1、MIL-P-60053 AMENDMENT 1 21 September 1966 MILITARY SPECIFICATION PRIMER, PERCUSSION, M1A2 LOADING, ASSEMBLING AND PACKING This Amendment forma a part of Military Specifi- cation MIL-P-6005S (MU), 11 September 1964. (MI!) Paragraph 2.1, SPECIFICATIONS, MILI- TARY: Delete reference to MIGI-45208. Para
2、graph 2.1, STANDARDS, MILI- TARY : Add “MILSTD-1168 - Lot Num- bering of Ammunition.” Paragraph 4.1.1 : Delete in its entirety. Paragraph 4.2.1 : Delete this paragraph in its entirety and substitute : 4.2.1 Lot formation. The term lot as used throughout this specification refers to an inspection lot
3、, which is defined as an es- sentially homogeneous collection of units of product from which a representative sample is drawn and inspected to determine con- formance of the lot with applicable require- ments. The sample selected shall represent only that quantity of units from which the sample was
4、drawn and shall not be construed to represent any prior or subsequent quanti- ties presented for inspection. Homogeneity shall be considered to exist provided the lot has been produced by one manufacturer, in one unchanged process, in accordance with the same drawing, same drawing revision, same spe
5、cification and same specification re- vision. Changes to the process, specification or drawing not affecting safety, perform- ance, interchangeability, or storage, as deter- mined by the Government, shall not be deemed .to alter the homogeneity of the lot. Inspection lots shall comply with MIL-STD-
6、105 and shall be numbered in accordance with MIGSTD-1168. Unless otherwise ap- proved by the contracting officer, the inspec- tion lot size of end items deliverable under the contract shall be not less than the smallest weekly estimate of quantities contractually Cuetodim: scheduled for production d
7、uring the contract period nor more than the largest monthly quantity contractually scheduled for delivery during the contract period. Inspection lots for components or subassemblies, other than the items of delivery, shall be homogeneous and of a size mutually convenient to both the contractor and t
8、he Government inspector, Each lot shall contain- (a) Metal parts of one lot interfix num- ber from one manufacturer. (b) Black powder of one lot number from one manufacturer. (c) Percussion primers of one lot inter- fix number from one manufac- turer.” Paragraph 6.3.7: Delete and substitute: “6.3.7
9、SubrnZsszon of contractor designs. Unless otherwise specified on the EL, all de- signs of equipment for inspection of defects classified as critical and major shall be sub- mitted for approval to the Commanding Offi- cer Picatinny Arsenal, ATTN : SMUPA-ND. All other designs of inspection equipment s
10、hall be approved by the inspection element of the agency administering the contract: submission shall be as directed by the con- tracting officer. Partial submission of inspec- tion equipment designs is permissible and encouraged. However, the Arsenal comple- tion date for design review will be base
11、d on the date of the final submission of designs. Picatinny Arsenal design review will be ac- complished normally within one month after receipt.” Paragraph 6.6, 6.6.1 and 6.6.2: Delete , these paragraphs in their entirety. FSC 1390 7 .o * U. S. GOVERNMENT PRINTING OFFICE: 251071-10l7Xlll) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-