ARMY MIL-P-63395 (3)-1993 PROJECTILE 155MM INERT PXR 6325 (M549 AND SIM) LOADING ASSEMBLING AND PACKING《PXR 6325型(M549和SIM型)155 mm惰性弹的装药 组装和包装》.pdf

上传人:sofeeling205 文档编号:446811 上传时间:2018-11-16 格式:PDF 页数:3 大小:99.17KB
下载 相关 举报
ARMY MIL-P-63395 (3)-1993 PROJECTILE 155MM INERT PXR 6325 (M549 AND SIM) LOADING ASSEMBLING AND PACKING《PXR 6325型(M549和SIM型)155 mm惰性弹的装药 组装和包装》.pdf_第1页
第1页 / 共3页
ARMY MIL-P-63395 (3)-1993 PROJECTILE 155MM INERT PXR 6325 (M549 AND SIM) LOADING ASSEMBLING AND PACKING《PXR 6325型(M549和SIM型)155 mm惰性弹的装药 组装和包装》.pdf_第2页
第2页 / 共3页
ARMY MIL-P-63395 (3)-1993 PROJECTILE 155MM INERT PXR 6325 (M549 AND SIM) LOADING ASSEMBLING AND PACKING《PXR 6325型(M549和SIM型)155 mm惰性弹的装药 组装和包装》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-P-b3395 (3) m b L8547LB 375 m MIL-P-63395 (AR) AMENDMENT 3 12 April 1993 SUPERSEDING AMENDMENT 2 3 April 1992 MILITARY SPECIFICATION PROJECTILE, 155MM: INERT PEW2 PXR 6325 M549 SIM LOADING, ASSEMBLING AND PACKING This amendment forms a part of Military Specification MIL-P-63395 (AR), dated O1 Ja

2、nuary 1980, and is approved for use by the US Army Armament, Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. Delete “Projectile, 155MM: Inert Prac PXR 6325 M549 SIM“ wherever it appears and substitute: lfProjectile, 155MM: Inert,

3、PXR 6325 (M549 and SIM.)“ PAGE 1 2.1 STANDARDS, MILITARY Delete: MIL-STD-1169 - Packaging, Packing and Marking for Shipment of Inert Ammunition Components PAGE 2 2.1 Drawings, delete title: “US Army Armament, Research and Development Command (ARRADCOM)“ and substitute the following: IUS Army Armamen

4、t, Research, Development and Engineering Center (ARDEC) Delete drawing “9362569 - Packing and Marking . Projectile, 155MM“ in its entirety (that was added in Amendment 1), and substitute the following: “8837839 - Pallet for Projectile, 155MM, HE distribution is unlimited. Provided by IHSNot for Resa

5、leNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63395 (3) m 9999906 l18547L 201 MIL-P-63395 (AR) AMENDMENT 3 PAGE 8 * 4.4.2.3, Minor 203: Delete, “Anti-seize missing from threads“ and substitute, silicone compound missing from threads“ PAGE 10 4.4.2.5 Block, Drawinu Numb

6、er: Delete “7549275“ and substitute 118837839f1. (This Pallet drawing no. supersedes that annotated in Amendment i.) 4.4.2.5, Major 103, delete: “or staple“. 4.4.2.5, Minor 203, delete: “or staple. PAGE 11 5.1, 5.2 Delete 117549275ii and substitute 1883783911. (This pallet drawing no. supersedes tha

7、t annotated in (Amend. i) 6.3 Delete in its entirety and substitute the following: “6.3 Submission of contractor inspection equipment desiqns for approval. See MIL-A-48078. Submit equipment designs, as required, to: Commander, US Army Armament, Munitions and Chemical Command, ATTN: SMCAR-QAR-I, Pica

8、tinny Arsenal, NJ 07806-5000. This address will be specified on the Contract Data Requirements List, DD Form 1423 in the contract.“ 6.5 Delete in its entirety and substitute the following: “6.5 Drawinqs. Drawings listed in section 2 of this specification under the heading US Army Armament Research,

9、Development and Engineering Center (ARDEC) may also include drawings prepared by and identified as Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal, Picatinny Arsenal, US Army Research and Development Command (ARRADCOM) or US Army Armament Research and Development Center (ARDC) drawings. Tec

10、hnical data originally prepared by these activities is now under the cognizance of ARDEC. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63395 (AR) AMENDMENT 3 PAGE 12 6.6 Lines 5 and 6: Delete “Commander, ARRADCOM, Dover, New Jersey 07801,

11、DRDAR-QAR-Q“ and substitute the following: “Commander, US Army Armament, Research, Development and Engineering Center (ARDEC), ATTN: SMCAR-QAR-Q, Picatinny Arsenal, New Jersey 07806-5000. The margins of this amendment are marked with an asterisk or vertical line to indicate where changes (additions,

12、 modifications, corrections, deletions) from the previous amendment were made. This was done as a convenience only, and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders andcontractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian Army - AR Preparing activity: Army - AR ( Proj ect 1320-ADO 3 ) 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1