ARMY MIL-PRF-62365 C-1997 MOTOR HYDRAULIC CONSTANT DISPLACEMENT《定量液压马达》.pdf

上传人:eventdump275 文档编号:447564 上传时间:2018-11-16 格式:PDF 页数:18 大小:726.74KB
下载 相关 举报
ARMY MIL-PRF-62365 C-1997 MOTOR HYDRAULIC CONSTANT DISPLACEMENT《定量液压马达》.pdf_第1页
第1页 / 共18页
ARMY MIL-PRF-62365 C-1997 MOTOR HYDRAULIC CONSTANT DISPLACEMENT《定量液压马达》.pdf_第2页
第2页 / 共18页
ARMY MIL-PRF-62365 C-1997 MOTOR HYDRAULIC CONSTANT DISPLACEMENT《定量液压马达》.pdf_第3页
第3页 / 共18页
ARMY MIL-PRF-62365 C-1997 MOTOR HYDRAULIC CONSTANT DISPLACEMENT《定量液压马达》.pdf_第4页
第4页 / 共18页
ARMY MIL-PRF-62365 C-1997 MOTOR HYDRAULIC CONSTANT DISPLACEMENT《定量液压马达》.pdf_第5页
第5页 / 共18页
亲,该文档总共18页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、I INCH-POUND 1 MIL-PRF-62365C(AT) 3 October 1997 SUPERSEDING 20 December 1996 MIL-PRF-62365B(AT) PERFORMANCE SPECIFICATION MOTOR, HYDMULIC, CONSTANT DISPLACEMENT This specification is approved for use by the US Army Tank-automotive and Armaments Command, Department of the Army, and is available for

2、use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification describes one type of hydraulic motor used in a launcher erection drive system on a military ground vehicle. 2.1 General. The documents listed in this section are specified in sections 3 and 4 of

3、 this specification. This section does not include documents in other sections of this specification or recommended for additional information or as examples, While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requ

4、irement documents cited in sections 3 and 4 of this specification, whether or not they are listed. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: US Army Tank-automotive and Armaments Command,

5、ATTN: AMSTA-TR-EBLUE, Warren, MI 48397-5000, by using the Standardization Document Improvement Proposal D Form 1426) appearing at the end of this document, or by letter. AMSCN/A - FSC 2590 DISTRIBUTION STATEMFNT A. Approved for public release; distribution is unlimited. Provided by IHSNot for Resale

6、No reproduction or networking permitted without license from IHS-,-,-. MIL-PF-62365C(AT) 2.2 Government documents. 2.2.1 Specifications. standards. and handbooks. The following specifications, standards, and handbooks form a part of bis document to the extent specified herein. Unless otherwise speci

7、fied, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited in the solicitation (see 6.2). SPECIFICATIONS DEPARTMENT OF DEFENSE MJL-PE-6083 - Hydraulic Fluid, Petroleum Base, For Preservat

8、ion and Operation. STANDARDS DEPARTMENT OF DEFENSE MIL-STD-8 1 O - Environmental Test Methods and Engineering Guidelines. (Uniess otherwise indicated, copies of the above specifications and standards are available from the Standardization Document Order Desk, 700 Robbm Avenue, Building 4D, Philadelp

9、hia, PA 191 11-5094.) 2.2.2 other Government documents. drawinm. and pubiications. The foiowing other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. DRAWINGS DEP

10、ARTMENT OF DEFENSE 12265 5 04 - Motor Assembly, Hydraulic, Erection Drive (Interface). (Copies of these drawings are available fiom the U.S. Army Tank-automotive and Armaments Command, ATTN: AMSTA-TR-EBLUE, Warren, MI 48397-5000.) 2 Provided by IHSNot for ResaleNo reproduction or networking permitte

11、d without license from IHS-,-,-MIL-PRF-62365C I 9999906 2054584 917 H 2.3 Non-Government publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents which are DoD adopted are those listed in the issue of t

12、he DoDISS cited in the solicitation. Unless otherwise specified, the issues of documents not listed in the DoDISS are the issues of the documents cited in the solicitation (see 6.2). AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) ANSVSAE AS478 - Identification and Marking Methods OD Adopted). (Applica

13、tion for copies may be obtained from the American National Standards Institute, 11 West 42nd Street, New York, NY 10036.) AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM B633 ASTM B650 - Standard Specification for Electrodeposited Coatings of Zinc - Standard Specification for Electrodeposited

14、 Engineering on Iron and Steel OD Adopted). Chromium Coating for Ferrous Substrates OD Adopted). (Application for copies may be obtained fiom the American Society for Testing and Materials, 100 Bar Harbor Drive, West Conshohocken, PA 19428-2959;) SOCIETY OF AUTOMOTIVE ENGDEERS, INC. (SAE) SAE AS1933

15、 - Age Controls for Hose Contahhg Age-Sensitive Elastomeric Matenais OD Adopted). (Application for copies may be obtained fiom the Society of Automotive Engineers, Inc., 400 Commonwealth Drive, Warrendale, PA 15096.) 2.4 Order of precedence. In the event of a conflict between the text of this docume

16、nt and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to fir

17、st article inspection in accordance with 4.3. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-fiIL-PRF-623b5C m 0b 12854585 853 Particle size range (micrometers) 5 to 15 15 to 25 25 to 50 50 to 100 Over 100 3.2 Materials. Materials used shall be in

18、 accordance with appiicable Government specifications or the manufcturers materials specifications for hydraulic motors. The materials shall be capable of meeting ail the operational and environmental requirements specified herein. Recovered materials shall be used to the maximum extent practicable

19、(see 4.4.2). Number of particles 64 O00 11 400 2025 360 64 3.2.1 Metals. Ail metais used in the construction of the hydraulic motor shall have corrosion resistance at least equivalent to anodized aluminum. There shail be no contact between issimiiar metals (see 4.4.2). 3.2.2 Aae sensitive materials.

20、 The use of age sensitive materials shall be controlled in accordance with SAE AS1933 (see 4.4.2). 3.2.3 Plating. Steel parts in contact with aluminm doy parts shall be either zinc plated in accordance with ASTM B633, or chromium plate equivalent in accordance with ASTM B650 class I. Zinc plating an

21、d tin plating shall not be permitted on parts which come in contact with hydradic fluid (see 4.4.2). 3.2.4 Anodizing. All aleum-alloy parts shall be anodized in accordance with commercial practice and shall meet ali the performance and environmentai requirements of this specification (see 4.4.2). 3.

22、3 Design and construction. 3.3.1 Fluid. The hydraulic motor shali be designed to meet ail requirements of this specification when supplied with the hydraulic fluids conforming to MIL-PRF-6083 (see 4.2.4 and 4.4.2). 3.3.2 Cleanliness. The fluid drawn continuous, intermittent, reversmg and stalled ope

23、ration in either direction of rotating and application of loads on the motor shaft up to 30 lb-in. c. Instrumentation necessary for measuxing, motor rpm, motor torque, oil pressure, oil flow rates, oil temperature, and leakage. d. All gages and measuring devices shall be accurate within +5% of full

24、scale. 4.3 First article inspection. First article inspection shall be performed on preproduction or initial production samples as specified in table III (see 3.1). 4.3.1 Preproduction inspection. When specified (see 6.2), the preproduction sample shall consist of two hydraulic motors. Preproduction

25、 inspection shall consist of examination as spded in 4.4.1.3 and tests specified in table IIi. 4.3.2 Initial production inspection. Unless otherwise specied (see 6.2), the Government shaU select two samples, from the fkst 10 hydraulic motors produced under the production contract for initial product

26、ion inspection. Initial production units shall be examined as specified in 4.4.1.3 and testeci as specified in table III. 4.4 confomance insDection. 4.4.1 Samping. Sampling for inspection lots and samphg for examination of conformance, see 6.5. 4.4.2 Materials and design. conformance to 3.2 thru 3.3

27、.12 shall be determined by inspection of contractor records providing proof of certification that materials and design conform to requirements. Applicable records shall include drawings, specifications, design data, receiving inspection records, processing and quality control standards, vendor catal

28、ogs and certifications, industry standards, test reports, and rating data. Title Materialsandfinish Design and construction Fluid Cleantiness y Lubrication Interchangeability confc First article X X X X X X iance Test 100% X 10 Provided by IHSNot for ResaleNo reproduction or networking permitted wit

29、hout license from IHS-,-,- MIL-PRF-62365C 0 999990b 2054592 T93 W TABLE III. Classifi Title lirection of rotation i/ Zonfiguration Weight Starting torque Running torque Friction torque Holdmg torque intermittent torque 4ttitude Resisting load Cylinder block lift Volumetric efficiency nitermittent sp

30、eed endurance Runningleakage Shaft seal leakage Consumption Direction of rotation Break-in run High temperature (operating) High temperature (nonoperating) Low temperature (operating) Fungus Shock (nonoperating) Vibration (nonoperatbg) Proof pressure Burst pressure Marking L/ - 1/ See 4.5.1 andtable

31、 IV. Idling loss salt fog workmanship L/ 4.5 Method of inspection. tion of inspect Requirement 3.3.10 3.3.11 3.3.12 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 3.4.6 3.4.7 3.4.8 3.4.9 3.4.10 3.4.11.1 3.4.11.2 3.4.12 3.4.13 3.4.14 3.4.15 3.5.1 3.5.1.1 3.5.2 3.5.3 3.5.4 3.5.5 3.5.6 3.5.7 3.5.8 3.6 3.7 sns - - Conti

32、nued. Inspection 4.2.6 4.5.1 4.5.1 4.5.3.1 4.5.3.2 4.5.3.3 4.5.3.4 4.5.3.5 4.5.3.6 4.5.3.7 4.5.3.8 4.5.3.9 4.5.3.10 4.5.3.1 1.1 4.5.3.1 1.2 4.5.3.12 4.5.3.13 4.2.6 4.2.1 4.5.4.1 4.5.4.1.1 4.5.4.2 4.5.4.3 4.5.4.4 4.5.4.5 4.5.4.6 4.5.4.7 4.5.4.8 4.5.2 4.5.2 Codo First article X X X X X X X X X X X X X

33、 X X X X X -x X X X X X X X X X X X lance Test 100% X X X X X X X X X 4.5.1 Defects. Conformance to 3.343.3.11 and 3.6 shd be determined by examination for the defects listed in table IV. Examination shall be visual, tactile, or by measurement by SIE. 11 Provided by IHSNot for ResaleNo reproduction

34、or networking permitted without license from IHS-,-,-NIL-PRF-bZ3bSC W 9999906 2054593 2T Category Milor: 101 102 103 Minor: 201 202 203 204 MIL-PRF-623 65C(AT) TABLE V. Classification of defects. Defect Dimensions aikcting interchangeability not within Direction of rotation marking not as specified

35、Weight not as specified (see 3.3.12). tolerance (see 3.3.8 and 3.3.1 1). (see 3.3.10). Dimensions not affecting interchangeabfity not Improper marking (see 3.3.10 and 3.6). Improper workmanship (see 3.7). Cleanliness (see 3.3.2). within tolerance (see 3.3.8 and 3.3.11). Method of inspection SIE y Vi

36、sual SIE SIE Visual visual SIE _ - 1/ SIE = Standard Inspection Equipment. 4.5.2 Tests. Each hydraulic motor assembly shall be subjected to the tests specified in table lII. 4.5.3 Performance. 4.5.3.1 Startm g torque. To determine conformance to 3.4.1, the motor shaft shall be exernally rotated thro

37、ugh one revolution at a rate less than one rpm. The difrential pressure across the motor ports shail be mallrtained at a value not to exceed 2300 psi. The torque measure at any point in the rotation shall not be less than 30 lb-in. 4.5.3.2 Runnino torque. To determine conformance to 3.4.2, the torqu

38、e shail be measured at the output shaft of the motor, running at a speed of 3000 rpm with a differential pressure of 2300 psi. The torque shaU be not less than 30 lb-in. 4.5.3.3 Friction torque. To dethe confiormance to 3.4.3, the torque required to rotate the unit at a speed of 6 rpm shall be measu

39、red at the output shaft. The torque required shall not exceed 2.5 lb-im (0.28 N-m). 4.5.3.4 Holdina toraue. To determine conformance to 3.4.4, apply an overhauling torque of 24 bin to the motor shaft. Connect the drain port to the inlet port thni a 10 psi check valve and block the outlet port. Fill

40、all hydrdc lines with hydraulic fluid. The motor shaft shall not rotate more than 200 revolutions in 10 minutes with a 24 lb-in (2.7 N-m) torque applied. 12 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-PRF-bZ3b5C m 7L79Ob 2054594 8bb m 4.5.3.

41、5 Intermittent torque. To determine conformance to 3.4.5, the outlet port of the motor shall be connected to the drain through a 2700 psi relief valve. The inlet port shall be supplied hydraulic fluid through an anti-cavitation check valve from the drain. The case drain shall be connected to drain t

42、hrough a 20 psi (6.9 kPa) check valve. The torque shall be sufficient to cause flow through the 2700 psi relief valve. Repeat for a total of 3000 cycles. The motor shall be capable of meeting the performance requirements of 3.4 after the test. 4.5.3.6 Attitude. Conformance to 3.4.6 shall be verified

43、 by tests on a motor with the mounting flange in at least 3 positions: horizontal; vertical, up; and vertical, down. 4.5.3.7 Resisting load. To determine conformance to 3.4.7, a load of 30 lb-in shall be applied to the motor shaft tending to turn the motor shaft in opposition to the direction establ

44、ished by the hydraulic flow (resisting load). The motor shall be run at 3000 rpm. The pressure differential shall not exceed 2300 psi (see 3.4.2). 4.5.3.8 Cvlinder block lift. To determine conformance to 3.4.8, the motor shall be operated at 9000 rpm for 10 seconds in each direction with no load on

45、the shaft. There shall be no cylinder block lift as evidenced by the absence of excessive case drain flow. 4.5.3.9 Volumetric efficiency. To determine conformance to 3.4.9, the shaft shall be loaded to impose an operating pressure on the inlet port, the motor speed shall be varied between 1500 and 6

46、000 rpm and the volumetric efficiency shall not be less than 95%. 4.5.3.10 Intermittent speedendurance. To detennine conformance to 3.3.4 and 3.4.10, the motor shall be started with a resistive load of 22 lb-in (2.5 N-m) applied to the output shaft. The motor shall be operated at this load for 6 sec

47、onds at 5000 rpm and then stopped. The time required to change direction of motor rotation shall not be less than 1 second nor more than 1 O seconds. A sequence of 5 periods of operation in each direction followed by a nonoperating period of not less than 2 minutes shall comprise one test cycle, wit

48、h a resistive load. The motor shall be acted upon by an overhauling load in the identical manner as the resistive load. The overhauling load test cycle shall be the same as for the resistive load test cycle. Perform at least 5000 cycles in accordance with table II (see 6.3). 4.5.3.11 Leakage. Operat

49、ing fluid for leakage tests shall be supplied at a temperature of 130F (54C) (see 3.4.11). 4.5.3.1 1.1 Running leakage test. To determine conformance to 3.4.11.1, with the motor shaft free to rotate, apply 1000 i25 psi (6900 i170 Ha) to one port and throttle the output to achieve approximately 10 rpm motor shaft speed. Apply 100 +i0 psi (689.5 569 kPa) to the case drain. 13 Provided by IHSNot for ResaleNo reproduction or networ

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1