1、BS EN 13670:2009ICS 91.080.40NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBRITISH STANDARDExecution of concretestructuresBS EN 13670:2009Incorporating corrigendum October 2015corrigenda October 2015 and November 2015BS EN 13670:2009ISBN 978 0 580 92073 8Amendments/corrigenda
2、 issued since publicationDate Comments31 October 2015 Implementation of CEN Correction Notice 24 February 2010: Figure G.1 b relinked30 November 2015 National Annex (informative) to BS EN 13670 Execution Specification requirements addedThis British Standard was published under the authority of the S
3、tandards Policy and Strategy Committee on 28 February 2010 The British Standards Institution 2015. Published by BSI Standards Limited 2015National forewordThis British Standard is the UK implementation of EN 13670:2009. It supersedes DD ENV 13670-1:2000 which is withdrawn.The UK participation in its
4、 preparation was entrusted by Technical Committee B/525, Building and civil engineering structures, to Subcommittee B/525/2, Structural use of concrete.A list of organizations represented on this subcommittee can be obtained on request to its secretary.The Execution Specification requirements provid
5、ed by the UK committee are given in the National Annex NA (informative).This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application.Compliance with a British Standard cannot confer immunity from legal obligations.EUROPEAN
6、 STANDARD NORME EUROPENNE EUROPISCHE NORM EN 13670 December 2009 ICS 91.080.40 Supersedes ENV 13670-1:2000English Version Execution of concrete structures Excution des structures en bton Ausfhrung von Tragwerken aus Beton This European Standard was approved by CEN on 17 September 2009. CEN members a
7、re bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to
8、 the CEN Management Centre or to any CEN member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and notified to the CEN Management Centre has the sa
9、me status as the official versions. CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal,
10、Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG Management Centre: Avenue Marnix 17, B-1000 Brussels 2009 CEN All rights of exploitation in any form and by any means reser
11、ved worldwide for CEN national Members. Ref. No. EN 13670:2009: EEN 13670:2009 (E) 2 Contents Page Foreword 5Introduction .61 Scope 72 Normative references 73 Definitions 84 Execution management . 114.1 Assumptions . 114.2 Documentation 114.2.1 Execution specification 114.2.2 Quality Plan . 124.2.3
12、Execution record documentation 124.2.4 Special record documentation 124.3 Quality Management . 124.3.1 Execution classes . 124.3.2 Inspection of materials and products . 134.3.3 Inspection of execution 134.4 Action in the event of a non-conformity . 145 Falsework and formwork . 155.1 Basic requireme
13、nts. 155.2 Materials 155.2.1 General . 155.2.2 Release agents 155.3 Design and installation of falsework 155.4 Design and installation of formwork. 165.5 Special formwork 165.6 Inserts in formwork and embedded components . 165.6.1 General . 165.6.2 Making good of temporary recesses and holes 175.7 R
14、emoval of formwork and falsework 176 Reinforcement . 176.1 General . 176.2 Materials 176.3 Bending, cutting, transport and storage of the reinforcement 186.4 Welding 196.5 Joints . 197 Prestressing 197.1 General . 197.2 Materials for prestressing 207.2.1 Post-tensioning systems . 207.2.2 Sheaths 207
15、.2.3 Tensile elements . 207.2.4 Anchorage elements and accessories . 207.2.5 Tendon supports. 207.2.6 Cement-based grout . 217.2.7 Grease, wax or other products 217.3 Transport and storage 217.4 Installation of tendons . 217.4.1 General . 21BS EN 13670:2009EN 13670:2009 (E)EN 13670:2009 (E) 2 Conten
16、ts Page Foreword 5Introduction .61 Scope 72 Normative references 73 Definitions 84 Execution management . 114.1 Assumptions . 114.2 Documentation 114.2.1 Execution specification 114.2.2 Quality Plan . 124.2.3 Execution record documentation 124.2.4 Special record documentation 124.3 Quality Managemen
17、t . 124.3.1 Execution classes . 124.3.2 Inspection of materials and products . 134.3.3 Inspection of execution 134.4 Action in the event of a non-conformity . 145 Falsework and formwork . 155.1 Basic requirements. 155.2 Materials 155.2.1 General . 155.2.2 Release agents 155.3 Design and installation
18、 of falsework 155.4 Design and installation of formwork. 165.5 Special formwork 165.6 Inserts in formwork and embedded components . 165.6.1 General . 165.6.2 Making good of temporary recesses and holes 175.7 Removal of formwork and falsework 176 Reinforcement . 176.1 General . 176.2 Materials 176.3
19、Bending, cutting, transport and storage of the reinforcement 186.4 Welding 196.5 Joints . 197 Prestressing 197.1 General . 197.2 Materials for prestressing 207.2.1 Post-tensioning systems . 207.2.2 Sheaths 207.2.3 Tensile elements . 207.2.4 Anchorage elements and accessories . 207.2.5 Tendon support
20、s. 207.2.6 Cement-based grout . 217.2.7 Grease, wax or other products 217.3 Transport and storage 217.4 Installation of tendons . 217.4.1 General . 21BS EN 13670:2009EN 13670:2009 (E)EN 13670:2009 (E) 3 7.4.2 Pre-tensioned tendons 217.4.3 Post-tensioned bonded tendons . 227.4.4 Internal and external
21、 unbonded tendons 227.5 Tensioning . 227.5.1 General . 227.5.2 Pre-tensioned tendons 227.5.3 Post-tensioned bonded tendons . 237.5.4 Internal and external unbonded tendons 237.6 Protective measures (grouting, greasing) 237.6.1 General . 237.6.2 Pre-tensioned tendons 237.6.3 Post-tensioned bonded ten
22、dons . 237.6.4 Internal or external unbonded tendons . 237.6.5 Grouting operations 237.6.6 Greasing operations 247.6.7 Sealing 248 Concreting 248.1 Specification of concrete 248.2 Pre-concreting operations 248.3 Delivery, reception and site transport of fresh concrete 258.4 Placing and compaction .
23、258.4.1 General . 258.4.2 Lightweight Aggregate Concrete . 268.4.3 Self Compacting Concrete 268.4.4 Sprayed concrete 268.4.5 Slipforming . 268.4.6 Underwater concreting . 268.5 Curing and protection . 268.6 Post-concreting operations 288.7 Concreting of composite structures . 288.8 Surface Finish 28
24、9 Execution with precast concrete elements . 289.1 General . 289.2 Factory produced precast elements 289.3 Site manufactured precast elements . 299.4 Handling and storage 299.4.1 General . 299.4.2 Handling . 299.4.3 Storage . 299.5 Placing and adjustment 299.5.1 General . 299.5.2 Placing 299.6 Joint
25、ing and completion works . 309.6.1 General . 309.6.2 In-situ works 309.6.3 Structural connections . 3010 Geometrical tolerances . 3110.1 General . 3110.2 Reference system 3210.3 Base supports (foundations) 3210.4 Columns and walls 3210.5 Beams and slabs . 3410.6 Sections 3510.7 Surfaces and edge str
26、aightness 3710.8 Tolerances for holes and inserts . 37Annex A (informative) Guidance on documentation . 38Annex B (informative) Guidance on Quality Management 43BS EN 13670:2009EN 13670:2009 (E)EN 13670:2009 (E) 4 Annex C (informative) Guidance on falsework and formwork . 45Annex D (informative) Gui
27、dance on reinforcement 47Annex E (informative) Guidance on prestressing . 49Annex F (informative) Guidance on concreting 52Annex G (informative) Guidance on geometrical tolerances . 58Annex H (informative) Guidance on National Annex 65Bibliography . 66BS EN 13670:2009EN 13670:2009 (E)EN 13670:2009 (
28、E) 4 Annex C (informative) Guidance on falsework and formwork . 45Annex D (informative) Guidance on reinforcement 47Annex E (informative) Guidance on prestressing . 49Annex F (informative) Guidance on concreting 52Annex G (informative) Guidance on geometrical tolerances . 58Annex H (informative) Gui
29、dance on National Annex 65Bibliography . 66BS EN 13670:2009EN 13670:2009 (E)EN 13670:2009 (E) 5 Foreword This document (EN 13670:2009) has been prepared by Technical Committee CEN/TC 104 “Concrete and related products”, the secretariat of which is held by DIN. This European Standard shall be given t
30、he status of a national standard, either by publication of an identical text or by endorsement, at the latest by June 2010, and conflicting national standards shall be withdrawn at the latest by June 2010. Attention is drawn to the possibility that some of the elements of this document may be the su
31、bject of patent rights. CEN and/or CENELEC shall not be held responsible for identifying any or all such patent rights. This document supersedes ENV 13670-1:2000. This document has been prepared under a mandate given to CEN by the European Commission and the European Free Trade Association, and supp
32、orts essential requirements of EC Directive(s). Because of the close connection between design rules and rules for execution, CEN/TC 104/SC 2 has developed this standard in liaison with CEN/TC 250/SC 2, and CEN TC 229 According to the CEN/CENELEC Internal Regulations, the national standards organiza
33、tions of the following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Roman
34、ia, Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kingdom. .BS EN 13670:2009EN 13670:2009 (E)EN 13670:2009 (E) 6 Introduction This European Standard applies to the execution of concrete structures to achieve the intended level of safety and serviceability during its service life, as
35、given by EN 1990, Eurocode Basis of structural design, EN 1992, Eurocode 2 Design of concrete structures and EN 1994, Eurocode 4 Design of composite steel and concrete structures, with the Nationally Determined Parameters (NDPs) applicable in the place of use. This European Standard has three functi
36、ons: a) to transfer the requirements set during design to the constructor i.e. to be a link between design and execution; b) to give a set of standardized technical requirements for the execution when ordering a concrete structure; c) to serve as a check list for the designer to ensure that he provi
37、des the constructor with all relevant technical information for the execution of the structure (see Annex A). In order to achieve these objectives, the design shall result in a set of documents and drawings giving all information required for the execution of the work in accordance with the plans. T
38、his set of documents is, in this European Standard, referred to as the “execution specification“. This standard leaves a number of items open to be decided in the execution specification. In areas where national provisions shall apply these should be referred to in the execution specification. It is
39、 recognised in this European Standard that areas such as detailed requirements for competence of personnel, and details related to the Quality Management are within the competence of the Member States. If the national CEN member publishes a National Annex to this standard, it may refer to national s
40、tandards approved and published by the CEN member or national provisions, which supplement this standard, alternatively the supplementing rules can be given directly in the National Annex A detailed overview of the system of European Standards related to concrete works is shown in Figure 1. Figure 1
41、 System of European Standards as basis for design, execution and materials selection for concrete works (only main modules) BS EN 13670:2009EN 13670:2009 (E)EN 13670:2009 (E) 6 Introduction This European Standard applies to the execution of concrete structures to achieve the intended level of safety
42、 and serviceability during its service life, as given by EN 1990, Eurocode Basis of structural design, EN 1992, Eurocode 2 Design of concrete structures and EN 1994, Eurocode 4 Design of composite steel and concrete structures, with the Nationally Determined Parameters (NDPs) applicable in the place
43、 of use. This European Standard has three functions: a) to transfer the requirements set during design to the constructor i.e. to be a link between design and execution; b) to give a set of standardized technical requirements for the execution when ordering a concrete structure; c) to serve as a che
44、ck list for the designer to ensure that he provides the constructor with all relevant technical information for the execution of the structure (see Annex A). In order to achieve these objectives, the design shall result in a set of documents and drawings giving all information required for the execu
45、tion of the work in accordance with the plans. This set of documents is, in this European Standard, referred to as the “execution specification“. This standard leaves a number of items open to be decided in the execution specification. In areas where national provisions shall apply these should be r
46、eferred to in the execution specification. It is recognised in this European Standard that areas such as detailed requirements for competence of personnel, and details related to the Quality Management are within the competence of the Member States. If the national CEN member publishes a National An
47、nex to this standard, it may refer to national standards approved and published by the CEN member or national provisions, which supplement this standard, alternatively the supplementing rules can be given directly in the National Annex A detailed overview of the system of European Standards related
48、to concrete works is shown in Figure 1. Figure 1 System of European Standards as basis for design, execution and materials selection for concrete works (only main modules) BS EN 13670:2009EN 13670:2009 (E)EN 13670:2009 (E) 7 1 Scope (1) This European Standard gives common requirements for execution of concrete structures, it applies to both in-situ works and construction using prefabricated concrete elements. (2) This standard expects the execution specification to state all the specific requirements relevant to the particular str