ARMY UFGS-23 40 00 00 10-2006 CHEMICAL BIOLOGICAL AND RADIOLOGICAL (CBR) AIR FILTRATION SYSTEM《化学 生物和放射(CBR)方面空气过滤系统》.pdf

上传人:testyield361 文档编号:449652 上传时间:2018-11-16 格式:PDF 页数:21 大小:76.41KB
下载 相关 举报
ARMY UFGS-23 40 00 00 10-2006 CHEMICAL BIOLOGICAL AND RADIOLOGICAL (CBR) AIR FILTRATION SYSTEM《化学 生物和放射(CBR)方面空气过滤系统》.pdf_第1页
第1页 / 共21页
ARMY UFGS-23 40 00 00 10-2006 CHEMICAL BIOLOGICAL AND RADIOLOGICAL (CBR) AIR FILTRATION SYSTEM《化学 生物和放射(CBR)方面空气过滤系统》.pdf_第2页
第2页 / 共21页
ARMY UFGS-23 40 00 00 10-2006 CHEMICAL BIOLOGICAL AND RADIOLOGICAL (CBR) AIR FILTRATION SYSTEM《化学 生物和放射(CBR)方面空气过滤系统》.pdf_第3页
第3页 / 共21页
ARMY UFGS-23 40 00 00 10-2006 CHEMICAL BIOLOGICAL AND RADIOLOGICAL (CBR) AIR FILTRATION SYSTEM《化学 生物和放射(CBR)方面空气过滤系统》.pdf_第4页
第4页 / 共21页
ARMY UFGS-23 40 00 00 10-2006 CHEMICAL BIOLOGICAL AND RADIOLOGICAL (CBR) AIR FILTRATION SYSTEM《化学 生物和放射(CBR)方面空气过滤系统》.pdf_第5页
第5页 / 共21页
亲,该文档总共21页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 40 00.00 10 (October 2006)-Preparing Activity: USACE SupersedingUFGS-23 40 00.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR CO

2、NDITIONINGSECTION 23 40 00.00 10CHEMICAL, BIOLOGICAL, AND RADIOLOGICAL (CBR) AIR FILTRATION SYSTEM10/06PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 General1.2.2 Structural Design1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 General1.4.2 Welding1.5 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS

3、2.1 STANDARD PRODUCTS2.2 NAMEPLATES2.3 FILTRATION SYSTEM HOUSING2.3.1 Filtration Element Access Door2.3.2 Filtration Element Sealing Mechanism2.3.3 Casings and Insulation2.3.4 Housing Man-Entry Doors2.4 FILTRATION ELEMENTS2.4.1 Roughing Filter2.4.2 Pre-filter and Post-filter2.4.3 High-Efficiency Par

4、ticulate Air (HEPA) Filter2.4.4 Carbon Adsorber2.4.4.1 Airflow Resistance2.4.4.2 Refrigerant Leak Test2.4.4.3 Dimethylmethylphosphonate (DMMP) Breakthrough Life Test2.4.4.4 Moisture Content/Cyanogen Chloride (CK) Gas Life Sampling2.4.4.5 Moisture Content2.4.4.6 CK Gas Life Test2.4.5 Gasket Seal2.4.6

5、 Fluid Seal2.5 BAG-IN/BAG-OUT ASSEMBLY AND BANDING KITS2.6 IN-PLACE DOP/GAS AEROSOL TEST SECTIONSECTION 23 40 00.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.7 IN-PLACE TEST REPORT2.8 WEATHER COVER2.9 ISOLATION DAMPERS2.9.1 Electrica

6、lly and Manually Actuated Isolation Damper Operators2.9.2 Fan Unit2.9.3 Flexible Duct Connectors2.10 DUCTWORK AND DUCT TRANSITIONS2.11 THERMAL INSULATION2.12 PRESSURE GAUGE2.13 PRESSURE PORTSPART 3 EXECUTION3.1 INSTALLATION AND ERECTION3.2 ACCEPTANCE TESTS3.2.1 Visual Inspection3.2.2 Housing Leak an

7、d Pressure Test3.2.3 Airflow Capacity and Distribution Test3.2.4 Air-Aerosol Mixing Uniformity Test3.2.5 Damper Operation and Leakage Test3.2.6 System Bypass Test (Filter and Adsorber Mounting Frame)3.3 FIELD TRAINING3.4 FIELD ACCEPTANCE TEST- End of Section Table of Contents -SECTION 23 40 00.00 10

8、 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 40 00.00 10 (October 2006)-Preparing Activity: USACE SupersedingUFGS-23 40 00.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in ag

9、reement with UMRL dated July 2010*SECTION 23 40 00.00 10CHEMICAL, BIOLOGICAL, AND RADIOLOGICAL (CBR) AIR FILTRATION SYSTEM10/06*NOTE: This guide specification covers the requirements for chemical, biological, and radiological air filtration systems.Edit this guide specification for project specific

10、requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are w

11、elcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1

12、REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference f

13、eature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update SECTION 23 40 00.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted withou

14、t license from IHS-,-,-the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent refe

15、renced. The publications are referred to within the text by the basic designation only.AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE)ASHRAE 52.1 (1992; Interpretation 1 2007) Gravimetric and Dust-Spot Procedures for Testing Air-Cleaning Devices Used in General Ven

16、tilation for Removing Particulate MatterASME INTERNATIONAL (ASME)ASME AG 1 (2009) Code on Nuclear Air and Gas TreatmentASME BPVC SEC IX (2010) BPVC Section IX-Welding and Brazing QualificationsASME N509 (2002; R 2008) Nuclear Power Plant Air-Cleaning Units and ComponentsASME N510 (2007) Testing of N

17、uclear Air - Treatment SystemsASME NQA-1 (2008; Addenda a 2009) Quality Assurance Requirements for Nuclear Facility ApplicationsASTM INTERNATIONAL (ASTM)ASTM A 240/A 240M (2009c) Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and

18、for General ApplicationsASTM D 1056 (2007) Standard Specification for Flexible Cellular Materials - Sponge or Expanded RubberASTM D 2867 (2009) Moisture in Activated CarbonASTM E 283 (2004) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressur

19、e Differences Across the SpecimenINSTITUTE OF ENVIRONMENTAL SCIENCES AND TECHNOLOGY (IEST)IEST RP-CC-001.3 (1993) HEPA and ULPA FiltersSECTION 23 40 00.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-IEST RP-CC-008 (1984) Gas-Phase Adsorb

20、er CellsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 701 (2010) Standard Methods of Fire Tests for Flame Propagation of Textiles and FilmsU.S. DEPARTMENT OF DEFENSE (DOD)MIL-DTL-32101A (2006) Carbon, Activated, Impregnated, Copper-silver-Zinc-Molybdenum-Triethylenediamine (ASZM-TEDA)MIL-PRF-32016

21、 (2002; Rev A) Cell, Gas Phase, AdsorberMIL-STD-282 (1995; Basic, Notice 4) Filter Units, Protective Clothing, Gas-Mask Components and Related Products: Performance-Test MethodsU.S. DEPARTMENT OF ENERGY (DOE)DOE HDBK-1169 (2003) Nuclear Air Cleaning HandbookUNDERWRITERS LABORATORIES (UL)UL 586 (2009

22、) Standard for High-Efficiency Particulate, Air Filter UnitsUL 723 (2008) Test for Surface Burning Characteristics of Building MaterialsUL 900 (2004; R 1995 thru 2009) Standard for Air Filter Units1.2 SYSTEM DESCRIPTION1.2.1 Generala. Provide ductwork, fittings, and accessories as required to provid

23、e a complete installation and to eliminate interference with other construction. The CBR Air Filtration System shall include ASTM A 240/A 240M Type 304 stainless steel bag-in/bag-out housing, isolation dampers located where indicated, roughing filter, pre-filter, HEPA filters, carbon adsorbers, post

24、-filter, in-place test sections, and a blow-through draw-through fan unit mounted on a structural steel equipment skid as indicated. Provide the filtration system with filtration element removal trays, removable access doors, filtration element banding kits, pressure ports, pressure gauges, duct tra

25、nsitions, flexible connections, test blanks, and other appurtenances required for the specified operation.b. The filtration system shall have physical dimensions suitable to fit the space allotted. Sections of the filtration system shall be joined together in series to make a system that meets the r

26、equired capacity. The filtration system shall be mechanically tested for leaks while in the factory.SECTION 23 40 00.00 10 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-c. The filtration system shall be suitable for continuous operation with

27、an air stream temperature of up to 57.2 degrees C 135 degrees F and suitable for radioactive and chemical warfare service. The system shall also meet the applicable requirements of ASME AG 1, ASME N509, ASME N510, and UL 586. Systems located in temperature controlled areas that filter conditioned ai

28、r or low temperature ambient air shall be externally or internally insulated as indicated of double walled construction with thermal insulation in the interstitial space.1.2.2 Structural Design*NOTE: Seismic protection is required for filtration systems that perform a safety function during and afte

29、r a seismic event. Manufacturers standard equipment is normally considered qualified for the requirements specified below. Review ASME AG 1, Section AA-4000, and provide specific additional requirements for the design application.*Structurally design and test the filtration system, components, and a

30、ccessories and submit appropriate documentation and certification as required by ASME AG 1 Section AA. The service condition of the filtration system shall meet level A B C D service limits with the design loads indicated. The structural design of the filtration system, components, and accessories s

31、hall be verified by analysis, testing, or a combination of analysis and testing. The filtration system shall be subjected to 5 _ operating based earthquakes (OBE) and one safe shutdown earthquake (SSE) as indicated by the required response spectrum. Each OBE and SSE shall have a minimum test duratio

32、n of 30 _ seconds. The filtration system, components, and accessories shall meet the seismic protection requirements specified in UFC 3-310-04 SEISMIC DESIGN FOR BUILDINGS and Section 13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT.1.3 SUBMITTALS*NOTE: Review submittal description (SD) defin

33、itions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approv

34、al. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requir

35、ing Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident SECTION 23 40 00.00 10 Page 6Provided by IHSNot for ResaleNo reproduction or

36、networking permitted without license from IHS-,-,-Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “

37、G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designatio

38、n are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsCBR Air Fi

39、ltration System; G; G, _Installation and Erection; G; G, _Drawings consisting of equipment layout including assembly and installation details and electrical connection diagrams; ductwork layout showing the location of all supports, typical support details, gauge reinforcement, reinforcement spacing

40、rigidity classification, and static pressure and seal classifications; and pressure gage tubing layout showing the location of all gages. Drawings shall include table and/or schematic identifying outline or significant interface dimensions and any information required to demonstrate that the system

41、has been coordinated and will properly function as a unit and shall show equipment relationship to other parts of the work, including clearances required for operation and maintenance.SD-03 Product DataStandard ProductsStatement demonstrating successful completion of similar services on at least fiv

42、e projects of similar size and scope, at least 2 weeks prior to submittal of other items required by this section. Manufacturers catalog data shall be included for the specified items. The data shall be highlighted to show model, size, options, etc., that are intended for consideration.Welding; G; G

43、, _A copy of qualified welding procedures, at least 2 weeks prior to the start of welding operations. A list of names and identification symbols of qualified welders and welding operators, at least 2 weeks prior to the start of welding operations.Acceptance TestsA copy of the test procedures, at lea

44、st 2 weeks prior to testing.SECTION 23 40 00.00 10 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Factory Tests; G; G, _.Proposed schedule for factory tests, at least 2 weeks prior to the start of related tests.Field TrainingProposed schedule

45、for field training, at least 2 weeks prior to the start of related field training.SD-06 Test ReportsAcceptance TestsCertified test report for adsorbent filtration type. Test reports for filtration unit factory acceptance test, filtration unit field test, isolation damper acceptance test, air-aerosol mixing uniformity test, damper operation and leakage test, housing leak and pressure test, system bypass test, and performance tests in booklet form, upon completion of testing. Reports

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1