1、MIL-P-b3430 (5) 13 = 99999Ob 0485599 b W I MIL-P-63430(AR) AMENDMENT 5 27 July 1991 SUPERSEDING AMENDMENT 4 30 April 1984 MILITARY SPECIFICATION PROJECTILE, 155MM) TEST, NON-HAZ, M718/M741 TYPES LOADING, ASSEMBLING AND PACKING OF This Amendment forms a part of Military Specification MIL-P-63430(AR),
2、 dated 1 December 1980, and is approved for use by the U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 5 Add paragraph 3.12 as follows: “3.12: Shorting bar resistance. There shall be no more than one (i)
3、ohm resistance to the shorting bar loop when measured between the output terminal to ground.“. PAGE 9 4.4.1: Inspection lot formation. Subparagraph b, change wording to read: one manufacturer.“ “Expulsion charge assemblies from one lot interfix, from Subparagraph e., add: “-1 and -2 after Electronic
4、 Assembliesn. PAGE 11 4.4.2.2: Electronic and primer assembly (M718). Major defect 102, change to read: “Bushing missing“ APSC N/A 1 of 6 DISTRIBUTION STATEMENT A. Approved for public release; FSC 1320 distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted wi
5、thout license from IHS-,-,-MIL-P-63430 (AR) AMENDMENT 5 PAGE 12 4.4.2.3: Electronic and primer assembly (M741). Major defect 102, change to read: “Bushing missing“. PAGE 13 4.4.2.4: Batkery check and insulator test point installation. Add major defect 104: “Resistance of shorting bar, improper, 1009
6、0, 3.12, 4.5.6“. PAGE 17 4.4.2.7: Mine, test, non-haz (during assembly) (M741). Major defect 113, change to read: “Retaining ring height improper“, PAGE 18 4.4.2.8: Mine, test, non-haz (during assembly) (M718). Major defect 113, change to read: “Retaining ring height improper“. PAGE 20 4.4.2.9: Proj
7、ectile, 155MM, M718/M741 Metal Parts Assy.(Prior to loading mines). Delete Drawing Number: “9282848“. Add Drawing Number: “10542902“. PAGE 21 4.4.2.10: Projectile, 155MM; test, non-haz, M741 type (prior to inserting mines into projectile). Critical defect 1, change to read: . “.being assembled into
8、projectile.“. Critical defect 2, change to read: “.being assembled into projectile,“. 2 o 1 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-* a * MIL-P-63430 (5) 13 m 9999906 0485bO.l O m MIL-P-63430 (AR) AMENDMENT 5 Critical defect 3, change to read
9、: “mine color code improper, or HE mine with non-haz color code “. PAGE 22 4.4.2.11 Major 104: Change “Sealant“ to “Sealing Compound“. PAGE 23 4.4.2.12: Projectile, 155MM, test, non-haz, M741 type (prior to assembling lifting plug). REFERENCE/INSPECTION METHOD and add “100%“ under AQL. Major 102: Ch
10、ange “Gage“ to “Gage/4.5.n under PARAGRAPH Major 108: Delete in its entirety. Add Minor 202 as follows: “202 Sealant not presenti between projectile body and base (360) 0.65% 3.2 Visual“. PAGE 24 4.4.2.13: Projectile, 155MM, tiest, non-haz, M741 type. Crikical defect 1, change wording from: “Nomencl
11、ature on body, letter in triangle and stamped number on base not5 consistent“ bo: “Nomenclature on body and lebter in triangle not consistent“, Major defect 102, change to read: “Lifting plug missing or improper“. Major defect 103, change as follows: No. of sample units, delete: “See 4.4.3.5“ AQL, a
12、dd: Major 104: Delete in its entirety and substitute: “0.40%“. “Major 104, Lifting plug or gasket missing or damaged 100% 3.2 Visual“. Minor defect 201, change to read: “.;.1/4 square inch“. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-634
13、30 (AR) AMENDMENT 5 . PAGE 26 4.4.2.14: Projectile, 155MM, test, non-haz, M718 type (prior to inserting mines into projectile). Critical defect 1, change to read: “.being assembled into projectile.“, Critical defect 2, change to read: “.being assembled into projectile.“. Critical defect: 3, change t
14、o read: “Mine color code improper, or HE mine with non-haz color code “. PAGE 29 4.4.2.17: Projectile, 155M, test, non-haz, M718 type. Critical defect 1, change wording from: “Nomenclature on body, letter in triangle and stamped to: “Nomenclature on body and letter in triangle not number on base not
15、 consistent“ consistent“, Major defect 102, change to read: “Lifting plug missing or improper“. Major defect 103, change as follows: No, of sample units, delete: “See 4.4.3.5“ AQL, add: “0.40%“ Major 104: Delete in its entirety and substitute: “Major 104, Lifting plug or gasket missing or damaged 10
16、0% 3.2 Visual“. Minor defect 201, change to read: “ .1/4 square inch“. 4 1 1 i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I i I I I I I I I i I MIL-P-63430 (AR) AMENDMENT 5 PAGE 31 4.4.2.18: Pallet (loaded). Major 106: Add the following: “Major
17、106, Cover support missing 100% 3.2 Visual (8 places)“. Major defect 201: Delete in its entirety. PAGE 33 44.3.5: Lifting plug torque. Delete paragraph in its entirety, 4.4.3.7: Expulsion charge assembly, Delete paragraph in its entirety. PAGE 35 4.5.5: Radiographic examination of test mines. Change
18、 title to read: “Radiographic examination of test mines and projectiles“. Change, “DRDAR-QAT-M“ to “DRSMC-QAT-M(D).“. Add paragraph 4.5.6 as follows: “4.5.6: Shorting bar resistance. The resistance of each shorting bar circuit shall be measured between the test points E3 and TP9, using an approved o
19、hmmeter. Observation shall be made for compliance with the requirement of 3.14.“ 4.5.7: Add new paragraph: .k “4.5.7 Inspection of gap between projectile body and base. Gap shall be inspected using an approved feeler gage as specified on drawing 9215220. The feeler gage shall be cleaned with a clean
20、 dry rag immediately after each inspection such that the gage is free of any base/body gap sealant. No. solvent or other substance other than a clean dry rag shall be used ko clean the gage. The gap between the projectile body and base shall be nspected within fifteen (15) minutes after the sealant
21、is applied to the shoulder of the base.“ 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63430 (5) 13 9999906 0485604 b I MIL-P-63430 (AR) AMENDMENT 5 PAGE 36 6.3: Submission of designs for approval. Change “DRDAR-QAT-I“ to “DRSMC-QAT-I(D)“.
22、6.4: Submission of test data and data cards. Change, “DRDAR-QAT-Mn to “DRSMC-QAT-M(D)“. The margins of this amendment are marked with an asterisk vertical lines to indicate where chanqes (additions, or I Custodian: Ar my- AR modifications, corrections, deletionsr from the previous amendment were mad
23、e. This was done as a convenience only, and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate bhe requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Preparing activity: Army-AR (Project 1320-AC55) 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-