ARMY MIL-P-60321-1965 PRIMER STAB T103E1 LOADING ASSEMBLING AND PACKING《T103E1针刺引物的填装 组装和包装》.pdf

上传人:figureissue185 文档编号:446631 上传时间:2018-11-16 格式:PDF 页数:11 大小:667.68KB
下载 相关 举报
ARMY MIL-P-60321-1965 PRIMER STAB T103E1 LOADING ASSEMBLING AND PACKING《T103E1针刺引物的填装 组装和包装》.pdf_第1页
第1页 / 共11页
ARMY MIL-P-60321-1965 PRIMER STAB T103E1 LOADING ASSEMBLING AND PACKING《T103E1针刺引物的填装 组装和包装》.pdf_第2页
第2页 / 共11页
ARMY MIL-P-60321-1965 PRIMER STAB T103E1 LOADING ASSEMBLING AND PACKING《T103E1针刺引物的填装 组装和包装》.pdf_第3页
第3页 / 共11页
ARMY MIL-P-60321-1965 PRIMER STAB T103E1 LOADING ASSEMBLING AND PACKING《T103E1针刺引物的填装 组装和包装》.pdf_第4页
第4页 / 共11页
ARMY MIL-P-60321-1965 PRIMER STAB T103E1 LOADING ASSEMBLING AND PACKING《T103E1针刺引物的填装 组装和包装》.pdf_第5页
第5页 / 共11页
亲,该文档总共11页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、I -. I MIL-P-bo321 13 9799906 0337636 3 = -_ - - MIL-P-60321 (MU) 1 MARCH 1965 MILITARY SPECIFICATION LOADING, ASSEMBLING AND PACKING 1. SCOPE 1.1 This specification covers the loading, assembling and packing for one type of stab primer designated as Primer, Stab T103E1. 2. APPLICABLE DOCUMENTS 2.1

2、The following documents of the issue in effect on date of invitation for bids or request for proposai, form a part of the spe- cification to the extent specified herein. SPECIFICATIONS MILITARY MIEP-116 - Preservation, Method of. MIL-A-2660 - Ammunition and Spe- cial Weapons; Gen- e r a i Specificat

3、ion for, MILI46607 -Inspection Equip- ment, Supply and Maintenance of. STANDARDS MILITARY MIESTD-106 - Sampling . Procedures and Table for In- spection by Attrib- utes (ABC-STD- 106). MIESTD-109 - Quality A s s u r a n c e Terms and Delhi- tions. MILSTD-660 - Explosives : Sam- pling, Inspection and

4、Testing. MILSTD-1236 - Single and Multilevel Continuous Sam- pling Procedures and Tables for In- spection by Attrib- utes. DRAWINGS ORDNANCE CORPS 7648103 - Box, Set-up, Packing, Ammunition, Outer for Small Explosive Components. 7648104 - Box, Set-up, Packing, Ammunition, Inner for Small Explosive C

5、omponents. 7648118 -Box, Packing, Am- munition, for Prim- er, Stab. 8787068 - Primer, Stab. T103E1 Assembly. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-b0321 13 M 999970b MIL.P-60321 (MU) PUBLICATIONS ORDNANCE CORPS IEL8787058 - Index of

6、Inspection Equipment Lists. (Copies of specifications, standards, drawings and publications required by contractors in connection with specific prbcurement functions should be ob- tained from the procuring activity or as directed by the contracting officer.) 3, REQUIREMENTS 3.1 Material. Materials s

7、hall be in accord- ance with applicable drawings and specifica- tions. . 3.2 Primer. The primers shall comply with all requirements specified on Drawing (dwg.) 8787068 and with all requirements specified in applicable specifications. . 3.3 Moisture content of primer mixture. The moisture content of

8、the primer mixture ust:d in loading the primers shall not ex- ceed 0.30 percent when tested as specified in 4.3.1, 3.4 Functioning. 3.4.1 Sensitivity. The primers shall func- tion on the first attempt under an applied energy of 11.86 inch ounces, and shall cause an audible report when fired against

9、a stand- ardlead disc, the test shall be as specified in 4.3.3.1. 3.42 Wterproofness. The primers shall be.waterpwf as evidenced by nod func- tioning after being immersed under a mini- mum (min.) of 2 in. of water for a min. of 48 hou dirt, e -e 8- -. - 0337637 5 corrosion products and other foreign

10、 mat- ter, The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. Ex- terior surface coatings shall be continuous except for a few light scratches not ex- posing base material. All required markings shall be neat and sharply defined. 4.

11、 QUALITY ASSURANCE PROVISIONS 4.1 General quality assurance provisions. Unless otherwise specified in the contract. or purchase order, the supplier is responsi- ble for the performance of all inspection re- quirements as specified herein. Except as otherwise specified, the supplier may utilize his o

12、wn facilities or any commercial labora- tory acceptable to the Government. The Gov- ernment reserves the right to perform any of the inspections set forth in the specifica- tion where such inspections are deemed nec- essary to assure supplies and services con- form to prescribed requirements. Refere

13、-me shall be made to Standard MIL-STD-109 in order to define terms used herein, The provi- sions of Specification MILA-2560 shall ap Ply* 4.1.1 Subtnhsion of product. At the time the completed lot of product is submitted to the Government for acceptance the contrac- tor shall supply the following in

14、formation accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: (a) A statement that the lot complies with allof the quality assurance provisions specified within this specification. (b) Number of units of product in- I spe

15、cted. _ (e) Results obtained, by defect code, for all inspections performed. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1 - MIL-P-60321 13 7777906 0337638 7 M MIL-P-60321 (MU) (d) Drawing, specification number and date, together with an identifi

16、ca- tion and date of changes. (e) Statement of findings on the primer mixture and associated ingredi- ents and a certificate of conform- ance on all material purchased by the contractor when such ma- terial is controlled by Govern- ment specification referenced in any of the contractual documents. (

17、f) Number of items in the lot. (g) Date submitted. The certificate shall be signed by a responsi- ble agent of the certifying organization. The initial certificate submitted shall be substan- tiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority M11

18、 not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.1.2 Govenunent verification. Using the contractors written quality assurance pro- cedure, this detail specification, the applica- ble d

19、rawings and other contractual docu- ments as a guide, the Government inspector shall verify at unscheduled intervals all quality assurance operations performed by the contractor. Verification will be performed to the extent necessary to assure compli- ance with the contractual reqliirements. Severit

20、y of Government inspection of in- dividual characteristics will be directly re- lated to the seriousness of the classification assigned. In no instance will a characteristic classifie4 “critical” be accepted solely on the basis of the contractors records . 4.2 Inspection provisions. 4.2.1 Lot fol-ma

21、tion. A lot shall consist of primers produced by one manufacturer in one unchanged process, in accordance with the same drawing, same drawing revision, same specification and same specification re- vision. Drawing, specification, and process changes not affecting safety, performance, or fit, as dete

22、rmined by the Government, shall not necessitate changing the lot inter- fix number. Lots shall be submitted for in- spections in accordance with Standard MIL STD-105 (or Standard MIL-STD-1235 when applicable). Each lot shall contain : . -. (a) Parts bearing the same lot interfix number from one manu

23、facturer. (b) Primer mixture from one batch or blending of batches which results in homogeniety of all primer mixture used in loading the en- tire primer lot. 4.2.2 Examination. Sampling plans and procedures for the following classifications of defects shall be in accordance with Stand- ard MIL-STD-

24、105 except that inspection for critical defects, when listed, shall be 100 percent. Continuous sampling plans in ac- cordance with Standard MILSTD-1235 may be used, for defects other than critical, if aproved by the procuring activity. Also, at the option of the procuring activity, AQLs m-3 tiamplin

25、g plans may be applied to the individual characteristics listed using an AQL of 0.40 percent for each major defect and an AQL of 0.65 percent for each minor defect. Equipment. necessary for the per- formance of the inspections listed shall be in accordance with 4.2.4. .I 4.2.2.1 Assembly, prior to l

26、oading and clos- ing (see dwg. 8787068). 3 . . . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60321 13 7777906 0337b37 7 = MLP-60321 (MU) Cagsootici Defect. Method of inrpectbn Critical: None defined. Major: AQL 0.40 percent 101. Interior co

27、ating incomplete or inadequate . Visual Minor: AQL 0.66 percent 201. Evidence of poor workmanship (see 3.6) Visual 4-36 Assembly (see dwg. 8787068). Dofccte Method of irupection Critical : 1. Cup apit or cracked . Visual Major: AQL 0.40 percent 101. Length, minimum (min.) . Gage 102. Outaide diamete

28、r, maximum (max.) . Gage 103. Identification color missing or incorrect . Visual 104. Not crimped full 360 degrees Visual 105. Lacquer seal incomplete or inadequate Visual Minor: AQL 1.00 percent 201. Disc bulged above top of crimp Visual 202. Evidence of poor workmanship (see 3.6) . Visual 422.3 Bo

29、x, Set-up, inner (see dwg. 7648104). cwwOd68 Cn-3cal: None defined. Defects Major: AQL 0.40 percent 101. BOX damaged Visual 102. Number of primera incorrect Visual Minor : AQL 1.00 percent 201. Marking misleading or nnidenable Visual 202. Any packing material missing Visual 42.2.4 Box, Set-up, outer

30、 (see dwg. 7648103). Code No. (ree 6.2) O1001 01002 Code No. 02001 02002 02003 02004 02006 02006 02007 02008 Code No. 03001 03002 03003 03004 4 = Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Catsgoriu Critical: None defined. Defscb MIL-P=60321 (MU

31、) Method of Code No. inspectia, Major: AQL 0.40 percent 101. Number of inner Set-up boxes incorrect. visua al 04001 102. Sealing strip torn, badly wfinkled,.incomplete or otherwise fails to seal the 04002 . box completely t isual Minor : AQL 1.60 percent 201. Box torn, cut or punctured Visual 04003

32、202. Marking misleading or unidentifiable . Visual 04004 203. Contents move when box is shaken Manual 04005 4.2.2.5 Outer Set-up packing box in barrier bag (when applicable) (see dwg. 7648103) Catcgoncr Critical : None defined. Dsfsck Major: AQL 0.65 percent 101. Barrier bag punctured or torii Visua

33、l 05001 102. Marking missing, misleading or unidentifiable . Visual 06002 103. Barrier bag mal incomplete or improperly positioned ., Visual 06003 Minor: None defined. 45.2.6 Sealed packing box (see dwg. 7648118). c of the crucible shall be wiped dry with tissue paper, and the cru- cible dried in an

34、 oven at 80 degrees plus or minus 1 degree C. for 30 minutes, cooled in a desiccator, and weizhed. Th percentage of ptassium chlorate hhaii be calculated as follows : 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-60321 13 m 4797406 0337643

35、 O m MIL-P-60321 (MU) B X 100 W Potassium chlorate, percent = where : B = Loss in weight of the contents of W = Weight of the sample on a moist- . ure-free basis. the crucible. 4.3.2,Z.l Prepantio?t of solut2on of f er,.?c ammotzmt sulfate. To approximately 120 ml of distilled water in a ?&liter rea

36、gent bottle, 125 rn of ferric ammonium sulfate shall be added. The reagent bottle shall be stoppered, vigorously shaken for several minutes, and then allowed to stand overnight. Portions of the saturated solution shall be filtered be- fore use. 4.3.2.2.2. Procedzwe. A portion of approxi- mately 1 gm

37、 of the sample shall be ac- curately weighed directly into a tared 30 ml sintered glass crucible of medium porosity. A 6.0 mi portion of 1 percent nitric acid shill be added, and the crucible constantly swirled for 1 minute, in order that all the ingredients of the powder except antimony sulfi3e be

38、dissolved. Care shall be taken that none of the liquid be spilled. The mix- ture shall be filtered by applying suction. employing a vacuum flask. The crucible shall be removed from the adapter, and the bot- tom wiped dry with tissue paper. The wash- ing operation shall be repeated, using 6.0 ml of 1

39、 percent nitric acid each time, and the contents swirled for exactly I minute. After a total of 40 mi of 1 percent nitric acid has been used, the crucible shall be removed, and the bottom of it washed with water. The funnel, the funnel adapter, and the vacuum flask shall be washed with water, and th

40、e filtrate and washings discarded. About 1 mi of a saturated solution of ferric am- monium sulfate shall be placed in the flask. The contents of the crucible shall be treated 8 as before with 6.0 ml of 1 percent nitric acid, and filtered by means of suction into the flask. If the liquid in the flask

41、 turns red, due to the presence of the thiocyanate ion in the filtrate, the washing of the contents in the crucible shall be repeated with addi- tional 6.0 mi portions of 1 percent nitric acid, until a negative test for the thiocyanate ion has been affected. (Usually a total of 50 ml shall be suffic

42、ient.) The crucible and contents shall be rinsed with alcohol, and then with ether. The solution shall be as- pirated until the odor of ether can no longer be detected. The crucible and contents shall be dried in an oven at 80 degrees plus or minus 1 degree C. for 30 minutes, cooled in a desiccator,

43、 and weighed. The percentage of antimony sulfide shall be calculated as follows : A x 100 Antimony sulfide, percent = where : A = Weight of residue in the crucible. B = Weight of sample on a moisture- 4.3.2.3 Lead azide. The lead azide content shall be determined using the (Eudiometer) method and ap

44、paratus in MIL-STD-650 Method No. 407.1. free basis. 4.3.2.4 Lead thiocyanate. The percentage of lead thiocyanate in the sample shall be calculated on a moisture free basis by sub- tracting from 100 the sum of the per- centages of potassium chlorate, antimony sulfide, and lead azide, 4.3.3 Fu?tction

45、ing. 4.3.3.1 Sensitivity. The primer shall be as- sembled to the applicable test fixture speci- fied in 4.2.4, so that the firing pin will strike the sensitive end of the primer. A steel ball Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-bO32

46、L 13 7797906 0337644 2 _- r weighing 3.95 ounces maximum shall be dropped on the firing pin to function the primer from a height of 3 inches, maximum. The height of drop shall be measured as the height from the top of the firing pin to the bottom of the ball. A primer that fails to fire with an audi

47、ble report shall be classed defective. 4.3.3.2 Waterproofness. The primer shall he immersed under water maintained be- tween 60 degrees F, and 90 degrees F. at the required depth for the time specified. Within one hour after removal from the water the primer shall be subjected to the sensivity test

48、specified in 4.3.3.1. Any primer which fails to fire with an audible report shall be classed defective. 5. PREPARATION FOR DELIVERY 5.1 Preservation and packaging. 5.1.1 Lese1 C. Packaging shall be as speci- fied on dwg, 7548104. 5.1.2 Intermediate packagifzg. The primers shall be packaged in accord

49、ance with dwg. 7548103. 5.2 Packing 5.2.1 Level C. The containers shall be packed in accordance with dwg. 7648118. 5.3 Marking. Inner, outer and exterior containers shall be marked in accordance with dwgs. 7548103, 7648104 and 7548118. 5.4 Data cards. Data cards shall be pre- pared for each lot in accordance with the information specified in Specification MIL- A-2650, 6. NOTES 6.1 Ordering data, Procurement docu- ments shall specify

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1