ARMY UFGS-32 01 26 71-2008 GROOVING FOR AIRFIELD PAVEMENTS《机场路面挖槽》.pdf

上传人:progressking105 文档编号:449711 上传时间:2018-11-16 格式:PDF 页数:6 大小:37.95KB
下载 相关 举报
ARMY UFGS-32 01 26 71-2008 GROOVING FOR AIRFIELD PAVEMENTS《机场路面挖槽》.pdf_第1页
第1页 / 共6页
ARMY UFGS-32 01 26 71-2008 GROOVING FOR AIRFIELD PAVEMENTS《机场路面挖槽》.pdf_第2页
第2页 / 共6页
ARMY UFGS-32 01 26 71-2008 GROOVING FOR AIRFIELD PAVEMENTS《机场路面挖槽》.pdf_第3页
第3页 / 共6页
ARMY UFGS-32 01 26 71-2008 GROOVING FOR AIRFIELD PAVEMENTS《机场路面挖槽》.pdf_第4页
第4页 / 共6页
ARMY UFGS-32 01 26 71-2008 GROOVING FOR AIRFIELD PAVEMENTS《机场路面挖槽》.pdf_第5页
第5页 / 共6页
亲,该文档总共6页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 26.71 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 26 71 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 26.7

2、1GROOVING FOR AIRFIELD PAVEMENTS08/08PART 1 GENERAL1.1 SYSTEM DESCRIPTION1.1.1 Grooving Machine1.1.2 Water Supply1.2 SUBMITTALS1.3 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS (Not Applicable)PART 3 EXECUTION3.1 PREPARATION3.1.1 Existing Pavements3.1.2 New Pavements3.2 GROOVING3.2.1 Procedures3.2.2 Cle

3、an-Up3.2.3 Repair of Damaged Pavement- End of Section Table of Contents -SECTION 32 01 26.71 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 26.71 (August 2008)-Preparing Activity: USACE SupersedingUFG

4、S-32 01 26 71 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 01 26.71GROOVING FOR AIRFIELD PAVEMENTS08/08*NOTE: This guide specification covers the requirements for providing grooves in airfield pavements to increase the safe perfo

5、rmance of aircraft.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets

6、are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS shou

7、ld be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: If an active runway is to be grooved, allowances such as Contractor reaction time, minimum distance equipment must be removed from the runway, and an estimated cost to the Contractor for each interruption must be addressed.If u

8、nit prices are used, the following are designer options:The unit of measurement for grooving the runway taxiway surface will be the lump sum. The unit of measurement for aircraft traffic interruptions will be each.SECTION 32 01 26.71 Page 2Provided by IHSNot for ResaleNo reproduction or networking p

9、ermitted without license from IHS-,-,-A lump sum price will be paid for grooving and cleaning the pavement. The minimum payment for each interruption will be one hour.*1.1 SYSTEM DESCRIPTION1.1.1 Grooving MachineProvide a grooving machine of a type equipped with diamond-saw cutting blades, and capab

10、le of making at least 457 mm 18 inches in width of multiple parallel grooves in one pass of the machine. Thickness of the cutting blades shall be capable of making the required width and depth of grooves in one pass of the machine. The cutting head shall not contain a mixture of new and worn blades

11、or blades of unequal wear or diameter. The wheels on the grooving machine shall be of a design that will not scar or spall the pavement. Provide the machine with devices to control depth of groove and alignment within the specified tolerances.1.1.2 Water Supply*NOTE: If transportation of the water b

12、y surface laid pipe is permitted, routing of the pipe should be shown.*Water for the grooving operation shall be provided by the Contractor Government. The water source will be described on the drawings so the Contractor can determine what Equipment will be required and the transportation means to t

13、he job.1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a sub

14、mittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently i

15、mportant or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management

16、 System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the SECTION 32 01 26.71 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-District Office); “AO“ for Area Office; “RO“ for Res

17、ident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittal

18、s with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Sec

19、tion 01 33 00 SUBMITTAL PROCEDURES:SD-03 Product DataEquipmentList of proposed equipment to be used in performance of construction work, including descriptive data.1.3 ENVIRONMENTAL REQUIREMENTSGrooving operations will not be permitted when freezing conditions prevent the immediate removal of debris

20、 and/or drainage of water from the grooved area.PART 2 PRODUCTS (Not Applicable)PART 3 EXECUTION3.1 PREPARATION*NOTE: Limits of the grooved area should be as described in UFC 3-260-01. For Army airfields, grooving should not be allowed within the first 457 m (1,500 feet) from the thresholds or the f

21、irst 152 m (500 feet) either side of an arrest barrier cable which requires hook engagement for operation. For Air Force airfields, grooving will be allowed in the first 457 m (1,500 feet) from thresholds and within 91.4 m (300 feet) of arrest barrier cables.Normally, pavements of Army airfields are

22、 not grooved within the first 457 m (1,500 feet) of the thresholds; permission from the Corps of Engineers Division office must be obtained to groove this area of joint occupied airfields.Figures 2-10 and 2-11 of -FAAAC 150/5320-12A- show examples of saw-cut step patterns at the intersection of seco

23、ndary runways and exit taxiways to primary runways, respectively.Characteristics of the existing pavement will be SECTION 32 01 26.71 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-described in sufficient detail to allow the Contractor to sele

24、ct the most economical and effective cutting blades for grooving the pavement.*3.1.1 Existing PavementsBumps, depressed areas, bad or faulted joints, and badly cracked and/or spalled areas in the pavement shall not be grooved until such areas are adequately repaired or replaced, as specified in Sect

25、ion _. If the existing pavement is not suitable because of its strength, an overlay, flexible or rigid, will be required using the procedures specified in Section _.3.1.2 New PavementsAllow new asphalt concrete pavements to cure for a minimum of 30 days before grooving, to allow the material to beco

26、me stable enough to prevent closing of the grooves under normal use. Permit new portland cement concrete pavements to cure for a minimum of 28 days before grooving.3.2 GROOVING3.2.1 Procedures*NOTE: Grooving should be terminated within 1.5 m (5 feet) of the pavement edge to allow adequate space for

27、operation of the grooving equipment.*Cut grooves in the asphalt portland cement areas as indicated on the drawings. Begin the grooving at one side of the usable runway taxiway and continue for the full width of the area. Take all reasonable precautions to prevent damage to or roughening of the pavem

28、ent between grooves. Spalling along or tearing or raveling of the groove edges shall not be allowed. The grooves shall be 6 mm 1/4 inch plus or minus 1.2 mm 1/16 inch wide by 6 mm 1/4 inch plus or minus 1.2 mm 1/16 inch deep and 38 mm 1-1/2 inches plus or minus 3 mm 1/8 inch center to center spacing

29、. The groove length shall be _ meters feet plus or minus 75 mm 3 inches long and normal to the longitudinal axis of the centerline of the runway taxiway. The transverse alignment of the grooves shall not vary more than75 mm 3 inches plus or minus on a 23 m 75 foot length of grooving.3.2.2 Clean-UpCl

30、ean-up shall be continuous. Flush debris produced by the machine to the edge of the grooved area or pick it up as it forms. The dust coating remaining shall be flushed to the edge of the area if the resultant accumulation is not detrimental to the vegetation or storm drainage system. Accomplish all

31、flushing operations in a manner to prevent erosion on the shoulders.3.2.3 Repair of Damaged PavementRepair at the Contractors expense, and as specified in Section _, any damage, which in the opinion of the Contracting Officer will be detrimental to aircraft tires, occurring to the pavement as a result of the grooving operations.SECTION 32 01 26.71 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- End of Section -SECTION 32 01 26.71 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-