1、MIL-S-b314 47 W 7797706 0252bL4 b W / MIL-S-63148 (AR) 31 MAY 1977 MILITARY SPECIFICATION STRAY VOLTAGE MONITOR ASSEMBLY This specification is approved for use by the U.S. Army Armament Research and Development Command, and is available. for use by al1 Departments and Agencies of the Department of B
2、e feme, ne SC.OPE I,% This specification contains the Quality Assurance Provisions for inspecting and testing the Stray Voltage Monitor used in conjunction with the Dispenser. M-130 Aircraft General Purpose 20 APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on the date of inv
3、itation for bids or request for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification For STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspecti
4、on by Attributes MIL-STD-810 - Environmental Test Methods MIL-STD-1460- Soldering of Electrical Connections and Printed Wiring Assemblies, Pro- cedure for FSC: 4925 g at the end of this document or by letter. 1: Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro
5、m IHS-,-,-MIL-S-63148 49 W 7797706 0252615 8 = I MIL-S-63148 (AR) DRAWINGS (See 6,5) U.S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND 9313794 - Stray Voltage Monitor Assembly 9322175 - Packing and Marking for Box, ,Exterior for Stray Voltage Monitor Assembly (Copies of specifications, standards,
6、drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by $he Contracting Officer), 2;2 Other. publicatiorne. - The oLlowfng documents form a past of this specification %o the extent specified he
7、rein. Un- less otherwise indicated, the issue in effect on the date of invitation or bids or request for propsal. shall apply. CODE OF FEDERAL REGULATIONS Title 49 - Transportation, Parts 100-199 (The Code of Federal Regulations is available from the Super- intendent o Documents, U.S. Government Pri
8、nting Officer, Washington, DOC, 20402, Orders should specify, “49 CFR 100-199 (latest revision) I) . 1 -3 REQUIREMENTS 3.1 Materials. - ,Materials shall be in accordance with the applicable drawings and specifications. 3.2 Components and assembl.ies. - The components and assemblies shall comply with
9、 all requirements specified on drawing 9313794 and associated drawings and with all require- ments specified in applicable specifications and standards. 3.3 Eleotrical tests 3.3.1 Circuit -zesistance.- - The electrical resistance of the circuits listed in Table I bi, ti O U lc Zl d u ri zi U rn u ri
10、 3 a -I , Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I MIL-S-63148 47 W 7777706 0252625 O W. MIL-S-63148 (AR) 4.4.3 . Tes:t:ing - ,Testing is described in the First Article and Quality Conformance Inspection tables. 4.4.4 Ihspection equipment. -
11、 The inspection equipment required to perform the inspections and tests prescribed in this specification is identified in the “Paragraph Reference/ Inspection Method“ column in the tables starting with paragraph 4.4c2.1, and the test method paragraphs (see 4.5). The con- tsacPor shall submit for app
12、roval, inspection equipment designs in accordance with the terns of the contract. See Section 6 of 611L-A-480781 and Section 6.3 herein. Test methods and procedures. - 4.5 4.5.1 Circuit resistance. - The requirements of 3.3.1 shall be verified by testing in accordance with MIL-STD-202, Method 303, u
13、sing equipment in accordance with 4.4.4. shall be verified by testing in accordance with MIL-STD-202, Method 302, Test condition B, using equipment in accordance with 4.4.4. 4.5.2 Insulation resistahce. - The requirements of 3.3.2 4.5.3 Transportatioh vibration. - Using equipment in accordance with
14、4.4.4, subject each first article unit to the vibration requirements of MIL-STD-810, Method 514.2, Procedure X to verify conformance to 3.4.2. each Stray Voltage Monitor for evidence of damage and submit each item to the procedures of 4.5.1 and 4.5.2, fails to comply to the applicable requirements s
15、hall be rejected. accordance w?th 4.4.4, subject each first article unit to test 105 of MIL-STD-331 to verify conformance to 3.4.3. Following this 28 day test, lower the chamber temperature to 130OF mini- mum and allow to stabilize for a minimum of 4 hours. Subject each unit to the electrical tests
16、4.5.1 and 4.5.2, at 130OF. The tests shall be completed within 30 minutes maxrnum after removal from the chamber. Following this test, place the units in a chamber at -60F for a minimum of 4 hours and repeat the electrical tests. applicale requirements shall cause the first article sample to be reje
17、cted. Following this test, inspect Any unit which 4,5,4 Temperature and humidity - Using equipment in - Any item which fails to meet 12 i; . . - . . . - . , Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-63L48 49 W 9999906 0252626 2 I MIL-S-6
18、31 4 8 (AR) 50 PREPAISATION FOR DELIVERY 5.1 Dwg. 9322175. Packaging,. - Packaging shall be as specified on 5.2 Packing and markinq. - Packing and marking shall be as specified on Dwg. 9322175. NOTES 60 - 6.1 Intended use. - This Stray Voltage Monitor is used in testing the M-130 Aircraft General Pu
19、rpose Dispenser. 6.2 Ordering data. - Procurement documents shall specify the folowing: a, b. Provisions for submission of first article samples, C. Provisions of MIL-A-48078. Title, number and date of this specification. 6,: Submission of inspection equipment designs for approval. (See MIL-A-48078)
20、. - Submit equipment designs as required, to Commander: U.S. Army Armament Research and Development Command, ATTN: DRDAR-QU-I, Dover, New Jersey 09801. 6.4 Distribution of- ammulYition data cards. - Distribution of data cards shall include the following: Commander, U.S. Army Armament Research and De
21、velopment Command, ATTN: DRDAR- QAA-Q, Dover, New Jersey 07801. specification under the headsing US Army Armament Research and Development Command (ARRADCOM) may also include drawings prepared by, and identified as, Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal or Picatinny Arsenal drawin
22、gs. Technical data originally prepared by these activities is now under the cognizance of ARRABCOM. 6.5 Drawings. - Drawings listed in Section 2 of this Custodian : Army-AR Project Number: 4925-A-029 13 II Preparing Activity: Army-AR *U.S. GOVERNMENT PRINTING OFFICE- 703-122/1005 . _. -: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-