FORD FLTM BU 154-02-2006 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST (FLTM BU 154-01)《快刀粘附力试验法进行挡风玻璃剪线评估(FLTM BU 154-01)》.pdf

上传人:eventdump275 文档编号:747557 上传时间:2019-01-14 格式:PDF 页数:2 大小:31.23KB
下载 相关 举报
FORD FLTM BU 154-02-2006 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST (FLTM BU 154-01)《快刀粘附力试验法进行挡风玻璃剪线评估(FLTM BU 154-01)》.pdf_第1页
第1页 / 共2页
FORD FLTM BU 154-02-2006 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST (FLTM BU 154-01)《快刀粘附力试验法进行挡风玻璃剪线评估(FLTM BU 154-01)》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 FORD LABORATORY TEST METHODBU 154-02Date Action Revisions 2006 12 11 Activated H. Kon, M. Mehandru Printed copies are uncontrolled Copyright 2007, Ford Global Technologies, LLC Page 1 of 2 WINDSHIELD CUT-OUT EVALUATION VIA QUICK KNIFE ADHESION TEST (FLTM BU 154-01) APPLICATION This procedure is use

2、d to prepare painted test unit and validate the integrity of the direct glazing system through production process conditions. Test units will be subject to evaluation via Quick Knife Adhesion Test, FLTM BU 154-01. ABSTRACT Process body-in-white unit through production Paint process. Install windshie

3、ld, backlite, and quarter glass, if applicable, to painted unit using production/design intent direct glazing materials and process. Evaluate integrity of bond to validate direct glazing material compatibility to production paint system. REQUIRED EQUIPMENT/MATERIALS BIW body(s) with closure panels P

4、roduction Paint Shop Production Paint Materials Oven Temperature Profiles Paint film build measuring device Production Glass (Windshield, Backlite, Qtr Glass) Production Glass installation aids o Masking Tape o “Piano Keys“ Production Direct Glazing Materials o Glass Primers o Urethane Adhesive Supp

5、orting documents: o FLTM BU 154-01 o AVP-T118-001 FORD LABORATORY TEST METHODBU 154-02 Printed copies are uncontrolled Copyright 2007, Ford Global Technologies, LLC Page 2 of 2 TEST PROCEDURE Painted Unit Preparation Procedure: Oven Profile for test unit (or from same production shift) shall be made

6、 available to confirm production representative processing conditions. 1. Process test unit through complete Paint Shop process a. Measure film builds on glass bonding flanges/surfaces per Program specific requirements for each paint layer b. Basecoat color will be determined by Paint Engineering, a

7、nd Material Engineering prior to build c. Number of units required will be determined by Paint Engineering, Material Engineering prior to build (typically two units in two colors required) 2. Allow test unit to reach temperature equilibrium Glass Installation Procedure: 1. Install production glass l

8、ocation aids, e.g. “piano keys“ to test unit 2. Install Glass(es) to test unit. Note: Ensure that Process Standards for direct glazing materials are followed, e.g. Do not exceed open-time of adhesive (10 min. typical) due to transport and installation time. Option A: Robotic-applied primer(s) and ur

9、ethane adhesive. 1. Abort glass(es) with primer(s) and urethane adhesive from automation cell(s) 2. Install glass(es) to unit using manual installation process Option B: Robotic-applied primer(s) and Manual-applied urethane adhesive 1. Abort glass(es) with primer(s) from automation cell(s) 2. Manual

10、ly apply urethane adhesive to glass(es) per process/design 3. Install glass(es) to unit using manual installation process Option C: Manual-applied primer(s) and urethane adhesive 1. Manually apply glass primer(s) to glass(es) 2. Manually apply urethane adhesive to glass(es) per process/design 3. Ins

11、tall glass(es) to unit using manual installation process 3. Apply Masking Tape to glass(es) and adjacent body sheet metal to fixture glass(es) 4. Store test unit in plant ambient conditions and allow urethane adhesive to cure 10 to 14 days Evaluation Procedure: 1. Remove glass(es) using standard gla

12、ss removal/replacement procedure while taking care to cut the urethane adhesive as close to glass as possible 2. Evaluate urethane adhesive bond to glass bonding flange/surfaces using FLTM BU154-01 a. Quantify and record (in linear inches and percentage of total bond length) any loss of adhesion of

13、urethane adhesive to paint b. Quantify and record (in linear inches and percentage of total bond length) any loss of adhesion of paint layers c. Quantify and record (in linear inches and percentage of total bond length) any loss of cohesion within paint layers d. Report Oven Profile and Film Build Measurements

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1