ARMY MIL-P-60025-1964 PRIMER STAB M97 PARTS FOR《M97式针刺火帽用零件》.pdf

上传人:roleaisle130 文档编号:446593 上传时间:2018-11-16 格式:PDF 页数:7 大小:432.73KB
下载 相关 举报
ARMY MIL-P-60025-1964 PRIMER STAB M97 PARTS FOR《M97式针刺火帽用零件》.pdf_第1页
第1页 / 共7页
ARMY MIL-P-60025-1964 PRIMER STAB M97 PARTS FOR《M97式针刺火帽用零件》.pdf_第2页
第2页 / 共7页
ARMY MIL-P-60025-1964 PRIMER STAB M97 PARTS FOR《M97式针刺火帽用零件》.pdf_第3页
第3页 / 共7页
ARMY MIL-P-60025-1964 PRIMER STAB M97 PARTS FOR《M97式针刺火帽用零件》.pdf_第4页
第4页 / 共7页
ARMY MIL-P-60025-1964 PRIMER STAB M97 PARTS FOR《M97式针刺火帽用零件》.pdf_第5页
第5页 / 共7页
亲,该文档总共7页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MILP-60025 (MU) 10 APRIL 1964 MILITARY SPECIFICATION PRIMER, STAB, M97 PARTS FOR 1. SCOPE 1.1 This specification covers the parts for one type of Primer designated as Primer, Stab, M97. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or reque

2、st for proposal form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2560 - Ammunition and Spe- cid Weapons ; Gen- e r a 1 Specification for MIGP-10025 - Packaging, Packing and Marking for Interplant S h i p - ment of Inert Am- munition Compo- .ne n t s, Ge

3、n e r a I Specification for MILI45208 - Inspection Require- General m e n t s , Specification for MIL-1-45607 - Inspection E q u i p - ment, Supply and Maintenance of 2 STANDARDS MILITARY MIL-STD- 106D . - Sampling Procedures and Tables for In- spection by Attri- butes MIL-STD-109 - Quality Assuranc

4、e Terms and Defini- tions MIL-STD- 1235 - Single and Multilevel Continuous Sam- pling Procedures and Tables for In- spection by Attri- butes DRAWINGS ORDNANCE CORPS 8857267 - CUP 8857268 - Disc, closing PUBLICATIONS ORDNANCE CORPS IEL-8789928 - Index of Inspection Equipment Lists. I 1 . Provided by

5、IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b -_- MIL-P-bo025 13 777770b 0339750 5 MIIFP-60025 (MU) (Copies of specifications, standards, drawings and - publications required by suppliers in connection with specific procurement functions should be ob- tained

6、 from the procuring activity or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 Material. Materials shall be in ac- cordance with applicable drawings and specifications. 32 Parts. The parts shall comply with all requirements specified on Drawing (dwgs.) 8867267 and 8857268 as applicable

7、, and with all requirements specified in ap- plicable specifications. . ._ , 3.3 Workmanship. All parts shall be fab- ricated and finished in a thorough, work- manlike manner. They shall be clean and free of burrs, sharp edges, unblended radii, surface defects, chips, dirt, grease, corrosion product

8、s. and other foreign matter. The cleaning method used shall not be injurious to any parts nor shall the parts be contami- nated by the cleaning agent. All required markings shall be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS. 4.1 General quality assurance provisions. Unless otherwise

9、specified in the contract or purchase order, the supplier is responsible for the performance of all inspection re- quirements specified herein. Except as oth- erwise specified, the supplier may utilize his own or any other inspection facilities and services acceptable to the Government. In- spection

10、 records of the examinations and tests shall be kept complete and available to the Government as specified in the con- tract or order. The Government reserves the right to perform any of the inspections set forth in the specification where such in- spections are deemed necessfry to assure that suppl

11、ies and services conform to pre- scribed requirements. Reference shall be made to Standard MIGSTD-109 iii order 2 - to define terms used herein. The provisions of Specification MIL-A-2560 shall apply. 4.1.1 Ctmtractor quaitg assurance sustem. The contractor shall provide and maintain an effective qu

12、ality assurance system in compliance with the requirements of Speci- , fication MIL-1-46208. The contractors qual- ity assurance system shall contain a pro- cedure for the reporting of critical defec- tives found during the course of his in- spection and during inspection by the Gov- ernment. Any cr

13、itical defect encountered, unless annotated by an asterisk (*) to the right of the characteristic code number (see 6.2), will be reported within 48 hours, A monthly summary report covering those critical defects annotated by an asterisk will be furnished. The agencies to whom the reports will be fur

14、nished are identified in paragraph 6.6. The reports shall contain, as a minimum, the following information: (a) Contractor and contract number. (b) Number and revision date of spec- ification. (c) Characteristic code number. (d) Lot or serial number. (e) Number of defectives found. (f) Assignable ca

15、use or analysis of occurrence. (g) Corrective action taken or recom- mended. When the corrective action is beyond the control of the contractor or the scope of the contract, the report shall contain the con- tractors recommendation to the Govern- ment. 4.1.2 Submission of product. At the time the co

16、mpleted lot of product is submitted to the Government for acceptance the contrac- tor shall supply the following information accompanied by a certificate which attests i I 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-60025 13 m 7779706 03

17、34751 7 MIbP-60025 (MU) that the information provided is correct and applicable to the product being sub- mitted : (a) A statement that the lot complies with all quality assurance pro- visions of the approved current written description of the sys- tem. (b) Number of units of product in- spected. (c

18、) Results obtained for all inspection performed. (d) Drawing, specification number and date, together with an identifica- tion and date of changes. (e) Certificates of compliance on all material purchased by the con- tractor when such material is controlled by Government speci- fications referenced

19、in any of the contractual documents. (f) Number of items in the lot. (8) Date submitted. The certificate shall be signed by a respon- sible agent of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents au- thority to bind his principal. Subs

20、tantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization, 4.1.3 Government verification. Using the contractors written quality assurance pro- cedure, this d

21、etail specification, the appli- : cable drawings and other contractual docu- ments as a guide, the Government inspector * shall verify at unscheduled intervals all quality assurance operations performed by the contractor. Verification will be in ac- cordance with Specification MIL-1-45208 l - - y an

22、d will be performed to the extent neces- sary to assure compliance with the contrac- tual requirements. Severity of Government inspection of individual characteristics will be directly related to the seriousness of the classification assigned, In no instance will a characteristic classified “critica

23、l” be ac- cepted solely on the basis of the contractors records. 4.2 Initial production inspection. 4.2.1 Prior to the start of regular produc- tion, the contractor shall submit an initial production sample to a Government-ap- proved facility as designated by the con- tracting officer (see 6.4) for

24、evaluation in accordance with the provisions of 4.2.2. The initiai production sample shall consist of 25 complete sets of parts which have been pro- duced by the contractor or furnished by a supplier and which have been manufactured using the same production processes, pro- cedures and requirement w

25、hich will be used in fulfilling the contract. All parts and ma- terials, including packaging and packing, shall be obtained from the same sources of supply as will be used in regular production. The sample shall be accompanied by certifi- cates of analysis for materials. An initial production sample

26、, or portion thereof, as di- rected by the contracting officer, shall also be submitted whenever there is a lapse in productioii for a period in excess of 90 days, or whenever a change occurs in manufac- turing process, material used, drawing, specification or source of supply as to Sig- nificantly

27、affect product uniformity a5 deter- mined by the Government. Prior to sub- mission, the contractor shall inspect the sample to the degree necessary to assure that it conforms to the requirements of the contract and submit a record of this in- spection with the sample. A sample con- taining known def

28、ects will not be submitted unless specifically authorized by the con- tracting officer. 4.22 Impections to be performed. Com- ponents will be subjected by the Govern- ment to any or all of the examinations spe- 3 -_ I f - -1 I Provided by IHSNot for ResaleNo reproduction or networking permitted with

29、out license from IHS-,-,-MIL-P-60025 13 = 9997906 033Li952 7 = iMIL-p-60025 (MU) cified in this specification and any or all re- quirements of the applicable drawings. 4.2.3 RejectiG. If any component fails to comply with any or ail of the applicable requirements, the initial production sample shall

30、 be rejected. The Government reserves the right to terminate its inspection upon any failure of a component in the sample to comply with any or ali of the stated require- ments, In the event of rejection, the Gov- ernment reserves the right to require the contractor to take corrective action and sub

31、- mit a new initial production sample or por- tion therof. Until an initial production sample is accepted, the contractor is, in no way, authorized by the Government to in- itiate regular production unless otherwise directed by the contracting officer. 4.3 Inspection provisions. 4.3.1 Lot informathn

32、. A lot shall consist of parts produced by one manufacturer in one unchanged process, in accordance with the same drawing, same drawing revision, 4.3.2.1 Cup (see dwg. 8857267) Oategorirs Defects same specification, and same specification revision. Drawing, specification and procas changes not affec

33、ting safety, performance, or fit, as determined by the Government, shall not necessitate changing the lot inter- fix number, Lots shall be submitted for in- spectioI?. in accordance with Standard MIL- STD-105 or Standard MIL-STD-1236, when applicable. 4.3.2 Examination. Sampling plans and procedures

34、 for the following cIassifications of defects shall be in accordance with Standard MIGSTD-105 except that inspec- tion for critical defects, when listed, shall be 100 percent. Continuous sampling plans in accordance with Standard MIGSTD- 1235 may be used if approved by the pro- curing activity. Also

35、, at the option of the procuring activity, AQLs and sampling plans may be applied to the individual characteristics listed, using ai1 AQL of 0.25 percent for each major defect and an AQL of 0.40 percent for each minor defect. Eqcipment necessary for the performance of the inspections listed shall be

36、 in accord- ance with 4.3.3. Zetkod of inspection Critical : 1. Crack or split ._.n.,._.-M- -_ Visual Major: AQL 0.40 percent 101. Inside diameter, minimum (min) _I_._-I_ _ Gage 102. Outside diameter, maximum, (ma) -.- Gage 103. Thickness through bottom, min. _. ._._.-_._ ._.- Gage 104. Total lengLh

37、, min. - “._.“_._.IC_I .-.- “. . .l.lmlll Gage Minor : AQL 0.40 percent 201. Evidence of poor workmanship (see 3.3) . . -_. Visual 4.3.2.2 Disc, closing (see dwg. 8857268) Oat egoties Defscto Critical: None defined. 4 Code No. (we 64 O1001 * 01002 01003 01004 01005 01006 Method of Code No. inspect“

38、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60025 (MU) Categories Defect8 alilhod of 0086 NO. impsotion Major: AQL 0.26 percent 101. Diameter, max. - Gage 02001 102. Thickness Gage 02002 Minor: AQL 0.40 percent 201. Evidence of poor workman

39、ship (see 3.3) ViSual 02003 4.3.3 Inspection equipment. Index of in- spection equipment number IEL-8789928 identifies the inspection equipment required to perform the examinations and tests pre- scribed in this section. The contractor shall design inspection equipment in accordance with the instruct

40、ions in paragraph 6.3. 4.3.3.1 Govemment rights to documentoc tzon. Inspection equipment drawings and lists provided and revised in accordance with the requirements of the IEL may be used by DOD activities for design, pro- curement, manufacture, testing, evaluation, production and receiving inspecti

41、on, over- haul, shipping, storage, identification of stock, ordering and storage of replacement parts, inspection of items at overhaul, gen- eral maintenance of equipment, construc- tion, suTvey and whenever inspection equip- ment drawings are needed. 4.3.3.2 Supply and mintenccnce. Supply and maint

42、enance of the equipment listed on the IEL shall be in accordance with Speci- fication MIL-1-45607. 4.3,3.3 Government use of contractors in- specton and test equipment. The contrac- tor shall make available to the Government all inspection and test equipment necessary for determining conformance wit

43、h contract requirements. Personnel for operating the equipment, and verification of its accuracy, shall be supplied by the contractor for the performance of examination or test by the Government, 5. PREPARATION FOR DELIVERY f 5.1 Packing and marking. 5.1.1 Level C. The parts shall be packed and mark

44、ed in accordance with Specification MIL-P-10025. 5.2 Data cards. Data cards shall be pre- pared for each lot in accordance with the informat.ion specified in Specification MIL- A-2550. 6, NOTES 6.1 Ordering data. Procurement docu- menta shall specify the following: Title, number and date of this spe

45、cifi- cation. 6.2 Inspection code numbers. The five digit code numbers assigned to the inspec- tions herein are to facilitate future data collection and andysis by the Government. 6.3 Inspection equipment. The contrac- tor shall design inspection equipment as re- quired by the referenced Inspection

46、Equip- ment Lists (IEL) in accordance with the instructions of 6.3.1 through 6.3.7. a 6.3.1 Inspection Equipment Lists. In- spection Equipment Lists indicate the avail- ability of inspection equipment designs by showing in the “number“ column of the list of inspection equipment (O0 Form 1242-3) the

47、numbers of drawings of existing equip- ment designs or codes as indicated in 6.3.2. Design action required of the contractor with respect to the different types of draw- 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MILP-60025 (MU) inga that may

48、be listed is described in 6.3.3 and 6.3.4. Action required by the contractor with respect to commercial inspection equip- ment is described in 6.3.5. The contractor will be Tequired to prepare detailed draw- ings in accordance with 6.3.6 for all the equipment coded as “contractor design” in the numb

49、er column. These contractor de- signs must be approved by the Government prior to fabrication or procuring of the equipment. Designs shall be submitted for approval as specified in 6.3.7. 6.8.2 Inspection Equipment Iht codes. The inspection equipment as defined in 6.3.3, 6.3.4, 6.3.6, and 6.3.6 will be designated in the Inspection Equipment List by the fol- lowing codes: CDOF - Contractors design re- sponsibility on Ord- nance -format; ORDM- 608-12.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1