ASTM C1037-1985(2002) Standard Practice for Inspection of Underground Precast Concrete Utility Structures《公用事业用地下预制混凝土的检验的标准实施规程》.pdf

上传人:arrownail386 文档编号:463117 上传时间:2018-11-27 格式:PDF 页数:2 大小:22.04KB
下载 相关 举报
ASTM C1037-1985(2002) Standard Practice for Inspection of Underground Precast Concrete Utility Structures《公用事业用地下预制混凝土的检验的标准实施规程》.pdf_第1页
第1页 / 共2页
ASTM C1037-1985(2002) Standard Practice for Inspection of Underground Precast Concrete Utility Structures《公用事业用地下预制混凝土的检验的标准实施规程》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: C 1037 85 (Reapproved 2002)Standard Practice forInspection of Underground Precast Concrete UtilityStructures1This standard is issued under the fixed designation C 1037; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, t

2、he year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the inspection of undergroundprecast concrete utility structures designed and manufac

3、turedin accordance with Practice C 857 and Specification C 858.1.2 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applic

4、a-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:C 31 Practice for Making and Curing Concrete Test Speci-mens in the Field2C 39 Test Method for Compressive Strength of CylindricalConcrete Specimens2C 857 Practice for Minimum Structural Design Loading forUnder

5、ground Precast Concrete Utility Structures3C 858 Specification for Underground Precast Concrete Util-ity Structures33. Terminology3.1 Description of Term Specific to This Standard:3.2 inspectoras used in this practice, an individual as-signed by the manufacturer or by the purchaser to perform aninsp

6、ection.4. Manufacturers Responsibility4.1 The manufacturer shall develop and use an effectivequality control program that shall include material controls,tests, and inspections as agreed upon between manufacturerand purchaser throughout the fabrication process.4.2 The manufacturers inspection record

7、s and associatedtest data shall be made available to the inspector.4.3 The manufacturer shall notify the inspector of anychanges in material, method of fabrication, or quality controlprocedure.4.4 The manufacturer shall designate an individual as liai-son to the inspector. He will sign the inspectio

8、n activity reports,and when necessary, will be available to the inspector todiscuss matters pertaining to inspection, fabrication, and qual-ity control.4.5 The manufacturer shall prepare sufficient concrete testcylinders to meet the purchasers requirements for compressivestrength. Test cylinders sha

9、ll be prepared in accordance withPractice C 31 and tested in accordance with Test Method C 39.Results shall be entered in an inspection activity report.4.6 The manufacturer, upon request, shall assemble (withoutgrout) selected concrete component sections to form a com-plete structure assembly to det

10、ermine that fit-up requirementsare as specified.4.7 The manufacturer shall provide marking according topurchaser requirements or according to Specification C 858.5. Inspectors Responsibility5.1 The inspector shall familiarize himself with the manu-facturers quality control program.5.2 The inspector

11、shall determine that the fabrication of theprecast units complies with drawings approved by the pur-chaser, including hardware and general requirements.5.3 The inspector shall immediately report to the purchaserand manufacturer any component parts, complete structures,etc., not in compliance.5.4 The

12、 inspector shall clearly indicate on the inspectionactivity report any fabrication problems encountered andsolutions utilized.6. Inspection Procedure6.1 The inspector shall inspect forms, materials, and fabri-cated parts used in the product.6.2 During each inspection, the inspector shall examinecomp

13、lete units for all specified features that can be determinedby visual observation.6.3 The first section of each type of precast structure fromany set of forms shall be assembled by the manufacturerwithout grout and the inspector shall check that fit-up require-ments are as specified.1This practice i

14、s under the jurisdiction of ASTM Committee C27 on PrecastConcrete Products and is the direct responsibility of Subcommittee C27.10 onUtility Structures.Current edition approved April 26, 1985. Published July 1985.2Annual Book of ASTM Standards, Vol 04.02.3Annual Book of ASTM Standards, Vol 04.05.1Co

15、pyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.6.4 The inspector shall check that all materials conform torequirements of Specification C 858.7. Fabrication Inspection7.1 Reinforcing Steel:7.1.1 The inspector shall check all reinforcin

16、g steel todetermine that it has been covered by mill reports, with data inreports conforming to designated standard, and has not beendamaged. Material with kinks or bends not indicated onfabrication drawings shall not be used. Heating to bendmaterial is not permitted, as specified in Specification C

17、 858.7.1.2 All reinforcing steel shall be free of loose rust and asspecified in Specification C 858. A light film of red rust is notobjectionable, as specified in Specification C 858.7.1.3 Reinforcing steel shall be checked for size, spacing,proper bends, and lengths in accordance with the drawings.

18、7.2 Assembled Reinforcing Inspection:7.2.1 All material shall be properly spliced and locatedaccording to the drawings.7.2.2 Reinforcing steel shall be secured in such a mannerthat shifting will not occur during handling of the cage orplacing of concrete. All chairs, bolsters, braces, and spacers in

19、contact with form and reinforcing rod shall be of material thatwill not deteriorate. The cage shall be properly positioned inthe form to provide the specified concrete cover over the steel.7.2.3 The inspector shall check electrical ground connec-tions or any other special items as specified.7.3 Hard

20、ware Inspection:7.3.1 Hardware shall be inspected to ensure compliancewith purchasers specifications.7.3.2 Hardware shall be placed and securely fastened atdesignated locations to prevent shifting or movement duringconcrete placing.7.3.3 Threaded inserts and duct terminators shall be free ofconcrete

21、 and other foreign matter.7.4 Concrete Inspection:7.4.1 Concrete shall be placed to prevent segregation, voidsor honeycombed areas. Placing of concrete shall be observed toensure that it is being placed properly in accordance withapplicable standards.7.4.2 The inspector shall observe condition of co

22、ncrete afterthe forms are removed. Surfaces shall be sound. Patching andfinishing shall be permitted to remove minor honeycomb.Chips, voids, and through cracks shall be repaired by anacceptable method in accordance with Specification C 858.Extensive voids, chips, through cracks, or deep honeycombsha

23、ll be referred to the design engineer or purchasers engineerfor method of repair or acceptability.7.4.3 The inspector shall observe that specified curing isprovided.7.5 Dimensions InspectionThe inspector shall measurefor overall dimensions (that is, length, width, height, wallthickness, and squarene

24、ss, etc.) the first concrete section ofeach type produced from each form. The tolerances shallcomply to the finished product in accordance to SpecificationC 858.8. Tests8.1 The inspector shall check results of slump tests, ifspecified, for compliance to specifications.8.2 The inspector shall review

25、compressive strength data onproduct covered. If not to specified strength, the inspector shallhave concrete tested by method and manner agreed uponbetween the manufacturer and purchaser.9. Nonconforming Material9.1 Material found not to be in conformance with Specifi-cation C 858 shall be rejected u

26、nless acceptance is authorized.10. Evidence of Inspection and Reporting10.1 Inspection documents, etc., shall be in accordance withthe specifications.10.2 Inspection records on products completed and shippedbetween inspections need only be prepared at the purchasersrequest.ASTM International takes n

27、o position respecting the validity of any patent rights asserted in connection with any item mentionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own respon

28、sibility.This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed

29、to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the ad

30、dress shown below.This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org).C 10372

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1