FORD ESF-M3D155-A-2004 PHENOLIC (PF) MOLDING COMPOUND GLASS FIBER REINFORCED TO BE USED WITH FORD WSS-M99P1111-A 《玻璃纤维增强的酚醛树脂(PF)成型料 与标准FORD WSS-M99P1111-A一起使用 》.pdf

上传人:livefirmly316 文档编号:746183 上传时间:2019-01-14 格式:PDF 页数:2 大小:75.36KB
下载 相关 举报
FORD ESF-M3D155-A-2004 PHENOLIC (PF) MOLDING COMPOUND GLASS FIBER REINFORCED  TO BE USED WITH FORD WSS-M99P1111-A  《玻璃纤维增强的酚醛树脂(PF)成型料  与标准FORD WSS-M99P1111-A一起使用 》.pdf_第1页
第1页 / 共2页
FORD ESF-M3D155-A-2004 PHENOLIC (PF) MOLDING COMPOUND GLASS FIBER REINFORCED  TO BE USED WITH FORD WSS-M99P1111-A  《玻璃纤维增强的酚醛树脂(PF)成型料  与标准FORD WSS-M99P1111-A一起使用 》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATIONDate Action Revisions 2004 11 18 Revised Inserted 3.0; Deleted 3.1, 3.2, 3.3, 3.5, 3.6 & 4 1987 12 01 Released CF4R-RD107002-87 Printed copies are uncontrolled Copyright 2004, Ford Global Technologies, LLC Page 1 of 2 PHENOLIC (PF) MOLDING COMPOUND ESF-M3D155-A GLA

2、SS FIBER REINFORCED 1. SCOPE The material defined by this specification is a two stage glass fiber reinforced phenolic molding compound. 2. APPLICATION This specification was released originally for material used for the electric fuel pump commutator. 3. REQUIREMENTS 3.0 STANDARD REQUIREMENTS FOR PR

3、ODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.4 MOLDED PROPERTIES 3.4.1 Preparation of Test Specimens Unless otherwise specified all tests shall be carried out on compression molded test specim

4、ens. The specimens shall be prepared according to ASTM D 796. 3.4.2 Density 1.78-1.83 g/cm3(ASTM D 792, Method A1) 3.4.3 Hardness, Rockwell E, min 75 (ASTM D 785) 3.4.4 Tensile Strength, min 41 MPa (ASTM D 638, Type I specimen, 3.2 mm thick, 5 mm/min test speed) 3.4.5 Compressive Strength, min 193 M

5、Pa (ASTM D 695, 25 x 12.7 x 12.7 mm specimen) 3.4.6 Flexural Strength, min 107 MPa (ASTM D 790, Method I, Procedure A, 127 x 12.7 x 6.4 mm specimen, 100 mm support span) 3.4.7 Impact Strength, Izod, min 27 J/m (ASTM D 256, Method A, 6.4 mm specimen, 10 specimens min) ENGINEERING MATERIAL SPECIFICATI

6、ONESF-M3D155-APrinted copies are uncontrolled Copyright 2004, Ford Global Technologies, LLC Page 2 of 2 3.4.8 Heat Deflection Temperature, min (ASTM D 648, 127 x 12.7 x 12.7 mm) specimen, at 1.82 MPa) 3.4.8.1 As Molded 150 C 3.4.8.2 Post Cured 200 C 16 h at 200 C 3.4.9 Water Absorption, max 0.35% (ASTM D 570, 24 h, 51 mm diameter x 6.4 mm thick specimen) 3.4.10 Ash, min 40% (FLTM BO 006-02, 2 h at 1000 C)

展开阅读全文
相关资源
猜你喜欢
  • ETSI ETR 108-1994 European Digital Cellular Telecommunications System (Phase 2) GSM Electro Magnetic Compatibility (EMC) Considerations (GSM 05 90 Version 4 2 1 Amendment 1)《欧洲数字蜂窝.pdf ETSI ETR 108-1994 European Digital Cellular Telecommunications System (Phase 2) GSM Electro Magnetic Compatibility (EMC) Considerations (GSM 05 90 Version 4 2 1 Amendment 1)《欧洲数字蜂窝.pdf
  • ETSI ETR 108-1994 European Digital Cellular Telecommunications System (Phase 2) GSM Electro Magnetic Compatibility (EMC) Considerations (GSM 05 90 Version 4 2 1 Amendment 1)《欧洲数字蜂窝_1.pdf ETSI ETR 108-1994 European Digital Cellular Telecommunications System (Phase 2) GSM Electro Magnetic Compatibility (EMC) Considerations (GSM 05 90 Version 4 2 1 Amendment 1)《欧洲数字蜂窝_1.pdf
  • ETSI ETR 109-1993 European Digital Cellular Telecommunications System (Phase 2) General Network Interworking Scenarios (GSM 09 01 Version 4 0 1)《欧洲数字蜂窝通信系统(第2代)通用网络互通方案GSM09 01 版本 .pdf ETSI ETR 109-1993 European Digital Cellular Telecommunications System (Phase 2) General Network Interworking Scenarios (GSM 09 01 Version 4 0 1)《欧洲数字蜂窝通信系统(第2代)通用网络互通方案GSM09 01 版本 .pdf
  • ETSI ETR 111-1997 Digital Cellular Telecommunications System (Phase 2) Interworking between Phase 1 Infrastructure and Phase 2 Mobile Stations (MS) (Seventh Edition GSM 09 90 Versi.pdf ETSI ETR 111-1997 Digital Cellular Telecommunications System (Phase 2) Interworking between Phase 1 Infrastructure and Phase 2 Mobile Stations (MS) (Seventh Edition GSM 09 90 Versi.pdf
  • ETSI ETR 111-1997 Digital Cellular Telecommunications System (Phase 2) Interworking between Phase 1 Infrastructure and Phase 2 Mobile Stations (MS) (Seventh Edition GSM 09 90 Versi_1.pdf ETSI ETR 111-1997 Digital Cellular Telecommunications System (Phase 2) Interworking between Phase 1 Infrastructure and Phase 2 Mobile Stations (MS) (Seventh Edition GSM 09 90 Versi_1.pdf
  • ETSI ETR 112-1993 Broadband Integrated Services Digital Network (B-ISDN) B-ISDN Principles《宽带综合业务数字网(B-ISDN) B-ISDN原理》.pdf ETSI ETR 112-1993 Broadband Integrated Services Digital Network (B-ISDN) B-ISDN Principles《宽带综合业务数字网(B-ISDN) B-ISDN原理》.pdf
  • ETSI ETR 113-1993 Human Factors (HF) Results of an Evaluation Study of Pictograms for Point-to-Point Videotelephony《人为因素(HF) 点对点可视电话的象形图的评价研究结果》.pdf ETSI ETR 113-1993 Human Factors (HF) Results of an Evaluation Study of Pictograms for Point-to-Point Videotelephony《人为因素(HF) 点对点可视电话的象形图的评价研究结果》.pdf
  • ETSI ETR 114-1993 Transmission and Multiplexing (TM) Functional Architecture of Synchronous Digital Hierarchy (SDH) Transport Networks《传输和复用(TM) 同步数字体系(SDH)传送网的功能架构》.pdf ETSI ETR 114-1993 Transmission and Multiplexing (TM) Functional Architecture of Synchronous Digital Hierarchy (SDH) Transport Networks《传输和复用(TM) 同步数字体系(SDH)传送网的功能架构》.pdf
  • ETSI ETR 115-1994 Terminal Equipment (TE) General Concerns for the Parties Involved During the Telecommunication Integrated Circuit Card Life Cycle《终端设备(TE) 在通信集成电路卡有效期内所涉及的各方的一般关系.pdf ETSI ETR 115-1994 Terminal Equipment (TE) General Concerns for the Parties Involved During the Telecommunication Integrated Circuit Card Life Cycle《终端设备(TE) 在通信集成电路卡有效期内所涉及的各方的一般关系.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1