1、- MIL-T-63263 (3) 117 M 777770b 025261111 11 . MIL-T-6326 3 (AR) AMENDMENT 3 - . . SUPERSEDING AMENDMENT 2 . 11 October 1979 MILITARY SPECIFICATION TEST SET, ELECTRONICS SYSTENS: M91 . This Amendment forms a part of Mi-litary.Secification . . . - MIL-T-63263 (AR), dated 3 May 1978, and is approved f
2、or use within the U.S. Army Armament, Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 STANDARDS , MILITARY: Dele te the following: “MIL-STD-331 - Fuze and Fuze Components, Environmental and Performance Tests For“ PAGE 3 3.4
3、: Delete “except for temperature humidity which is contained in MIL-STD-331“. 3.4 .I, Add to end of paragraph: “using curve AW of Figure 5 14.2-7“. 3.4.2: Delete.in its entirety. 3 .4 .3: Delete “Test 105.1 of MIL-STD-331 . I and substitute “Method 507.1 , Procedure I“. AMSC N/A 1 of 3 FSC 4925 DIST
4、RIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-63263 (3) 47 m 7977906 02526115 6 m I. MIL-T-63263 (AR) AMENDMENT 3 PAGE 5 TABLE I: Delete the following line: “Helico
5、pter vibration 2 100% 3.4.2 4.4.3.1“. PAGE 11 . . 4.4.2.5: Delete “9326142“ and substitute “932614S1I. PAGE 15 4.4.2.9: Delete Minor Defect 201. PAGE 20 4.4.2.14: Delete Major Defect 102. PAGE 24 4.4.3.2: Delete in its entirety, PAGE 28 4.5.1: Line 4: Delete “conttractor“ and substitute “contractor“
6、. Pre-Sett ng Requirement: Add the following: “5. Test Set Tester. Set Dispenser Counter M1 to thirty .I1 PAGE 30 * 4.5.1, 9d, line 3: Delete “-(red)-“. 4.5.2: Delete in its entirety. 4.5.3, Add after “Procedure XI: “using curve AW of Figure 514.2-7“. Provided by IHSNot for ResaleNo reproduction or
7、networking permitted without license from IHS-,-,-MIL-T-63263 (3) 47 m 7777906 0252646 MIL-T-63263 (AR) AMENDMENT 3 4.5.4: Delete in its entirety and substitute: “4.5.4 Temperature humidity. Using equipment in accordance with 4.4.4, subject each first article unit to Test Method 507.1, Procedure I o
8、f MIL-STD-810. 6 and 7 of test method with the following: Replace Step Step 6. At the end of the tenth cycle, remove and inspect the test item and condition the test item as 25+5OC (ambient) for at least one (1) hour, operate the test item and obtain results in accordance with General Requirements,
9、3.2. If any item fails to meet any of the applicable requirements the first article sample to be rejected.“ The margins of this amendment are marked with an asterisk or vertical line to indicate where changes modifications, corrections, deletions) amendment were made. This was done as a convenience
10、only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. (additions, from the previous Custodian: Army-AR Preparing activity: Army-AR (Project: 4925-A049) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-