1、MIL-P-60938 13 II 999306 03Li2292 O W- .JI 4.-2W)J( MIL-P-60938 (MU) 20 February 1968 MILITARY SPECIFICATION PELLET, SMOKE MARKER FOR CARTRIDGE, 105MM: APERS-T, XM546 1. SCOPE 1.1 This specification covers Pellet, Smoke Marker, 2. APPLICABLE DOCUMENTS 2.1 made for use in Cartridge, 105MM:. APERS-T,
2、XM546. The following documents of the issue in effect on date of invitation for bids or request for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS FEDERAL PPP-B-636 - Boxes, Fiber PPP-F-320 - Fiberboard; Corrugated and Solid, Sheet Stock (Container Grade)
3、, and Cut Shapes PPP-T-45 - Tape, Gummed, Paper, Reinforced UV-T-106 - Tape, Pressure-Sensitive Adhesive, Paper, Draft ing MILITARY MIL-B-117, - Bags, Interior Packaging .MIL-B-2427 - Boxes, Ammunition Packing; Wood, Nailed MIL-C-2439 - Container, Ammunition, Fiber, Spirally Wound MIL-A-2550 - Ammun
4、ition and Special Weapons, General Specification for MIL-1-45607- Inspection Equipment, Supply and Maintenance of STANDARDS MILITARY MIL-STD-105 - Sampling Pr0cedure.s and Tables for MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-1168 - Lot Numbering of Ammunition MIL-STD-1235 - Singl
5、e and Multilevel Continuous Inspection by Attributes (ABC-STD-105) Sampling Procedures and Tables for Inspect ion by Attribut es FSC: i315 THIS DOCUMENT CONTAINS /2 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60738 13 7777706 03L1227
6、3 2 MIL-P-60938 (MU) DRAWINGS ARMY 8796522 - Marking Diagram and Sealing for Wood 9230453 - Pellet, Smoke Marker Packing Boxes PUBLICATIONS ARMY ET-9230453 - Equipment Tabulation (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procure
7、ment functions should be obtained from the procuring activity or as directed by the contracting officer.) 3 REQUIREMENTS 3.1 Material.-Material shall be in accordance with the applicable drawings and specifications. 3.2 Pellet.-The pellet shall comply with all requirements specified on Drawing (dwq.
8、) 9230453 and all requirements specified in the applicable drawings and specifications. specified shall be utilized and no ingredients shall be omitted. charge composition and the igniter charge composition shall not exceed the applicable drawing requirements when tested in accordance.with 4.4.1. 3*
9、3 Compositions.-No ingredients other than those 3.4 Moisture content.-The moisture content of the smoke 3.5 Static functioning 3.5.1 Delay.-The delay in functioning shall not exceed 0.25 seconds when tested in accordance with paragraph 4.4.2. 3.5.2 Duration.-The smoke emission shall be maintained fo
10、r a minimum of 2.0 seconds when tested as specified in paragraph 4.4.2. smoke within 80 feet of projectile first function and trail smoke for a distance of 1000 feet, minimum, when tested as specified in 4.2.3. workmanlike manner. The pellet shall be free of dirt, chips and other foreign matter and
11、shall not exhibit excessive cavitation or broken interfaces. All packing components shall be dry. 3.6 Ballistic functioning.-The pellet shall generate black 3.7 Workmanship.-The pellet shall be fabricated in a thorough 2 f Provided by IHSNot for ResaleNo reproduction or networking permitted without
12、license from IHS-,-,- -T MIL-P-bo738 13 W 7997706 0342274 4 m MIL-P-60938 (Mu) IV 3.8 First article.-This specification makes provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 4. QUALITY ASSURANC
13、E PROVISIONS 4.1 General quality assurance provisions.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any c
14、ommercial labqratory acceptable to the Government. The Government reserves the right. to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to Standard M
15、IL-STD-109 in order to define terms used herein. The provisions of Specification MIL-A-2.550 shall apply. of product is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correc
16、t and applicable to the product being submitted: a. A statement that the lot complies with all of the quality assurance provisions specified within this specification. b. Number of units of product inspected. c. Results obtained, by defect code, for all inspections performed. d. Drawing, specificati
17、on number and date, together with an identification and date of changes. e. Certificates of conformance on all material purchased by the contractor when such material is controlled by Government or commercial specifications referenced in any of the contractual document s. The certificate shall be si
18、gned by a responsible agent of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the co
19、ntract, this aukhority is vested in another agent of the certifying organization. 4.1.1 Submission of product.-At the time the completed lot f. Number of items in the lot. g. Date submitted. 4.2 Ftrst Article Inspection 4.2.1 Submission.-The contractor shall submit a first article sample as designat
20、ed by the contracting officer for 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60738 13 O 777770b 0342275 b O MIL-P-60938 (MU) evaluation in accordance with the provisions of 4.2.2. The first article sanple shall consist of 40 pellets sepa
21、rately packaged in quantities of 10 units each which have been produced by the contractor or furnished by a supplier and r.:hich have been manufactured using the same prouction pro- cesses, procedures and eauipment which will be used in ful- fillirig the contract. All parts and materials, including
22、pack2ging and packing;, shall be obtaified from the same source -of suoply ii.s will be used iT rezular production. Prior to sukrr,fssicn, the contractor shall inspect the canple to the Gagnee fiecescary to assure that it conforms to the requirements of the contract and suhit a record of this inspec
23、tion with the sarr,?,le, incluing statements of findings for nnterials, processes n tests. A sanple containina known defects will not be sub- mitted .ur.lcss specifically athorized, k:y the contracting Officsr. A first article sengle, or portion thereof, as dir2cted by the contractinr officer, shall
24、 also be submitted Whezever there is a lapse in production for a period in excess of 90 days or wkenever a change occurs in manufacturing pocess, naterial used, drawing or specification such as to significantly affect product uniformity as determined by the Government . 4.2.2 Inspections to be perfo
25、rmed.-Pellets from three (3) containers will be subjected by the Government to any or all of the examinations or tests specified in 4.3.2 and 4.3.3 of this specification and any or all requirements of the applicable drawings. The inspection shall take place priorto insertion into the static test fix
26、ture. After inspection has-been completed and the pellets provisionally accepted, the remaining container of 10 pellets shall be sent to a Government Proving Ground for ballistic testing. 4.2.3 Ballistic Test.-Each of the ten (10) pellets selected for thiC test shall be inserted into an appropriate
27、fuze adapter, assembled into a complete round using a zone 7 propellant charge, and conditioned to 70 degrees Fahrenheit. The fuze shall be set to function at a 1000 meter range and the round shall De fired in a relatively horizontal trajectory in a weapon for which the round was designed. The heigh
28、t of the projectile at the point of fuze function should be approxi- nately 50 mesers above the terrain as an aid to observation. Each pellet shall generate black smoke within 80 feet of the projectile first function and exhibit a trail of smoke from first appearance to termination at least 1000 fee
29、t long as verified by appropriate measuring equipment such as engineering transits OF other equivalent means. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60738 13 m 7779906 0342276 8 m MIL-P-60938 (MU) 4.2.4 Rejection.-If any assembly or
30、component fails to comply with any of the applicable requirements, the first article sample shall be rejected. The Government reserves the right to terminate its inspection upon any failure of an assembly or component to comply with any of the stated requirements. 4.3 inspection Provisions 4.3.1 Lot
31、 formation.-The term irlotli as used throughout this specification refers to an inspection lot, which is defined .as an essentially homogeneous collection of units of product from which a representative sample is drawn and inspected to determine conformance of the lot with applicable requirements. T
32、he sample selected shall represent only that quantity of units from which the sample was drawn and shall not be construed to represent any prior or subsequent quantities presented for inspection. Homogeneity shall be considered to exist provided the lot has been produced by one manufacturer, in one
33、unchanged process using the same materials and methods, in accordance with the same drawings, same drawing revisions, same specifications and same specification revisions. Changes to the process, specifications, or drawings, not affecting safety, performance, interchangeability, or storage, as deter
34、mined by the Government, shall not be deemed to alter the homogeneity of the lot. In- spection lots shall comply with MIL-STD-105. Unless otherwise approved by the contracting officer, the inspection lot size of end items deliverable under the contract shall be not less than the smallest weekly esti
35、mate of quantities contractually scheduled for production during the contract period nor more than the largest monthly quantity contractually scheduled for delivery during the contract period. Inspection lots of components or subassemblies, other than the items of,delivery, shall be homogeneous and
36、of a size mutually convenient to both the contractor and the Government inspector. Lot numbering, as required, shall be in accordance with MIL-STD-1168. Each lot of pellets shall be prepared using individual ingredients from one manufacturer and shall contain the same proportion of ingredients. 4.3.
37、2 Examination.-Inspection for Critical defects (and Najor defects, when so specified)j shall be 100 percent. Sampling plans and procedures for Major and Minor defects shall be in accordance with MIL-STD-105 except that continuous sampling plans in accordance with MIL-STD-1235 may be used if approved
38、 by the 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60938 13 W 9999906 03Li2297 T I. MIL-P-60938 (MU) procuring activity. Also, at the option of the procuring activity, AQLs and sampling plans may be applied to individual characteristics
39、listed using an AQL of 0.65 percent for each Minor defect and an AQL of 0.40 percent for each Major defect, except where 100 percent inspection is specified. Equipment necessary for the performance of the inspections listed shall be in accordance with 4.3.4. 4.3.2.1 Pellet (see dwg. 9230453). Catego
40、ries Defect s Method of Code No. Inspection Critical: None defined. Maj or : AQL 1.0 percent 101. Weight of igniter charge . Scale O1001 (min.) . Gage 01002 103. Large diameter, maximum (max.) . Gage 01003 102. Length of side of hole, minimum 104. Thickness, max. Gage 01004 105. Location of square h
41、ole Gage O1005 Minor : AQL 2.5 percent 201. Igniter charge surface 202. Length of side of hole, max. . Gage O1007 coverage . Visual 01006 203. Large diameter, min. . Gage 01008 204. Thickness, min. Gage oioog (see 3.7) Visual O1010 205. Evidence of poor workmanship 4.3.2.2 Fiber tube container,prior
42、 to placing in inter- mediate packaging (see 501.1)- Cat egor ie s Defect s Xethod of Code No. Inspection Critical: None defined. MaJ or : AQL 0 65 percent 101. Aluminum wrap incomplete or tornto extent contents are exposed (prior to insertion into fiber tube container) . Visual 02001 6 Provided by
43、IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-102. 103. Minor : 201. 4.3.2.3 MIL-P-60938 13 I 9999906 03Li2298 1 Sealing strips improperly Fiber tube container torn, cut applied to coin wrap . Visual 02002 , or punctured . Visual 02003 AQL 0.65 percent Evidenc
44、e of poor workmanship (see 3.7) Visual 02004 Fiberboard container after sealin in barrier bag and prior to placing in wooden box (see 5.9.2) Categories Defects Critical: None defined. Method of Inspection Ma j or : AQL 0.40 percent 101. Barrier bag torn or exposing inner fiber box container Visual M
45、inor : AQL 0.65 percent 201. Evidence of poor workmanship (see 3.7) Visual 4.3.2.4 Sealed wood packing box (see 5.2). Categories Defects Critical: None defined. Method of Inspection Ma j or : AQL 0.65 percent 101. Box damaged . Visual 102. ICC nomenclature improper Visual 103. Contents loose . Visua
46、l 104. Strapping broken . Visual Minor : AQL 0.65 percent 4.3.3 Testing 201. Marking improper . Visual Code No. 03001 03002 Code No. 04 O01 04002 04003 04004 04005 4.3.3.1 Moisture content - Major defect.-Moisture content of smoke charge composition, Code No. 05001 and moisture content of igniter ch
47、arge cornposition, Code No. 05002.-The contractor 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. MIL-P-60938 (MU) shall provide adequate controls to assure the compliance of each lot with the applicable requirement. The contractor shall test a m
48、inimum of one randomly selected sample from each 8 hours of production, Cornposite samples shall not be used in determining compliance. Failure to comply with the applicable requirement shall be cause for rejection of the parent quantity from which the sample was drawn. Testing shall be performed as
49、 specified in 4.4.1. 4,3.3.2 Static functioning.-This test shall be conducted 4.3.3.2.1 Delay - Major defect - Code No. 05003. 4.3.3.2.1.1 Beginning with the first lot produced and using equipment in accordance with 4.3.4. continuing until three consecutive lots have complied with the applicable requirement, fifty sample pellets shall be randonly selected from each lot ar.6 tested in accordance with 4.4.2 If one or more sample pell