ARMY MIL-P-48648 (2)-1991 PROJECTILE 155MM TEST NON-HAZARDOUS M718A1 M741A1 TYPES LOADING ASSEMBLING AND PACKING《M718A1 M741A1型155 mm无害试验弹的装药 组装和包装》.pdf

上传人:sumcourage256 文档编号:446416 上传时间:2018-11-16 格式:PDF 页数:2 大小:83.85KB
下载 相关 举报
ARMY MIL-P-48648 (2)-1991 PROJECTILE 155MM TEST NON-HAZARDOUS M718A1 M741A1 TYPES LOADING ASSEMBLING AND PACKING《M718A1 M741A1型155 mm无害试验弹的装药 组装和包装》.pdf_第1页
第1页 / 共2页
ARMY MIL-P-48648 (2)-1991 PROJECTILE 155MM TEST NON-HAZARDOUS M718A1 M741A1 TYPES LOADING ASSEMBLING AND PACKING《M718A1 M741A1型155 mm无害试验弹的装药 组装和包装》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-P-48648 (AR) AMENDMENT 2 27 July 1991 SUPERSEDING AMENDMENT 1 14 November 1988 MILITAGY SPECIFICATION PROJECTILE, 155MM, TEST, NON-HAZARDOUS, M718Al/M741Al TYPES LOADING, ASSEMBLING AND PACKING OF This Amendment forms a part of Military Specification MIL-P-48648 (AR), dated 31 July 1986, and is

2、approved for use within the U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 12 4.4.2.3: Under Drawing Number, delete “11786213-1, -2 and substitute “1176239“. * -4.4.2.3: Under Drawing Number, delete “117

3、6239“ and substitute “11786239“. PAGE 22 * 4.4.2.11, Major 104: Change “Sealant“ to Sealing Compound. PAGE 23 * 4.4.2.12: Major 102: Change “Gage“ to “Gage/4.5.7“ under PARAGRAPH REFERENCE/INSPECTION METHOD and add “100%“ under AQL. Add Minor defect 202 as follows: 202 Sealant not present between pr

4、ojectile body and base (360) 0.65% 3.2 Visual. 1 of 2 SC 1320 AKSC NIA D:STkBUilO STATENENT A. Approved for public release; distribution is un; ;-:CU. e .- .- .- .- _.- _-.- _- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48648 (AR) AMENDMEN

5、T 2 PAGE 34 Add the following paragraph: “4.5.6 Shorting bar resistance. The resistance of each shorting bar circuit shall be measured between test points TP2 and E3, using an approved ohmmeter. Observation shall be made for compliance with the requirements of paragraph 3.12.“ * Add new paragrph: “4

6、.5.7 Inspect of gap between projectile body and base. Gap shall be inspected using an approved feeler gage as specified on drawing 9215220. The feeler gage shall be cleaned with a clean dry rag immediately after each inspection such that the gage is free of any base/body gap sealant. No solvent or o

7、ther substance other than a clean dry rag shall be used to clean the gage. the projectile body and base shall be inspected within fifteen (15) minutes aftei: the sealant is applied to the shoulder of the base.“ The gap between The margins of this amendment are marked with an asterisk or vertical bin

8、e to indicate where changes (additions, modifications, corrections, deletions) from the previous amendment were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the

9、requirements of this document based on the entire content irrespectrive of the marginal notations and relationship to the last previous amendment. Custodian Preparing activity: Army-AR Army-AR (Project 1320-A54) 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1