1、MIL-T-LIb365 (4) 12 499990b 03LL507 ci MIL-T-46365 (M) AMENDMENT4 . 30 October 1970 SUPERSEDIKG AMENDMENT 3. 15 April 1970 MILITARY SPE CIFZCATION TELESCOPES, ELBOW: M92D AND M92F This amendment forms a part of Military Specification MIL-T-46365(MU), dated 20 December 1962. Paragraph 3.7: Delete and
2、 substitute: “3.7 Sealing.- The telescope shall show no evidence of leakage in excess of 0.2 psig when subjected to an external pressure of dry nitrogen of five (5) pounds per square inch gage pressure (psig) for a minimum period of two (2) hours. as minus 25 Fahrenheit (F) .I Dew point of nitorgen
3、shall be at least as low * Delete paragraphs 3.8.1 and 3.8.2 and substitute the following: “3.8.1 Collimation.- The line of sight through the-center of the boresight cross shall be parallel to the axis of the .external taper within 0.5 mils. -i 3.8.2 Parallelism of image and reticle.- With the axis
4、of the external . taper horizontal and the cross level vial centered, the horizontal reticle to a horizontal target line image within 30 minutes of arc.“ -(defined by the lead marks) through the boresight cross shall be parallel Delete paragraphs 4.3 and 4.3.1 and substitute the following: “4.3 Firs
5、t Article (Initial Production) Approval.- The requirement: for first article approval and the responsibility (Government or contractor) for first article testing shall be as specified in the contract. ple for first article approval tests shall consist of (3) telescopes plus three (3) each of all ite
6、ms covered by SQAP. in the same manner, using the same materials, equipment, processes, and procedures as used in regular production. packaging and packing, shall be obtained from the same source of supply as used in regular production. The sam- The sample shall.be manufactured All parts and materia
7、ls, including - 4.3.1 Government Testing.- When the Government is responsible for conducting first article approval tests, the contractor, prior to submitting the sample to the Government, shall inspect the sample to insure that it conforms to all the requirements of the contract and submit a record
8、 of this inspection with the sample, including certificates af conformance for materials. 4.3.2 Contractor Testing.- When the contractor is responsible for conducting first article approval tests, the sample shall be inspected by the contractor for all the requirements of the contract. The sample an
9、d FSC 1240 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a record of this inspection, including certificates of conformance for materials, shall be submitted to the Government for appioval. ment reserves the right to witness the contractor.s hspect
10、ion.“ The Govern- Add paragraph as follows: “6.5 international standardization aireement. - Certain provisions of this specification are the sgbject of nternationa1.standardization agreement, ABCA-Army-Std-46B. of this specification is proposed which will effect or violate the international agreemen
11、t concerned, the preparing activity will take . appropriate reconciliation action through international standardization channels including departmental standardization offices, if required.“ * The outside margins have been marked to indicate where additions to the previous amendment have been made.
12、This has been done as a convenience only and the Government assumes no liability whatsoever for any inac- curacies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entir content as written irrespective of the marginal notation and relationship to the last previous issue. When amendment, revision, or cancellation Custodian: Amy - MLT Preparing activity: Army - Mu Project No. 1240-A267 Page 2 of 2 Pages Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-