ARMY MIL-W-48369 (5)-1980 WARHEAD SECTION GM PRACTICE LIGHTWEIGHT M252 PARTS AND ASSEMBLING《M252型轻量级导弹弹头零件实施零件的装配》.pdf

上传人:sofeeling205 文档编号:449090 上传时间:2018-11-16 格式:PDF 页数:7 大小:225KB
下载 相关 举报
ARMY MIL-W-48369 (5)-1980 WARHEAD SECTION GM PRACTICE LIGHTWEIGHT M252 PARTS AND ASSEMBLING《M252型轻量级导弹弹头零件实施零件的装配》.pdf_第1页
第1页 / 共7页
ARMY MIL-W-48369 (5)-1980 WARHEAD SECTION GM PRACTICE LIGHTWEIGHT M252 PARTS AND ASSEMBLING《M252型轻量级导弹弹头零件实施零件的装配》.pdf_第2页
第2页 / 共7页
ARMY MIL-W-48369 (5)-1980 WARHEAD SECTION GM PRACTICE LIGHTWEIGHT M252 PARTS AND ASSEMBLING《M252型轻量级导弹弹头零件实施零件的装配》.pdf_第3页
第3页 / 共7页
ARMY MIL-W-48369 (5)-1980 WARHEAD SECTION GM PRACTICE LIGHTWEIGHT M252 PARTS AND ASSEMBLING《M252型轻量级导弹弹头零件实施零件的装配》.pdf_第4页
第4页 / 共7页
ARMY MIL-W-48369 (5)-1980 WARHEAD SECTION GM PRACTICE LIGHTWEIGHT M252 PARTS AND ASSEMBLING《M252型轻量级导弹弹头零件实施零件的装配》.pdf_第5页
第5页 / 共7页
亲,该文档总共7页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-W-483b7 (5) 13 777770b 0427337 5 W MIL-W-48369 (AR) -. AMENDMENT 5 24 MARCH 1980 SUPERSEDING AMENDMENT 4 -3 s - . _. 8 July 1975 MILITARY SPECIFICATION WARHEAD SECTION, GM, PRACTICE LIGHTWEIGHT, M252 PARTS AND ASSEMBLING This Amendment forms a part of Military Specification MIL-W-48369 (AR) date

2、d 2 August 1974. PAGE 1 * a. 2.1, Specifications, Military. - Change “MIL-1-6866“ to “MIL-1-6868“. * b. 2.1, Specifications, Military. - Add the following: “MIL-1-6866 - Inspection Penetrant Method of“ “MIL-E-52798 - Enamel, Alkyd, Camouflage“ PAGE 2 C. 2.1, Drawings. - Delete drawing number 9216690

3、 and its description in its entirety and substitute: “9293497 - Packing and Marking for Shipping and Storage Container for Lance Warhead Section, GM, Practice, Lightweight, M252, M252El“. * d. 2.1, Drawings. - Change “Picatinny Arsenal“ to “U.S. Army Armament Research and Development Command“ * e. 2

4、1, Drawings, Product and Package Drawings, Add the follow i ng : “9287702 - Packing and Marking for Shipping and Storage. Container, XM612 for Warhead Section, GM, - Practice: Lightweight, M252“ _. -. FSC: 1340 , Provided by IHSNot for ResaleNo reproduction or networking permitted without license f

5、rom IHS-,-,-I_ _I_ MIL-W-8364 (5) 13 9979906 0427338 i 6 MIL-W-48369 (AR) AMENDMENT 5 f. 2.1, Drawings, Inspection Equipment Drawings. - Add the following: . . . I9276305 Test Panel 9266433 Operating Instructions“ “11430988 Instruction Tag, Warhead Gage for Missile Interface MS 100.00“ 11430220 Gage

6、 Assembly, Acceptance, Warhead Interface, * g. 2.2, Other publications. - Add the following: “ASTM E 376-69 - Measuring Coating Thickness by Magnetic Field or Eddy-Current (Elec tr o-Magne tic) Test Methods (Application for copies should be addressed to: American Society for Testing and Materials, 1

7、016 Race St, Philadelphia, Pa., 19103) I( * h. 3.1.1 - Insert the complete paragraph as follows: 3.1.1 Camouflage Paint - The camouflage paint shall comply with a11 requirements specified in MIL-E-52798“. PAGE 3 i. 3.7 - Delete in its entirety. j. 3.8 - Insert the complete paragraph as follows: “3.8

8、 Mechanical Interface of Warhead Section at Aft End. Sta. 100. - The Warhead Section, Aft End, shall be capable of Interfacing. with related components as determined by proper assembly to Warhead Interface Gage #11430220 in accordance with associated operating instructions #11430988.“ PAGE 36 k. 4.4

9、2.24, Major 102 - Change: “Electrical Interface of IWO2 cable assembly and fuze - 100% - 3.7 - Test“ to “Electrical interface of IWO2 cable assembly and fuze - 100% - 3.2 - 4.5.10, 9276305 and 9266433“. * 1. 4.4.2.24, Major 113 - Change: “Warhead missing,. To “Fuze missing .I1 Page 2 of 7 Provided

10、by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-48369 (AR) AMENDMENT 5 m. 4.4.2.24 - Add the following: “122. Interface of 100% 3.8 Aft End Improper 11430220/ 114 3 O 9 8 8 * n. 4.4.2.24 - Add the following: “123. Thickness of 100% 3.1.1/ Cert. of camou

11、flage paint 3.2 Compliance/ Test (4.5.11) 205. Protective cover/ 0.65% 3.2 Visual Flag Assembly missing PAGE 39 o. 4.4.2.26, In Title Block - Change “,.Center“ to . .Container. .I . * p. 4.4.2.27 - Insert the complete paragraph per the attached sheet. * q. 4.4.2.28 - Insert the complete paragraph pe

12、r the attached sheet. PAGE 41 r. 4.5.10 - Insert the complete paragraph as follows: “4.5.10 Electrical Interface of IWO2 Cable Assembly and Fuze. - The Warhead Section shall be subjected to this test using approved test equipment. This is a non-destructive test. Assemblies subjected to this test, if

13、 a-ccepl2hle , shall be returned to the lot“. * S. 4.5.11 - Insert the complete paragraph as follows: 4.5.11 Camouflage Paint Thickness - The camouflage paint thickness of the warhead shall be tested in accordance with ASTM E-376-69, using a dry film (non-destructive) type meter. The primer thicknes

14、s shall be measured prior bo applying the camouflage paint. These measurement locations shall be noted dimensionally and recorded so subsequent camouflage paint thickness measurements are in the same area. Camouflage paint thickness shall be measured at a minimum of five (5) randomly selected points

15、 on the exterior. I Page 3 of 7. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-w-48369 (AR) AMENDMENT 5 * t. 5.1.1 - Change to read as follows: “.Packaged in accordance with Dwg. 9293497, as applicable, by contract. (See 6.2) * u. 5.1.2 - Inser

16、t the complete paragraph as follows: packaged in accordance with Dwg. 9287702, as applicable, by contract. (See 6.2)“. * v. 5.2.1 - Change to read as follows: “.as specified in 5.1.1, shall be packed in accordance with Dwg. 9293497, as applicable, by contract. (See 6.2) I. “5.1.2 LEVEL C. - The warh

17、ead shall be preserved and * w. 5.2.2 - Insert the complete paragraph as follows: “5.2.2 LEVEL C. - The warhead, preserved and packaged in 5.1.2, shall be packed in accordance with Dwg. 9287702, as applicable, by contract. (See 6.2)“. * x. 5.3 - Change to read as follows: contract and code. . . II “

18、with Dwg. 9293497, or 9287702, as applicable, by * y. 6.2 - Delete in its entirety and replace with the following: “6.2 Ordering Data - See MIL-A-48078 6.2.1 Procurement requirements: a. Level C packaging will be used solely for interplant shipment (From point of manufacture of warhead section to d

19、epot-conus/oconus) and storage. Field deployment will require re-packaging to Level A configuration. Level A requirements are available at the Depot Level.“ * z. 6.3 - Change to read as follows: “.Designs, in conformance with Data Item Description DI-R-1714 with Addendum 1, as required, to Commander

20、 U.S. Army Armament Research and Development Command, ATTN: DRDAR-QAR-I, Dover, N.J. 07801. . Page 4 of 7 ._ - _. _- - -_ I I I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-LI367 (5) 13 W 7779706 0427337 7 3i %i al II) !4 3i i II) 3 s Efi s

21、 & al O +i .I4 E ri Id c & al 4J 1 al84 W O& Ei i, Page 5 of 7 9 9. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. Page 6 of 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-4367 (5) 33 M 77

22、79706 0427343 7 . li MIL-W-48369 (AR) AMENDMENT. 5 * aa. 6.4 Drawings. - Drawings-listed in Section 2 of this specification under the heading US Army Armament Research and Development Command (ARRADCOM) may also include drawings prepared by, and identified as, Edgewood Arsenal, Frankford Arsenal, Ro

23、ck Island Arsenal or Picatinny Arsenal drawings. Technical data originally prepared by these activities is now under the congizance of ARRADCOM. * bb. “6.5 Changes from previous issue. - The margins of this specification are marked with an asterisk to indicate where changes (additions, modifications

24、 corrections, deletions) from the previous issue were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content

25、 irrespective of the marginal notations and relationship to the last previous issue“. Custodian: Army-AR Preparing Activity: Army-AR Project Number: 1340- A582 Page 7 of 7 *US. 0 OVE RNM ENT PA INTI NO OFF ICE: 1960-603-1 21 / 2924 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1