ARMY MIL-T-780 E-1975 TAMPER PISTON-HAMMER TYPE PNEUMATIC《气动活塞锤式捣固机》.pdf

上传人:sumcourage256 文档编号:448981 上传时间:2018-11-16 格式:PDF 页数:14 大小:658.89KB
下载 相关 举报
ARMY MIL-T-780 E-1975 TAMPER PISTON-HAMMER TYPE PNEUMATIC《气动活塞锤式捣固机》.pdf_第1页
第1页 / 共14页
ARMY MIL-T-780 E-1975 TAMPER PISTON-HAMMER TYPE PNEUMATIC《气动活塞锤式捣固机》.pdf_第2页
第2页 / 共14页
ARMY MIL-T-780 E-1975 TAMPER PISTON-HAMMER TYPE PNEUMATIC《气动活塞锤式捣固机》.pdf_第3页
第3页 / 共14页
ARMY MIL-T-780 E-1975 TAMPER PISTON-HAMMER TYPE PNEUMATIC《气动活塞锤式捣固机》.pdf_第4页
第4页 / 共14页
ARMY MIL-T-780 E-1975 TAMPER PISTON-HAMMER TYPE PNEUMATIC《气动活塞锤式捣固机》.pdf_第5页
第5页 / 共14页
亲,该文档总共14页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、-129. In aadition to any specil ,marking required by the contract 6. NOTES 6.1 intended we. The tamper covered by this specification is intended t0 be used for capacting or tamping earth when refilling all types of excavations . 6.2 Ordering data. Procurement documents should specify the following:

2、Title, ntadber, and date of this specification. and atmber of krs required (see 3.2). : Time frame required for submission of the preproduction model 12 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-78OE 38 9999906 0208787 Y = MIL-T-780E When

3、 the Government will conduct aay or alJ. of the preproduction model examination and tests. When the Government will conduct sane but not all of the preproduction examination and tests, the contracting officer should specify which exmination and tests will be conducted by the Government and which exa

4、min ation and tests SW be conducted by the smer (see 3.2). When initial production inspection is required and nmber of When a cow half is not to be furnished (see 3.14) . Color specified (see 3.18). when a chest is required (see 3.19). Imel of preservatim and packaguig and level of packing required

5、(see 5.1 and 5.2). 6.3 Prep reduction model. Any changes or deviations of production tampers tampeis to be furdshed. (see 3.3). Aurm %be approved preproductlan,abdel during production wJ11 be subject to the apprwal of the contracting officer. Approval of the preproduction iodel will not relieve the

6、sizpplier of his obligation to furnish tampers conforming to this specification. 6.4 noise hazard. When the noise level of the tamper exceeds 85 dB(A), the ampropriate discussion of the noise hazard per Ma-STD-1474 (iiaauai Psragraph) shall include the requirement for hearing protection, the noise l

7、evel of the item, the distance fran the item at which 85 dB(A) Ku1 aJws be met, and what operati& situation or system configuration KLIl reduce the level to 85 dB(A). lubricants applicable to the tamper covered-by this specification as con- taine in the Federal Supply Catalog, Department of Defense

8、Section, Identi- flcatian List cg1oo-IL, for FSE Group 91. 6.5 Lubricants. !L%e contracting officer should furnish a list of military 6.6 Data requizwnents. The contrctng officer should include require- mts for such data as technical publicatiods, instructionl materials, Uustrated parts list, and sq

9、pUers mxlntenance and operation manual to be furnished with each tamper. 6.7 h.ovisioni.rw. The contracting officer should indue provisioning requirements for repair parts and maintenance toois as necessary (inciuaing aqy special tools) Snd instructions on shipment of tampers. A suggested paragraph

10、is 85 follows: “Shipment of tampers shall include repair parts, maintenance tools, qperatianal. instructions, .id accessories, unless exceptions are piwrided elsewhere in the contract.“ I 13 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-78OE 38 a 77777Ob 0208788 b MIL-T-780E Custodiant: Review activlty : DSA-cs User activities : Aw-CE Navy - YD * U. 5. GOVERNMENT PRINTIffi OFFICE: 1971605 118/4674 14 I 5 Preparing activity: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1