gage reading shall be made based upon any changes in these variables. Temperature changes shall be measured to an .accuracy of -+ - Oa5OF,

10、 pressure changes to 2 0.2“ Hg. NOTE: will produce an increase of 0.04 psi in the gage reading. increase of 0.1“ Hg of atmospheric pressure will produce a decrease of 0.05.psi in the gage reading.“ An increase of POF in the internal temperature of the unit An Custodian: Army-AR Preparing activity: I Army-AR .Project 13 30-A1 14 ) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1