1、- -_ - MIL-P-63315 (2) 13 7777906 0398005 1 m MIL-P-63315 (AR) AMENDMENT 2 -12 January .i982 SUPERSEDING AMENDMENT 1 . 31 March 1981 MILITARY SPECIFICATION PRESSURE CARTRIDGE PARTS FOR AND LOADING, ASSEMBLING AND PACKING This Amendment forms a part of Military Specification MIL-P-63315 (AR), DATED 2
2、4 July 1975, and is approved for use by Army Armament Research .and Development Com- mand, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 2.1: Add “PRODUCT DRAWINGS“ above P/N 9292613 - Pressure Car tr idg e. Add “INSPECTION EQUIPMENT DRAWINGS and under
3、 it 9349011 - Pressure Test Fixture“ PAGE 3 3.4, “550 PSIG“ was “450 PSIG“; “Pressure test fixture“ was “T Bomb“ ; “0.122 + 1%“ was “0.049“; “25 MS“-was “50 MS“; 12100 PSIG“ was “2400 PSIG“. * Line8: Add “The 9292663 disk closure shall be retained in the 9292661 case after the cartridge has fired.“.
4、 PAGE 6 Table I. First Article Inspection, Insulation Resistance, Thermal Shock, Vibration, Function: Delete II (AQL) 0-1“. No Fire: Delete I (AQL) 0-1“. Cold: i1(-400F)“ was (-35OF)“; “50 (b)“ was l100 (b)“; delete “0-l1 Hot: “50 (b)“ was “100 (b)“; delete iO-llt. Add: “Ambient (70F - + 10F); 100,
5、3.4, 4.5, 8.3“. PAGE 16 4.4.2.9: “Add 102, Moisture content of intermediate charge, 3.3, 4 . 5 1“ . fl 1 FSC: 1345 1 of 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63315 (2) 13 7777906 034800b 3 MIL-P-63315 (AR) AMMENDMENT 2 PAGE 17 4.4.2
6、.10, 103: llElectrodes“ was “lead wires“. 110: qi1801t was “200“. 111: Delete in its entirety. 112: Cold tempera ture II (-4OOF) It was II (-35OF) I; “60 was Hot temperature: Ii6O“ was 80“; Add, Ambient (70O - + 10F), 60(a) (b), 3.4, 4.5-.8.3“. . 113: Add “Length of electrodes, min, 0.40%, 3.2, Gage
7、“. Notes: a. “Samples for the output test.“ was “Samples for II 8 0 Il i the test .I be “60-0-111 , 1160-1-211 was If80-0-1“ 80-1-2. I PAGE 19 4 .5.1: cor r ec t ca lc i um“ . PAGE 20 4.5.5.h: Change “4.5.6 and 4.5.7“ to I 4.5.6 and 4.5.8.3“. PAGE 21 4.5.7: Delete. 4.5.8.1, change: “minus 35OF“ to “
8、minus 40F“. Delete in first sentence: “fixture with the configuration of Fig 2 which simulates the volume of the sensor system as . .II. And substitute: “pressure test fixture (Dwg 9344011 or equiv- alent) with an internal volume . . II Delete starting on 12th line: “The fixture shall be cleaned aft
9、er each shot or as required“. And substitute: “Equipment, calibration, test and cleaning for internal volume maintainability procedures shall be in accord- ance with Dwg 9344011“. sure cartridge shall be tested using the procedure specified in 4.5.8.1 except no conditioning temperature shall be made
10、 for compliance with the requirements specified in 3.4. If any pres- sure cartridge fails to function or more than one (1) pres- sure-time failure occurs, the lot shall be rejected. (Destruc- Add “4.5.8.3 Ambient temperature (700F + 10F). The pres- 2 . ,/- (i ./ Provided by IHSNot for ResaleNo repro
11、duction or networking permitted without license from IHS-,-,- . MIL-P-b3315 (2) 13 7977706 0348007 5 = MIL-P-63315 (AR) AMMENDMENT 2 tive test). A record of each firing shall be kept. See 6.7.;. PAGE 22 6.l.a: change “XM74“ to “M74“. * 6 . 4 : change “DRDAR-QAA-QI to “DRDAR-QAT-Mg . PAGE 23 * 6 . 5.
12、1: change “DRDAR-QAA-Q“ to DRDAR-QAT-M“ . * 6.7 : change “DRDAR-QAA-QI to fDRDAR-QAT-M81. PAGE 24 Delete “Fig. 1“ and substitute “Revised Fig l“, see “Page 4“. PAGE 25 Delete “Fig. 2 - Pressure Test Setup (Suggested)“. The margins of this amendment are marked with an asterisk to indica te where chan
13、ges (add i ti ons , mod if ica tions , corrections , deletions) from the previous amendment were made. This was done as a convenience only and the Goverment assumes no liability what- soever for any inaccuracies in these notations. Bidders and con- tractors are cautioned to evaluate the requirements
14、 of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. s* Custodian: Army-AR Prepa r ing Activity : Army-AR (Project 1345-A200) f U.S. GOVERNMENT PRINTING OFFICE: 1982 O - 505-02211023 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63315 (2) 13 U 9999906 03LlOO 7 Mh-PL63315 (AR) AMENDMENT 2 s s II I n u Y ri! f 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-