BS ISO 3977-8-2002 Gas turbines - Procurement - Inspection testing installation and commissioning《燃气轮机 采购 检验、测试、安装和交付使用》.pdf

上传人:proposalcash356 文档编号:587212 上传时间:2018-12-15 格式:PDF 页数:20 大小:857.03KB
下载 相关 举报
BS ISO 3977-8-2002 Gas turbines - Procurement - Inspection testing installation and commissioning《燃气轮机 采购 检验、测试、安装和交付使用》.pdf_第1页
第1页 / 共20页
BS ISO 3977-8-2002 Gas turbines - Procurement - Inspection testing installation and commissioning《燃气轮机 采购 检验、测试、安装和交付使用》.pdf_第2页
第2页 / 共20页
BS ISO 3977-8-2002 Gas turbines - Procurement - Inspection testing installation and commissioning《燃气轮机 采购 检验、测试、安装和交付使用》.pdf_第3页
第3页 / 共20页
BS ISO 3977-8-2002 Gas turbines - Procurement - Inspection testing installation and commissioning《燃气轮机 采购 检验、测试、安装和交付使用》.pdf_第4页
第4页 / 共20页
BS ISO 3977-8-2002 Gas turbines - Procurement - Inspection testing installation and commissioning《燃气轮机 采购 检验、测试、安装和交付使用》.pdf_第5页
第5页 / 共20页
亲,该文档总共20页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、BRITISH STANDARD BS ISO 3977-8:2002 Gas turbines Procurement Part 8: Inspection, testing, installation and commissioning ICS 27.040 BS ISO 3977-8:2002 This British Standard, having been prepared under the direction of the Engineering Sector Policy and Strategy Committee, was published under the auth

2、ority of the Standards Policy and Strategy Committee on 25 September 2002 BSI 25 September 2002 ISBN 0 580 40411 0 National foreword This British Standard reproduces verbatim ISO 3977-8:2002 and implements it as the UK national standard. The UK participation in its preparation was entrusted to Techn

3、ical Committee MCE/16, Gas turbines, which has the responsibility to: A list of organizations represented on this committee can be obtained on request to its secretary. Cross-references The British Standards which implement international publications referred to in this document may be found in the

4、BSI Catalogue under the section entitled “International Standards Correspondence Index”, or by using the “Search” facility of the BSI Electronic Catalogue or of British Standards Online. This publication does not purport to include all the necessary provisions of a contract. Users are responsible fo

5、r its correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. aid enquirers to understand the text; present to the responsible international/European committee any enquiries on the interpretation, or proposals for change, and keep the UK int

6、erests informed; monitor related international and European developments and promulgate them in the UK. Summary of pages This document comprises a front cover, an inside front cover, the ISO title page, pages ii to iv, pages 1 to 12, an inside back cover and a back cover. The BSI copyright date disp

7、layed in this document indicates when the document was last issued. Amendments issued since publication Amd. No. Date Comments Reference number ISO 3977-8:2002(E)INTERNATIONAL STANDARD ISO 3977-8 First edition 2002-07-01 Gas turbines Procurement Part 8: Inspection, testing, installation and commissi

8、oning Turbines gaz Spcifications pour lacquisition Partie 8: Contrle, essais, installation et mise en service BSISO39778:2002BSISO39778:2002iiIS-7793 O8:(2002)E I SO 2002 All irthgs ersedevr iiiContents Page Foreword.iv 1 Scope 1 2 Normative references1 3 Terms and definitions .2 4 General principle

9、s .2 5 Inspection.3 5.1 General3 5.2 Material inspection 3 5.3 Mechanical inspection 4 6 Testing 4 6.1 General4 6.2 Hydrostatic test4 6.3 Functional/operating tests5 6.4 Optional tests.10 7 Preparation for storage and shipment 10 7.1 General10 7.2 Preparation.11 8 Installation and commissioning.11 B

10、SISO39778:2002iiiIS-7793 O8:(2002)E vi I SO 2002 All irthgs ersedevr Foreword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technic

11、al committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely wi

12、th the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization. International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 3. The main task of technical committees is to prepare International Standards. Draft Inte

13、rnational Standards adopted by the technical committees are circulated to the member bodies for voting. Publication as an International Standard requires approval by at least 75 % of the member bodies casting a vote. Attention is drawn to the possibility that some of the elements of this part of ISO

14、 3977 may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights. ISO 3977-8 was prepared by Technical Committee ISO/TC 192, Gas turbines. ISO 3977 consists of the following parts, under the general title Gas turbines Procurement: Part 1: Gen

15、eral and definitions Part 2: Standard reference conditions and ratings Part 3: Design requirements Part 4: Fuels and environment Part 5: Applications for petroleum and natural gas industries Part 7: Technical information Part 8: Inspection, testing, installation and commissioning Part 9: Reliability

16、, availability, maintainability and safety BSISO39778:2002ivINTENRATIONAL TSANDADR IS-7793 O8:(2002)EI SO 2002 All irthgs ersedevr 1Gas turbines Procurement Part 8: Inspection, testing, installation and commissioning 1 Scope This part of ISO 3977 states the principles for systems and procedures to a

17、ssure the integrity of a packagers product and services. It gives guidance on the inspection, testing, installation and commissioning required for the package and packaged equipment. It outlines the responsibilities between the purchaser and packager for inspection, coordination, reporting and recor

18、ding. 2 Normative references The following normative documents contain provisions which, through reference in this text, constitute provisions of this part of ISO 3977. For dated references, subsequent amendments to, or revisions of, any of these publications do not apply. However, parties to agreem

19、ents based on this part of ISO 3977 are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition of the normative document referred to applies. Members of ISO and IEC maintain registers of cu

20、rrently valid International Standards. ISO 2314:1989, Gas turbines Acceptance tests ISO 3977-1:1997, Gas turbines Procurement Part 1: General introduction and definitions ISO 3997-2:1997, Gas turbines Procurement Part 2: Standard reference conditions and ratings ISO 3977-3:2002, Gas turbines Procure

21、ment Part 3: Design requirements ISO 3997-4:2002, Gas turbines Procurement Part 4: Fuels and environment ISO 4406:1999, Hydraulic fluid power Fluids Method for coding the level of contamination by solid particles ISO 6190:1988, Acoustics Measurement of sound pressure levels of gas turbine installati

22、ons for evaluating environmental noise Survey method ISO 10442: 1), Petroleum, chemical and gas service industries Packaged, integrally geared centrifugal air compressors for general refinery service ISO 11042-1:1996, Gas turbines Exhaust gas emission Part 1: Measurement and evaluation ISO 11086:199

23、6, Gas turbines Vocabulary 1) To be published. BSISO39778:20021ISO 3977-8:2002(E) 2 I SO 2002 All irthgs ersedevr ISO 13709: 1) , Centrifugal pumps for petroleum, petrochemical, and natural gas industries ISO 13691:2001, Petroleum and natural gas industries High-speed special-purpose gear units IEC

24、60034-1:1983, Rotating electrical machines Part 1: Rating and performance IEC 60034-4:1985; Rotating electrical machines Part 4: Methods for determining synchronous machine quantities from tests 3 Terms and definitions For the purposes of this part of ISO 3977, the terms and definitions given in ISO

25、 3977-1, ISO 3977-3, ISO 3977-4 and ISO 11086 and the following apply. 3.1 inspection process by which it is demonstrated that materials, components, assemblies or complete packages satisfy one or more particular specification requirements of the packager or purchaser NOTE This may include verificat

26、ional documentation, reports, material certificates, chemical analyses, physical or dimensional checks, build records, visual checks and/or results of documented inspections and tests including any other non- destructive evaluation (NDE) methods or techniques that may be employed. 3.2 test process b

27、y which it is demonstrated that assemblies, completed components or packages satisfy the physical, functional and operational requirements as specified by the packagers test schedules and procedures, or the purchasers specification 3.3 witnessed term meaning that a hold is applied to the production

28、schedule and that the inspection or test will be carried out with the purchaser or his representative in attendance 3.4 observed term meaning that the purchaser will be notified of the timing of the inspection or test NOTE However, the inspection or test should be performed as scheduled, and if the

29、purchaser or his representative is not present, the packager should proceed to the next step. 4 General principles The packager shall furnish the purchaser with inspection and testing plans. These define the actions required by the packager and his sub-suppliers to assure the integrity of the packag

30、e. These plans should include any specific requirements stated by the purchaser in his enquiry and any local or national regulations applicable to the package in either the country of origin or destination. The plan shall be agreed between the packager and purchaser, and any third-party inspector wh

31、o may be appointed by the purchaser, prior to commencement of manufacture. It is the purchasers responsibility to notify the packager of any applicable local and national regulations in the country of destination. Where inspection and testing have to be done on site, these shall be identified in the

32、 inspection and testing plans and agreed between the packager and purchaser. BSISO39778:20022ISO 3977-8:2002(E) I SO 2002 All irthgs ersedevr 3The packager and purchaser shall agree to the following: the extent of purchaser participation in the inspection and testing, including witnessed and observe

33、d test points; detail running test procedures and acceptance parameters and criteria; notification period for hold points and witnessed tests and observed tests; facilities and services to be provided by the purchaser. The packager shall keep at least the following data available for a minimum of 10

34、 years after the date of commissioning for examination by the purchaser or his representative upon request: certification of materials; purchase specifications for all items on bills of materials; test data to verify that the requirements of the specification have been met; results of documented mat

35、erial inspections, including fully identified records of all heat treatment and radiography processes; when specified, final-assembly maintenance and as-built clearances. In addition to the above requirements, the purchaser may specify the following: parts that shall be subjected to surface and subs

36、urface examination; the type of non-destructive evaluation to be applied. 5 Inspection 5.1 General Inspection activities are carried out throughout the entire manufacturing process and may cover materials, components, fabrications, sub-assemblies, auxillary packages, and finished gas turbine package

37、s. Where inspection activities involve pressure-containing parts, these shall not be painted until the specified inspection of the parts is completed. 5.2 Material inspection Non-destructive evaluation (NDE) procedures and acceptance criteria used in the manufacturing and assembly procedures for the

38、 gas generator, power turbine and all other items of equipment shall be in accordance with the agreed inspection and testing plans. BSISO39778:20023ISO 3977-8:2002(E) 4 I SO 2002 All irthgs ersedevr 5.3 Mechanical inspection During assembly and prior to functional/operational testing, components or

39、sub-assemblies (including cast-in passages of these components) and all piping and appurtenances shall be cleaned chemically or by another appropriate method to remove foreign materials, corrosion products and mill scale. Any portion of the oil system furnished shall meet the cleanliness requirement

40、s of ISO 4406. When specified, the purchaser may inspect the equipment and all piping and appurtenances furnished by or through the packager for cleanliness before heads are welded to vessels, openings in vessels or exchangers are closed, or piping is finally assembled. When specified, the hardness

41、of parts, welds and heat-affected zones shall be verified as being within the allowable values by testing of the parts, welds or zones. The method, extent, documentation and witnessing of the testing shall be mutually agreed upon by the purchaser and packager. 6 Testing 6.1 General This clause deals

42、 with the minimum recommended requirements for the physical testing of components, assemblies and the complete package prior to entry into commercial service. The purchaser and packager shall agree on the scope of testing. This may include a selection of optional tests specified by the purchaser as

43、described in 6.4. Figure 1 shows the desired sequence of mandatory and optional operation testing and may be used for guidance. All test reports shall be retained for periods consistent with the requirements of ISO 3977-2. 6.2 Hydrostatic test As a minimum, components defined by legislation or natio

44、nal standards as pressure vessels (excluding the casings of gas generator and power turbine) shall be tested hydrostatically according to legislation or national standards, but at least with liquid at a minimum of 1,5 times the maximum allowable working pressure but not less than 140 kPa differentia

45、l pressure. Other components and systems shall be tested in accordance with the purchasers requirements or statuatory or mandatory requirements applicable to the destination territory. The test liquid shall be at a higher temperature than the nil-ductility transition temperature of the material bein

46、g tested. If the part tested is to operate at a temperature at which the tensile strength of a material is below the tensile strength of that material at room temperature, the hydrostatic test pressure shall be multiplied by a factor obtained by dividing the allowable working stress for the material

47、 at room temperature by that at operating temperature. The data sheets shall list actual hydrostatic test pressures and temperatures. The chloride content of liquids used to test austenitic stainless-steel materials shall not exceed 50 parts per million. To prevent deposition of chlorides as a resul

48、t of evaporative drying, all residual liquid shall be removed from tested parts at the conclusion of the test. Tests shall be maintained for a sufficient period of time to permit complete examination of parts under pressure. The hydrostatic test shall be considered satisfactory when neither leaks no

49、r seepage through the casing or casing joint is observed for a minimum of 30 min. Large, heavy castings may require a longer testing period which is to be agreed upon by the purchaser and packager. Seepage past internal closures required for testing of segmented cases and operation of a test pump to maintain pressure are acceptable. BSISO39778:20024ISO 3977-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > BS

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1