FORD ESB-M9H101-A-2000 FABRIC BACKING - NON-WOVEN POLYESTER FIBER URETHANE FOAM《聚酯纤维 氨基甲酸泡沫无纺底布》.pdf

上传人:eastlab115 文档编号:745806 上传时间:2019-01-14 格式:PDF 页数:3 大小:33.12KB
下载 相关 举报
FORD ESB-M9H101-A-2000 FABRIC BACKING - NON-WOVEN POLYESTER FIBER URETHANE FOAM《聚酯纤维 氨基甲酸泡沫无纺底布》.pdf_第1页
第1页 / 共3页
FORD ESB-M9H101-A-2000 FABRIC BACKING - NON-WOVEN POLYESTER FIBER URETHANE FOAM《聚酯纤维 氨基甲酸泡沫无纺底布》.pdf_第2页
第2页 / 共3页
FORD ESB-M9H101-A-2000 FABRIC BACKING - NON-WOVEN POLYESTER FIBER URETHANE FOAM《聚酯纤维 氨基甲酸泡沫无纺底布》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATION Material Name Specification Number Date Action Revisions 2000 09 29 Revised Updated & renumbered A. Cockman 1980 09 09 EL1 - 6000 - 38 Released Printed copies are uncontrolled Page 1 of 3 Copyright 2000, Ford Global Technologies, Inc. FABRIC, BACKING - NON-WOVEN P

2、OLYESTER FIBER/URETHANE FOAM ESB-M9H101-A 1. SCOPE The material defined by this specification is a non - woven composite consisting of polyester fiber uniformly needled through a thin layer of polyester urethane foam. 2. APPLICATION This specification was released originally as a backing for ESB - M

3、2F149 - A seating vinyl on the 1981 Escort and Lynx carlines. 3. REQUIREMENTS Material specification requirements are to be used for initial qualification of materials. 3.1 QUALITY SYSTEM REQUIREMENTS Material suppliers and part producers must conform to the Companys Quality System Requirements. 3.2

4、 CONDITIONING AND TEST CONDITIONS All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/ - 2 C and 50 +/ - 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified. 3.3 COMPOSITION (A

5、STM D 629) Fiber 100 % Polyester Foam Polyester Urethane 3.4 CONSTRUCTION (ASTM D 1910) Fiber Blend 3 + 6 denier (0.33 + 0.66 tex) polyester, 3, 4 + 6 in (76 152 mm) staple length Foam 0.030 +/ - 0.002 in (0.76 +/ - 0.05 mm) ENGINEERING MATERIAL SPECIFICATION ESB-M9H101-A Page 2 of 3 Copyright 2000,

6、 Ford Global Technologies, Inc. 3.5 THICKNESS Total . 105 +/ - .015 in (2.67 +/ - .38 mm) 3.6 WEIGHT (FLTM BN 6 - 1) 3.6.1 Tota l 3.8 - 4.5 oz/yd 2 (128.8 - 152.6 g/m 2 ) 3.6.2 Weight Variance 0.8 oz/yd 2 (27.1 g/m 2 ) max per roll 0.4 oz/yd 2 (13.6 g/m 2 ) avg per shipment 3.7 BREAKING STRENGTH, mi

7、n WMD 25 lb (111 N) (ASTM D 1682 - Grab Method AMD 40 lb (178 N) 12 in (305 mm )/ min jaw speed - the jaws shall be modified with rubber on both faces) 3.8 TEAR STRENGTH (Trapezoid), min (FLTM BN 22 - 1) WMD 11 lb (49 N) AMD 19 lb (84.5 N) 3.9 STRETCH AND SET (FLTM BN 4 - 1, except use 10 lb (4.5 kg

8、) weight) Stretch Set WMD 100 - 140 % 45 % max AMD 45 - 75 % 60 % max 3.10 ADHESION (Foam to fiber) Foam should not delaminate from polyester fiber in a continuous sheet when separated by hand. 3.11 HUMIDITY AGING After exposure for 7 days at 98 +/ - 2 % rel ative humidity, 38 +/ - 1 C, the construc

9、tion shall show no evidence of mildew growth. ENGINEERING MATERIAL SPECIFICATION ESB-M9H101-A Page 3 of 3 Copyright 2000, Ford Global Technologies, Inc. 3.12 SUPPLIERS RESPONSIBILITY All materials supplied to this specification must be equivalent in all characteristics to the material upon which app

10、roval was origina lly granted. Prior to making any changes to the material originally approved under this specification, whether or not such changes affect the materials ability to meet the specification requirements, the Supplier shall notify the affected Purchasing, and Materials Engineering activ

11、ities (with reasons) of the proposed changes. Upon notification of the Company, further instructions will be provided. Note: Suppliers should be prepared to provide test data and samples demonstrating compliance to this speci fication, if requested. Substance restrictions imposed by regulations or C

12、ompany direction applies to the materials addressed by this document. The restrictions are identified in Restricted Substance Management Standard WSS - M99P9999 - A1. 4. APPROVAL OF MATERIALS Materials defined by this specification for direct supply to the Company must have prior approval. Certain m

13、aterials subcontracted by part suppliers may also require prior approval. These include materials critical to the Companys business fo r regulatory, safety, environmental or compatibility requirements or contractual agreements. Suppliers desiring approval of their materials shall first obtain an exp

14、ression of interest from Purchasing, Design or Materials Engineering activity. Upon reque st, the Supplier shall submit a completed copy of their laboratory test reports, signed by a qualified and authorized representative of the test facility, demonstrating full compliance with all the requirements of this specification.

展开阅读全文
相关资源
猜你喜欢
  • BS EN 12952-14-2004 Water-tube boilers and auxiliary installations - Requirements for flue gas DENOX-systems using liquified pressurized ammonia and ammonia water solution《水管锅炉和辅助设.pdf BS EN 12952-14-2004 Water-tube boilers and auxiliary installations - Requirements for flue gas DENOX-systems using liquified pressurized ammonia and ammonia water solution《水管锅炉和辅助设.pdf
  • BS EN 12952-15-2003 Water-tube boilers and auxiliary installations Acceptance tests《水管锅炉和辅助设备 验收试验》.pdf BS EN 12952-15-2003 Water-tube boilers and auxiliary installations Acceptance tests《水管锅炉和辅助设备 验收试验》.pdf
  • BS EN 12952-16-2002 Water-tube boilers and auxiliary installations - Requirements for grate and fluidized-bed firing systems for solid fuels for the boiler《水管锅炉和辅助装置 锅炉用固体燃料的炉蓖和流化床.pdf BS EN 12952-16-2002 Water-tube boilers and auxiliary installations - Requirements for grate and fluidized-bed firing systems for solid fuels for the boiler《水管锅炉和辅助装置 锅炉用固体燃料的炉蓖和流化床.pdf
  • BS EN 12952-18-2012 Water-tube boilers and auxiliary installations Operating instructions《水管锅炉及附属设备 操作规程》.pdf BS EN 12952-18-2012 Water-tube boilers and auxiliary installations Operating instructions《水管锅炉及附属设备 操作规程》.pdf
  • BS EN 12952-2-2011 Water-tube boilers and auxiliary installations Materials for pressure parts of boilers and accessories《水管锅炉和辅助装置 锅炉及其配件的受压元件用材料》.pdf BS EN 12952-2-2011 Water-tube boilers and auxiliary installations Materials for pressure parts of boilers and accessories《水管锅炉和辅助装置 锅炉及其配件的受压元件用材料》.pdf
  • BS EN 12952-3-2011 Water-tube boilers and auxiliary installations Design and calculation for pressure parts of the boiler《水管锅炉及附属设备 压力部件的设计和计算》.pdf BS EN 12952-3-2011 Water-tube boilers and auxiliary installations Design and calculation for pressure parts of the boiler《水管锅炉及附属设备 压力部件的设计和计算》.pdf
  • BS EN 12952-4-2011 Water-tube boilers and auxiliary installations In-service boiler life expectancy calculations《水管锅炉和辅助装置 锅炉使用寿命计算》.pdf BS EN 12952-4-2011 Water-tube boilers and auxiliary installations In-service boiler life expectancy calculations《水管锅炉和辅助装置 锅炉使用寿命计算》.pdf
  • BS EN 12952-5-2011 Water-tube boilers and auxiliary installations Workmanship and construction of pressure parts of the boiler《水管锅炉和辅助设备 第5部分 锅炉压力部件的工艺和制造》.pdf BS EN 12952-5-2011 Water-tube boilers and auxiliary installations Workmanship and construction of pressure parts of the boiler《水管锅炉和辅助设备 第5部分 锅炉压力部件的工艺和制造》.pdf
  • BS EN 12952-6-2011 Water-tube boilers and auxiliary installations Inspection during construction documentation and marking of pressure parts of the boiler《水管锅炉和辅助设备 建造期间检验 锅炉受压元件的文.pdf BS EN 12952-6-2011 Water-tube boilers and auxiliary installations Inspection during construction documentation and marking of pressure parts of the boiler《水管锅炉和辅助设备 建造期间检验 锅炉受压元件的文.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1