ARMY MIL-P-48850-1975 PIN AND LANYARD ASSEMBLY《击针和拉火绳组件》.pdf

上传人:孙刚 文档编号:446445 上传时间:2018-11-16 格式:PDF 页数:6 大小:224.19KB
下载 相关 举报
ARMY MIL-P-48850-1975 PIN AND LANYARD ASSEMBLY《击针和拉火绳组件》.pdf_第1页
第1页 / 共6页
ARMY MIL-P-48850-1975 PIN AND LANYARD ASSEMBLY《击针和拉火绳组件》.pdf_第2页
第2页 / 共6页
ARMY MIL-P-48850-1975 PIN AND LANYARD ASSEMBLY《击针和拉火绳组件》.pdf_第3页
第3页 / 共6页
ARMY MIL-P-48850-1975 PIN AND LANYARD ASSEMBLY《击针和拉火绳组件》.pdf_第4页
第4页 / 共6页
ARMY MIL-P-48850-1975 PIN AND LANYARD ASSEMBLY《击针和拉火绳组件》.pdf_第5页
第5页 / 共6页
亲,该文档总共6页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、for for Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48850 13 E 777770b 0324b97 E I - MIL-P-48850 (PA) (Copies of specifications, standards, and drawings required by suppliers in connection with specific procurement functions should be obtai

2、ned from the procuring activity or as directed by the Contracting Officer) o 3. REQUIREMENTS 3.1 Material. - Materials shall be in accordance with the applicable drawings and specifications. 3.2 Assembly, - The assembly shall comply with all requirements specified on Drawing (dwg. ) 9287745 and all

3、associated drawings and with all requirements specified in applicable specifications. 3.3 Workmanshi . - All parts and assemblies shall be fabricatedded in a thorough workmanlike manner. They shall be free of burrs, chips, sharp edges, cracks, unblended radii, surface defects, dirt, grease, rust, co

4、r- rosion products, and other foreign matter. The cleaning agent or method used shall not be injurious to any part, nor shall the part be contaminated by the cleaning agents. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for insqction and standard quality assurance provisions. - Unless oL erwse

5、 specirieu herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification of inspection, - The following type of inspection shall be conducted on this item: a, First Article Inspection bo Quality Conformance Inspection

6、 I 4,3 First article inspection ! 4.3.1 Submission. - The contractor shall submit a first article sample (Sect 6.2b) as designated by the Contracting Officer. The first article sample shall consist of ten (10) complete sets of parts and ten (10) assemblies. The first article shall be evaluated in ac

7、cordance with the provisions of 4.3.2 and 4,3.3. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48850 (PA) 40302 Inspections to be performed. - See MIL-A-48078 and paragraph 4.4.,2.-1, testing per paragraph 4.4.3. 4.303 Rejection. - (See MIL

8、-A-48078). 4.4 Quality conformance inspection 4.4,i Inspection lot formation. - Inspection lots shall comply with the lot formation provisions of MIL-A-48078. 4.4.2 Examination. - (See MIL-A-48078) Unless otherwise specified in the classification of defects and test tables, sampling plans for major

9、and minor defects shall be in accord- ance with MIL-STD-105, Inspection Level II, Equipment necessary for the performance of the inspections listed shall be in accord- ance with 4.4.4. .3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-J MIL-P-48850

10、13 79999Ob 0324679 b 4.4.3 Testing MIL-P-48850 (PA:)- 4.4.3011 Lanyard Assembly Pull Test. (See dwg, 9287745) - Major A dePect. - Ten (10) assemblies shall be randomly selected from each lot and tested for the specified requirement-in accordance with 4,5.1. The lot shall be rejected if one (1) or mo

11、re assemblies are classed defective (Destructive Test) . 4.4.3.2 Spindle Hardness Test, (See dwg, 9287745) - Major A defect. - Ten (10) spindles shall be randomly selected from each heat treat lot and tested for the specified require- ment in accordance wikh 4.5.2. one (1) or more samples are classe

12、d defective (Non-destructive Test). The lot shall be rejected if 4.4.3.3 Sprinp, Spring Rate Test. (See Dwg. 9287745) - Major B defect. - Ten (10) springs-shall be randomly selected from each heat treat lot and tested for the specified require- ments in accordance with 4.5.3. The lot shall be reject

13、ed if one (1) or more samples are classed defective (Non-destructive Test). 4.4.4 Inspection equipment o - The inspection equipment , required to perform the mspectfons and tests prescribed in this specification is identified in the Paragraph Reference/ Inspection Method column in the tables startin

14、g with 4.4.201, I and the test method paragraphs (see 4.5). The contractor shall submit for approval, inspection equipment designs in accordance with the terms of the contract. See Section 6 of MIL-A-48078,- and section 6.3 herein. 4.5 Test method and procedures L)! 4,s.i Lanyard Assembly Pull Test,

15、 - The pin assembly shall be secured in a Government approved test fixture and theforce shall be applied in the direction shown on the applicable drawing. application rate specified. with all of the specified requirements shall be classed defective. The force shall also be applied using the Any asse

16、mbly that fails to comply I 4.5.2 Findle Hardness Test. - The spindle shall be tested for t e specified hardness requirement at 3 eaually spaced points along the spindle axis using Government approved test equipment and procedures. with all of the specified requirements shall be classed defective. A

17、ny spindle failing to comply Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.5.3 Spring, Spring Rate Test, - The spring shall be loaded with the specLfied loas anU the heights shall be measured at each load. all of the specified requirements shall

18、be classed defective. Any spring failing to comply with 5. PREPARATION POR DELIVERY 5.1 Preservation and Packaging 5.1.1 Level C. - The pin and lanyard assemblies shall be packaged in accordance with MILnSTD-116g . 5.2 Packing 5.2al Level C. - The pin and lanyard assemblies shall be packed fol? am i

19、n accordance with MIL-STD-1169. 5.4 Shi in - When assemblies of more than one lot are shippe&%r, each lot shall be kept separate and the division between lots clearly indicated to prevent mixing of lots in transit. 6. .NOTES - 6,i Intended use, - The components and assemblies covered by this specifi

20、cation are intenaed for use with %he Dispenser, Bomb SUU-l3D/A0 6.2 Ordering data. - See MIL-A-48078. 6.3 Submission of inspection equipment des3.gns for roval. - See MIL-A-48078. Submit equipment designs as to Commander: Picatinny Arsenal, ATTN: SARPA-QA- T-T, Dover, New Jersey 07801, Custodian : A

21、rmy-PA Project Number: 1345-A-i28 Pregaring Activity: Army-PA 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-T m alal al 3 mcn o, v) mm m VI cn c c I Q VI O 2 YI .- _- _c_ 7 6 -U S GOVERNMENT PRINTING OFFICE 1975-M)3-766:2139 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1