ARMY UFGS-32 11 16-2008 [BASE COURSE FOR RIGID][ AND ][SUBBASES FOR FLEXIBLE] PAVING《(刚性路面的基层)(和)(柔性路面基底层)的铺装》.pdf

上传人:orderah291 文档编号:449715 上传时间:2018-11-16 格式:PDF 页数:17 大小:71.69KB
下载 相关 举报
ARMY UFGS-32 11 16-2008 [BASE COURSE FOR RIGID][ AND ][SUBBASES FOR FLEXIBLE] PAVING《(刚性路面的基层)(和)(柔性路面基底层)的铺装》.pdf_第1页
第1页 / 共17页
ARMY UFGS-32 11 16-2008 [BASE COURSE FOR RIGID][ AND ][SUBBASES FOR FLEXIBLE] PAVING《(刚性路面的基层)(和)(柔性路面基底层)的铺装》.pdf_第2页
第2页 / 共17页
ARMY UFGS-32 11 16-2008 [BASE COURSE FOR RIGID][ AND ][SUBBASES FOR FLEXIBLE] PAVING《(刚性路面的基层)(和)(柔性路面基底层)的铺装》.pdf_第3页
第3页 / 共17页
ARMY UFGS-32 11 16-2008 [BASE COURSE FOR RIGID][ AND ][SUBBASES FOR FLEXIBLE] PAVING《(刚性路面的基层)(和)(柔性路面基底层)的铺装》.pdf_第4页
第4页 / 共17页
ARMY UFGS-32 11 16-2008 [BASE COURSE FOR RIGID][ AND ][SUBBASES FOR FLEXIBLE] PAVING《(刚性路面的基层)(和)(柔性路面基底层)的铺装》.pdf_第5页
第5页 / 共17页
亲,该文档总共17页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 16 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 16 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 11 16BASE COU

2、RSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.1.1 Area1.1.1.2 Volume1.1.1.3 Weight1.1.2 Payment1.1.2.1 Course Material1.1.2.2 Stabilization1.1.3 Waybills and Delivery Tickets1.2 REFERENCES1.3 DEFINITION1.4 SYSTEM DESCRIPTION1.5 SUBMITTALS1.6 QUA

3、LITY ASSURANCE1.6.1 Sampling1.6.2 Tests1.6.2.1 Sieve Analysis1.6.2.2 Liquid Limit and Plasticity Index1.6.2.3 Moisture-Density Determinations1.6.2.4 Field Density Tests1.6.2.5 Wear Test1.6.2.6 Weight of Slag1.6.3 Testing Frequency1.6.3.1 Initial Tests1.6.3.2 In-Place Tests1.6.4 Approval of Material1

4、.7 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 MATERIALS2.1.1 Subbase Course2.1.2 Select-Material Subbase CourseSECTION 32 11 16 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.3 Rigid Pavement Base CoursePART 3 EXECUTION3.1 OPERATION OF A

5、GGREGATE SOURCES3.2 STOCKPILING MATERIAL3.3 PREPARATION OF UNDERLYING MATERIAL3.4 GRADE CONTROL3.5 MIXING AND PLACING MATERIALS3.6 LAYER THICKNESS3.7 COMPACTION3.8 PROOF ROLLING3.9 EDGES3.10 SMOOTHNESS TEST3.11 THICKNESS CONTROL3.12 MAINTENANCE- End of Section Table of Contents -SECTION 32 11 16 Pag

6、e 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 16 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 16 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL

7、 dated July 2008*SECTION 32 11 16BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING08/08*NOTE: This guide specification covers the requirements for subbase, select-material subbase and rigid base courses for airfield pavements, roads and streets.Edit this guide specification for project specific

8、 requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are

9、welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NO

10、TE: This guide specification is applicable to subbase courses for airfield pavements, roads and streets including select-material subbase courses in the lower levels of the pavement structure. This specification will be used for any subbase course that has a design California bearing ratio (CBR) bet

11、ween 20 and 50 or any select-material with design CBR less than 20. Select material subbase will not require processing or blending.This specification may also be used for:SECTION 32 11 16 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a. The

12、base course directly beneath the bituminous surface of a pavement design for Class E and F roads and streets where the required CBR value of the material is 50 or more and the material conforms to Gradation No. 1.b. The base course beneath rigid pavements.When this guide specification is used for ag

13、gregate base course under rigid pavement, section title of the project specification will be: BASE COURSE FOR RIGID PAVING and the words “rigid pavement base course“ selected throughout. When this guide specification is used in combination for a subbase course under flexible pavements and a base cou

14、rse under rigid pavements, the section title will be: BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING and the words “or rigid pavement base course“ will be included after “subbase“ throughout.*1.1 UNIT PRICES*NOTE: Delete unit price paragraphs when the work is covered by a lump-sum contract p

15、rice.*1.1.1 Measurement*NOTE: Delete the method of measurement paragraph not applicable to job conditions. The provision for placing in stockpiles will be retained or deleted as applicable.*1.1.1.1 AreaMeasure the quantity of subbase and select-material subbase or rigid pavement base course complete

16、d and accepted, as determined by the Contracting Officer, in square meters yards.1.1.1.2 VolumeMeasure the quantity of subbase and select-material subbase or rigid pavement base course completed and accepted, as determined by the Contracting Officer, in cubic meters yards. Determine the volume of ma

17、terial in-place and accepted by the average job thickness obtained in accordance with paragraph THICKNESS CONTROL and the dimensions shown.1.1.1.3 WeightThe tonnage of subbase and select-material subbase or rigid pavement base course material will be the number of metric tons tons of aggregate, plac

18、ed and accepted in the completed course in authorized stockpiles as determined by the Contracting Officer. Deductions will be made for any material wasted, unused, rejected, or used for convenience of the Contractor, and for water exceeding specified amount at time of SECTION 32 11 16 Page 4Provided

19、 by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-weighing.1.1.2 Payment1.1.2.1 Course MaterialQuantities of subbase and select-material subbase or rigid pavement base course, determined as specified in paragraph Measurement, will be paid for at the respective

20、 contract unit prices, which will constitute full compensation for the construction and completion of the subbase and select-material subbase or rigid pavement base course.1.1.2.2 StabilizationCohesionless subgrades or select subbase courses to be stabilized, as specified in paragraph PREPARATION OF

21、 UNDERLYING MATERIAL, will be paid as a special item on the tonnage basis including extra manipulation as required.1.1.3 Waybills and Delivery TicketsSubmit copies of waybills and delivery tickets during the progress of the work.1.2 REFERENCES*NOTE: This paragraph is used to list the publications ci

22、ted in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article

23、 to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the

24、 publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)AASHTO T 180 (2001; R 2004) Mois

25、ture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and an 457-mm (18-in) DropAASHTO T 224 (2001; R 2004) Correction for Coarse SECTION 32 11 16 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Particles in the Soil Compaction TestAST

26、M INTERNATIONAL (ASTM)ASTM C 117 (2004) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by WashingASTM C 131 (2006)Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles MachineASTM C 136 (

27、2006) Standard Test Method for Sieve Analysis of Fine and Coarse AggregatesASTM C 29/C 29M (2007) Standard Test Method for Bulk Density (“Unit Weight“) and Voids in AggregateASTM D 1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone MethodASTM D 1557 (2007) Standard Test Methods fo

28、r Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)ASTM D 2167 (1994; R 2001) Density and Unit Weight of Soil in Place by the Rubber Balloon MethodASTM D 2487 (2006) Soils for Engineering Purposes (Unified Soil Classification System)ASTM D 422 (19

29、63; R 2007) Particle-Size Analysis of SoilsASTM D 4318 (2005) Liquid Limit, Plastic Limit, and Plasticity Index of SoilsASTM D 6938 (2007a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)ASTM D 75 (2003) Standard Practice for

30、Sampling AggregatesASTM E 11 (2004) Wire Cloth and Sieves for Testing Purposes1.3 DEFINITIONDegree of compaction required is expressed as a percentage of the maximum laboratory dry density obtained by the test procedure presented in ASTM D 1557 abbreviated as a percent of laboratory maximum dry dens

31、ity. One exception is as follos: Since ASTM D 1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 9.0 mm 3/4 inch sieve, the degree of compaction for material having more than 30 SECTION 32 11 16 Page 6Provided by IHSNot for ResaleNo reproduction or n

32、etworking permitted without license from IHS-,-,-percent by weight of their particles retained on the 9.0 mm 3/4 inch sieve will be expressed as a percentage of the laboratory maximum dry density in accordance with AASHTO T 180 Method D and corrected with AASHTO T 224.1.4 SYSTEM DESCRIPTION*NOTE: If

33、 desirable, requirements for types of equipment applicable to methods of construction based on local conditions will be included.*All plant, equipment, and tools used in the performance of the work will be subject to approval before the work is started and shall be maintained in satisfactory working

34、 condition at all times. Provide equipment which is adequate and has the capability of producing the required compaction, meeting grade controls, thickness control, and smoothness requirements as set forth herein.1.5 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00

35、SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are alr

36、eady marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on

37、Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division

38、 or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the seco

39、nd bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office that will re

40、view the submittal for the SECTION 32 11 16 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-03 Product DataEquipmentList of proposed equipment to be us

41、ed in performance of construction work, including descriptive data.Waybills and Delivery TicketsCopies of waybills and delivery tickets during the progress of the work.SD-06 Test ReportsSampling and TestingField Density TestsCertified copies of test results for approval not less than 30 _ days befor

42、e material is required for the work.Calibration curves and related test results prior to using the device or equipment being calibrated.Copies of field test results within 24 _ hours after the tests are performed.1.6 QUALITY ASSURANCESampling and testing are the responsibility of the Contractor, to

43、be performed by an approved testing laboratory in accordance with Section 01 45 01 USACE QUALITY CONTROL. Perform tests at the specified frequency. No work requiring testing will be permitted until the testing laboratory has been inspected and approved. Test the materials to establish compliance with the specified requirements.1.6.1 SamplingTake samples for laboratory testing in conformance with ASTM D 75. When deemed necessary, the sampling will be observed by the Contracting Officer.1.6.2 Tests1.6.2.1 Sieve Analysis*NOTE: Testing in accordance with ASTM D 42