FORD WSS-M3G234-A2-2006 MASKING TAPE - VINYL AND POLYESTER COMPOSITE BASED BAKEABLE《可焙干的乙烯基和聚酯复合材料基遮蔽胶带》.pdf

上传人:wealthynice100 文档编号:753249 上传时间:2019-01-14 格式:PDF 页数:5 大小:29.12KB
下载 相关 举报
FORD WSS-M3G234-A2-2006 MASKING TAPE - VINYL AND POLYESTER COMPOSITE BASED BAKEABLE《可焙干的乙烯基和聚酯复合材料基遮蔽胶带》.pdf_第1页
第1页 / 共5页
FORD WSS-M3G234-A2-2006 MASKING TAPE - VINYL AND POLYESTER COMPOSITE BASED BAKEABLE《可焙干的乙烯基和聚酯复合材料基遮蔽胶带》.pdf_第2页
第2页 / 共5页
FORD WSS-M3G234-A2-2006 MASKING TAPE - VINYL AND POLYESTER COMPOSITE BASED BAKEABLE《可焙干的乙烯基和聚酯复合材料基遮蔽胶带》.pdf_第3页
第3页 / 共5页
FORD WSS-M3G234-A2-2006 MASKING TAPE - VINYL AND POLYESTER COMPOSITE BASED BAKEABLE《可焙干的乙烯基和聚酯复合材料基遮蔽胶带》.pdf_第4页
第4页 / 共5页
FORD WSS-M3G234-A2-2006 MASKING TAPE - VINYL AND POLYESTER COMPOSITE BASED BAKEABLE《可焙干的乙烯基和聚酯复合材料基遮蔽胶带》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions 2006 11 27 Revised Inserted 3.0; Deleted 3.1, 3.2, 3.3, 3.9, 4; Corrected numbering 5 2001 05 17 Activated M. Mehandru Printed copies are uncontrolled Copyright 2006, Ford Global Technologies, LLC Page 1 of 5 MASKING TAPE - VINYL AND POLYESTE

2、R WSS-M3G234-A2 COMPOSITE BASED, BAKEABLE 1. SCOPE The material defined by this specification is a vinyl and polyester composite masking tape that is removable after paint oven bake conditions, without any residue that affects glass bonding. 2. APPLICATION This specification was released originally

3、for materials used to provide localized masking of the windshield and other painted metal flanges prior to the application of urethane adhesive. This tape is to be applied to electrocoated metal surfaces. Tape removal is performed after paint oven bakes. 3. REQUIREMENTS Material specification requir

4、ements are to be used for initial qualification of materials. 3.0 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.4 TAPE PROPERTIES 3.4.1 Breaking Strength (ASTM D 100

5、0, pull at 300 mm/min) As Received (roll material), MPa 35 min. After Bake, Change, % +/- 20 (bake per para 5.3, schedule 2) 3.4.2 Elongation, % (ASTM D 1000, pull at 300 mm/min) As Received (roll material) 80 min After Bake, Change, % +/- 20 (bake per para 5.3, schedule 2) 3.4.3 Total Thickness (ro

6、ll material), mm 0.172 +/- 0.03 ENGINEERING MATERIAL SPECIFICATION WSS-M3G234-A2 Printed copies are uncontrolled Copyright 2006, Ford Global Technologies, LLC Page 2 of 5 3.4.4 Adhesion, N/mm (180 peel adhesion per ASTM D 1000) To Steel (roll material) 0.25 min To Electrocoat Surface 0.25 min Shall

7、be removed in a continuous film leaving no residue on surfaces that affects windshield adhesive adhesion. 3.4.4.1 Mask removal after process bake 3.4.4.2 Mask removal after 2 weeks heat age at 38 C Test Method: - Prepare six 100 x 300 x 0.9 mm electrocoat panels as described in para 5.2 for each ele

8、ctrocoat bake condition per 5.3, schedule 1 and 2. - Apply a 25 x 200 mm tape along the center line of each electrocoat panel. - Expose minimum electrocoat bake panels to para 5.3, schedule 1, primer and topcoat bakes, and maximum electrocoat. - Cool panels to room temperature. - Conduct 180 peel te

9、st per the above ASTM procedure. - Expose the remaining three panels from minimum and maximum bake conditions to 2 weeks at 38 C. - Cool panels to room temperature and conduct peel test. 3.5 BONDING PERFORMANCE TO ELECTROCOAT SURFACE AFTER TAPE REMOVAL (Shall meet all the requirements of shear adhes

10、ion per WSB-M2G316B, 3.7.1.) Panel Preparation: - Prepare ten electrocoat coupons per each exposure condition described in WSB-M2G316-B, para 3.7.1. Use electrocoat as specified in para 5.2. Bake five coupons at minimum and five coupons at maximum electrocoat bake per 5.4, schedule 1 and 2. - Apply

11、tape strips to each coupon and bake minimum bake electrocoat coupons per para 5.4, schedule 1, primer and topcoat bakes, and maximum bake electrocoat coupons per para 5.4, schedule 2, primer and topcoat bakes. - Allow coupons to cool to room temperature. - Manually remove masking tape. - Prepare she

12、ar adhesion samples and conduct tests per WSB-M2G316B para 3.7.1. ENGINEERING MATERIAL SPECIFICATION WSS-M3G234-A2 Printed copies are uncontrolled Copyright 2006, Ford Global Technologies, LLC Page 3 of 5 3.6 QUICK KNIFE ADHESION TEST No adhesion failure to electrocoat surface. Test Method: - Use el

13、ectrocoat panels as described in para 5.2. - Prepare sixteen electrocoat panels per paint oven bake matrix para 5.3, schedule 3. - Process panel through the multiple oven bake conditions per para 5.3, schedule 3. - Allow panels to cool to room temperature and manually remove mask. - Apply a 6 x 6 x

14、200 mm WSB-M2G316B urethane adhesive bead to the center line of each panel. - Allow the adhesive to air cure for 72 hours at room temperature. - Perform Quick Knife adhesion test per SAE J1720. 3.7 STORAGE STABILITY The material shall be stored at temperatures below 23 C away from all sources of hea

15、t and sunlight. Heat accelerates aging. Under these conditions, the shelf life of the material shall be 9 months. When these materials are stored at temperatures below 23 C, they shall be conditioned at room temperature prior to application. Adequate conditioning permits the material to obtain its o

16、ptimum application properties. 3.8 FUNCTIONAL APPROVAL Material being evaluated for initial approval to this specification shall be subjected to a production trial. Functional trial results should be available to Body and Assembly Operations prior to material approval. 5. GENERAL INFORMATION The inf

17、ormation given below is provided for clarification and assistance in meeting the requirements of this specification. 5.1 MECHANICAL CONVECTION OVEN A gas fired oven shall be used to cure the material with the capability obtaining 205 C metal temperature on body steel (0.9 mm thickness) within 8- 10

18、minutes. 5.2 SUBSTRATES Electrocoat steel panel - Use current production paints as specified by Body & Assembly Operations. Prepare electrocoat panels per FLTM B1 120-01. Process panels at minimum engineering specification requirements for electrocoat thickness. Bake panels 23 minutes at 166 C metal

19、 temperature unless otherwise specified. ENGINEERING MATERIAL SPECIFICATION WSS-M3G234-A2 Printed copies are uncontrolled Copyright 2006, Ford Global Technologies, LLC Page 4 of 5 5.3 BAKE SCHEDULES: Schedule 1: Minimum Oven Bake Conditions: Electrocoat bake - 10 min at 166 C metal temperature Prime

20、r bake - 8 min at 135 C metal temperature Topcoat bake - 10 min at 124 C metal temperature Schedule 2: Maximum Oven Bake Conditions: Electrocoat bake - 23 min at 205 C metal temperature Primer bake - 23 min at 177 C metal temperature Topcoat bake - 23 min at 154 C metal temperature ENGINEERING MATER

21、IAL SPECIFICATION WSS-M3G234-A2 Printed copies are uncontrolled Copyright 2006, Ford Global Technologies, LLC Page 5 of 5 Schedule 3 Paint Oven Bake Matrix Panel # Ecoat Bake Primer Bake Topcoat Bake Topcoat Bake 1 min min min 1 2 min min max 1 3 min max min 1 4 min max max 1 5 max min min 1 6 max min max 1 7 max max min 1 8 max max max 1 9 min min min 5 10 min min max 5 11 min max min 5 12 min max max 5 13 max min min 5 14 max min max 5 15 max max min 5 16 max max max 5 5.4 COLOR Yellow

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1