ARMY MIL-S-1123 E (1)-1971 SHOE REPAIR SHOP EQUIPMENT《鞋修理厂设备》.pdf

上传人:赵齐羽 文档编号:447860 上传时间:2018-11-16 格式:PDF 页数:3 大小:97.61KB
下载 相关 举报
ARMY MIL-S-1123 E (1)-1971 SHOE REPAIR SHOP EQUIPMENT《鞋修理厂设备》.pdf_第1页
第1页 / 共3页
ARMY MIL-S-1123 E (1)-1971 SHOE REPAIR SHOP EQUIPMENT《鞋修理厂设备》.pdf_第2页
第2页 / 共3页
ARMY MIL-S-1123 E (1)-1971 SHOE REPAIR SHOP EQUIPMENT《鞋修理厂设备》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-S-LL23E (1) 35 773990b 0242897 9 MIGS-1123E AMENDMENT- 1 12 March 1971 MILITARY SPECIFICATION SHOE REPAIR SHOP EQUIPMENT This amendment form a part of ?fIi,-S-l123E, dated 25 September 1968, and is mandatory for use by all Departnients and Agencies of the Department of Defense, PAGE 3 2.2 Add th

2、e following: “NATIONAL MOTOR FREIGHT TRAFFIC ASSOCUTION, INC. National Motor Freight Classification . (Applications for copies should be addressed to American Trucking Associ- ations, AT“: 20036 . ) Tariff Order Section, 1616 P Street, N.W., Washington, D.C. UNIFORM CLASSIFICATION COMMITTEE Unif om

3、Freight Classification (Application for copies should be addressed to the Uniform Classification Comibttce, Room 202 Union Station, 516 W. Jackson Blvd, Chicago, Illinois 60606.)“ 3.1 Delete and substitute: “First article.- Whe.n specified (see 6.2) the supplier shall furnish a sanple for first arti

4、cle inspection and approval (see 4.2, 6.2 and 6.4).“ PAGE 6 3.7 Delete entirely. Table I, item No, 1.- Add “size 16“. FSC 3520 G Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-1123E Amendment- 1 PAGE 7 Table i, item No4, after “Heel breastera.

5、- Add “abrasive, silicon carbide, grade 81 paper, C-weight, open coating, 1-118 iqckes inside diameter, 3-7/16 inches outside diameter“. Table I, item 9.- Table II, item 1.-.:.Add “size -16“, Add “size 16, 45 degrees“. _- i - : . . i. :,.: imle XI, iten 4, after “Heel breaster“.- Add “abrasive, sili

6、con carbide, grade 111 paper, C-weight, open coating, 1-118 inches inside diameter, 3-7/16 inches outside dieter“. - PAGE 8 - . Table II, item 12.- Add “size 16, 45 degrees“. PAGE 10 4.2 Add: “The presence of any visual defect, dimensions not within specified requirements or failure to pass the test

7、s shall be cause for rejection of the preproduction sample“. PAGE 11 4,5.2 Delete entirely and substitute the following: 4.5.2 Electromagnetic corripatibili ty.- When electromagnetic compatibility is required, the preproduction sample or initial unit of production, as applicable, shall be tested by

8、the supplier in accordance with test methods CE03 and WO2 of MIGCTD-462. The Governuent reserves the right to witness tests performed by the supplier or an independent testing agency. shall furnish the contracting officer written certification that the Interference Control Plan, the Eff/EXC Test Pla

9、n, the electromagnetic test report and the requirean ts met -“IIL-STD-461r I Il The supplier PAGE 15 5.2.3 Delete entirely and substitute: “5.2.3 Level Ca- Equipmnt, preserved and packaged, shall be packed in a manner to insure carrier acceptance and safe delivery at destination at the lowest transp

10、ortation rate for such supplies. Containers shal be in accordance with Unifom Freight Classification Rules or National hiotor Freight Classification Rules as applicable.“ . 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-YIL-S- 112 3E Anendren t- 1

11、 PAGE 16 6.2, (cl.- Delete and substitute: “(c) When first article is required (see 3.1, 1.2, and 6.4).“ 6.2, (f).- Delete entirely. Add new paragraph: “6.2,l Cmtract data reauiremnt.- Any requireents for equipant manuals for the items covered by this specification should be included in DD Form 1423

12、 Contract Data Requirements List and cited in the contract.“ 6,4 Delete and substitute: “6.4 First article When a first article is required, it shall be inspected and approved under the appropriate provisions of AS?R 7-104.55. article shwld be a preproduction sample, of one unit. in all procurenent

13、instruments, regarding arrangemrnt for inspection and approval of the first article,“ The first Tie contracting officer should include specific instructions The first article should consist Custodians: AT - GL Air Force - 84 Review Activi tj- : Am - MD Preparing activity: Armp-GL Project No. 3520-0024 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1