ARMY MIL-P-51338-1969 PROJECTILE 105MM SMOKE WP M60E1 FILLING ASSEMBLY《M60E1式105 mm白磷烟幕弹(WP)用装填组件》.pdf

上传人:outsidejudge265 文档编号:446533 上传时间:2018-11-16 格式:PDF 页数:6 大小:210.05KB
下载 相关 举报
ARMY MIL-P-51338-1969 PROJECTILE 105MM SMOKE WP M60E1 FILLING ASSEMBLY《M60E1式105 mm白磷烟幕弹(WP)用装填组件》.pdf_第1页
第1页 / 共6页
ARMY MIL-P-51338-1969 PROJECTILE 105MM SMOKE WP M60E1 FILLING ASSEMBLY《M60E1式105 mm白磷烟幕弹(WP)用装填组件》.pdf_第2页
第2页 / 共6页
ARMY MIL-P-51338-1969 PROJECTILE 105MM SMOKE WP M60E1 FILLING ASSEMBLY《M60E1式105 mm白磷烟幕弹(WP)用装填组件》.pdf_第3页
第3页 / 共6页
ARMY MIL-P-51338-1969 PROJECTILE 105MM SMOKE WP M60E1 FILLING ASSEMBLY《M60E1式105 mm白磷烟幕弹(WP)用装填组件》.pdf_第4页
第4页 / 共6页
ARMY MIL-P-51338-1969 PROJECTILE 105MM SMOKE WP M60E1 FILLING ASSEMBLY《M60E1式105 mm白磷烟幕弹(WP)用装填组件》.pdf_第5页
第5页 / 共6页
亲,该文档总共6页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、-,-a- - - MIL-P-51338 13 777770b 0333753 7 FILLING ASSEMBLY 1. SCOPE 1 . 1 This specification covers the filling assembly with WPr of the 105MM, M60El projectile without fuzing components. 2. AFPLICABLE DOCUMENTS 2.1 Government documents. The following documents of the issue in effect on date of inv

2、itation fa bids or request for OpI, farm a part of this specification to the extent specified herein. SPECIF KATIONS M IL ITARY MIL-C-215 - Chemical Agent, White Phospharus (WP). STAN DARDS M iL ITARY MIL-STD-105 - Sampling Rocedures and Tables for Inspection by Attributes. DRAW IN GS US ARMY MUNITI

3、ONS COMMAND F9225939 DL8837835 - Pallet for Prolectile Metul Parts. DL8861520 - Marking Diagram for Pallets for Projectile 75MM to 120MM. - Profecttle, 105MM; Smoke, WP, MOEI, Filling Assembly. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(Copies

4、of specifications, standards, drawings, and publications required by suppl ers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 3. REQUIREMENTS 3 . 1 Materials and components. 3.1.1 Materials. All materials c

5、ited on Drawing F9225939 or on the subsidiary drawingszform to the specifications listed thereon, or to the specific characteristics set forth on the drawings. 3.1.2 Components. All components of the projectile shall conform to the specifi- cations and drawings listed on Drawing F9225939 and subsidi

6、ary drawings. 3,2 Filling and assembly. 3.2,l Filling. The projectile, clean and free of foreign matter, shall be filled with molten WP conforming to MIL-C-215 (see 6.2 and 6.3). When water is in contact with the WP during the fijling operation, the water shall be buffered by a suitable alkaline sal

7、t to maintain a pH value between 6.5 and 8.0. After test for leakage, the WP shall be solidified with the projectile in a vertical nose-up position. 3.2.2 Filling height. There shall be a 7 to 12 percent void, by total volume, existing above the surface of the water over the WP in the filled and clo

8、sed projectile. The depth of water remaining in the filled and closed projectile shall not exceed 1/4 inch. The projectile shall be radiographed in a vertical, nose-up position while the temperature of tile WP is 130 -I- 10.F when tested in accordance with 4.2.4.1 to determine filling height and sea

9、ting of the burster casing (see 6.3). 3.2.3 Assembly . The projectile skll be assembled in accordance with Drawing F9225939 except that the assembly shall not include the following: burster charge assembly, fuze well cup and pad. 3.3 Cleaning after closing. The exterior surface of the filled and clo

10、sed projectile, fuze threads and the interior of the burster casing shall be cleaned thoroughly to remove all grease, oil, and WP contamination. (See 6.4) 3.4 Leakage. When tested in accordance with 4.2.4.2, the closed and cleaned proiectm not leak when maintained at a temperature of 160 + 5F for a

11、period of 8 hours. Alternate method: The projectile shall not leak when maTntained at a tempera- ture of 207 to 212OF for a minimum period of 15 minutes. . ._. . r. o - #- , 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- . -Cu_ MIL-P-51338 13 E 7

12、777906 0333755 2 m MIL-P=51338(MU) 3.5 Workmanship. The projectile shall be free of all foreign matter (oil, grease, contamination) anddarnage such as dents, cracks, and deformation which could affect its intended use. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. 4,l . 1 Suppli

13、ers responsibllity. Unless otherwise specffied in the contract OT purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities of any commercial laboratory acceptable to

14、the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to pescribed requirements. 4,1.2 Objective evidence. The supplier shall provide objective evidence ac

15、cept- able to the contracting officer that the requirernenk of 3.1 and section 5 for which specific inspection has not been provided in this specification have been satisfied. 4.2 Qualitv conformance inspection. 4.2.1 Lotting. A lot shall consist of projectiles, of one interfix number, from one munu

16、facturer, filled by the same filling installation, undsr essentially the same conditions. However, no more than one interfix lot of burster casings from one manufacturer shall be represented in any one interfix lot of filled projectiles. 4.2.2 Sampling. Sampling for examination and nondestructive te

17、sts shall be conducted in accordance with MIL-STD-105. 4.2.3 Inspection procedure. 4.2.3.1 For examination and nondestructive test. Sample projectiles shallbe examined and tested in accordance with the classification of defects and MIL- STD-105 . 4.2.3.2 For critical defects. Each projectile shall b

18、e inspected for the critical characteristics listed in the classification of defects. - 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-51338 13 777770b 0333756 4 M f M I L-P-5 1338(MU) 4.2.3.3 Classification of defects. (a) Projectile, 105MM

19、: smoke, WP, M60E1, filling assembly (Dwg F92ZB9) . Cat eg or i es Cri ti cal : 1 2 Major: 1 o1 1 02 1 03 104 1 05 106 107 108 109 Minor: 2Q1 202 203 - Defects Leakage WP contamination AQL 1 .O percent defective Burster casing not seated Threads damaged or contaminated Bourrelet diameter (maximum) a

20、fter protective finish Fil I ing excessive Filling insufficient Excess water Marking incorrect Protective finish missing Workmanship (3.5) AQL 2.5 percwt defective Rotating hnd damaged Marking missing or illegible Threads not coated (b) Preparation for delivery (section 5). Cutegories Defects Cri ti

21、 cal : None defined Major: AQL 4.0 percent defective 1 o1 Pallets Incorrect 102 Proteclve olatrvas mirrlng 1 o3 SitnppIii!.I loom VI mlrrlnu 104 MarklnrJ Illegllde w Iticturact Acceptunce standards 4.2.4.2 4.2.4.1 4.2.4.1 4.2.4.1 4,2.4.1 Provided by IHSNot for ResaleNo reproduction or networking per

22、mitted without license from IHS-,-,-MIL-P-5L338 13 = 9779906 0333757 b M I. M I L-P-5 1 338(MU) 4.2.4 Tests. - 4.2.4.1 Filling height. The projectile shall be radiographed while the WP is molten as specified, and the projectile stored in a vertical nose-up position. 4.2,4.2 Leakage. The projectile s

23、hall be placed in an Men in a vertical, filling-end-down position (for the ulternate method fi Iling-ed-up position) and maintained at the specified temperature for the required period of time. When testing at 27 to 212*F, the projectile shall be measured by thermocouples inserted in the burster we1

24、 Is of ai least two projectiles located in the center of each oven bay batch. The emission of smoke constitutes leakage. 5. PREPARATION FOR DELIVERY 5.1 Packing, level A. The filled and closed projectile shall be packed in accordance with Drawing F8837835. . 5.2 Marking. In addition to any special m

25、arking required by the contract or order,shipping contuiners shall be marked in accordance with Drawing C8861520. 6. NOTES 6.1 Ordering data. Rocurement documents should specify the title, number, and date of this specification. 6.2 Caution, Because of the hazardous nature of WP operations, filling

26、installa- tions aTe6a;sed to tuke all necessary precautions required by proper industrial hygiene and safety practices to protect personnel from inlury while filllng projectiles in accordance with this specification. 6.3 Filling aid. Projectiles filled with approximately 3.9 -t 0.3 pounds of WP have

27、 been found to comply with 3.2.2. This information is furnished as an aid to procurement and not as a criterion for filling. The void space above the water over the WP may be either air or inert gas. 6.4 Decontamination. The projectiles have been decontaminated by hot water and detergent In combinat

28、ion with steam lances and wid brushes. This information is furnished QS an aid to production and not as a filling line design criteria. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-51338 13 797770b 0333758 8 .c 6.5 Supersession data. This s

29、pecification supersedes Edgewood Arsenal Purchase Description 196-131 -892(1)t dated 13 August 1968. Custodian: Army - MU . User activities: Navy - OS Air Force - 70 . . . - -P 6 Reparing activity: Army -MU(EA) Project No. 1315A751 I rj c- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1