NASA UFGS-23 09 33 13 40-2008 ELECTRIC CONTROL SYSTEM FOR HVAC《供热 通风及空调系统(HVAC)用电气控制系统》.pdf

上传人:hopesteam270 文档编号:836584 上传时间:2019-02-20 格式:PDF 页数:7 大小:41.22KB
下载 相关 举报
NASA UFGS-23 09 33 13 40-2008 ELECTRIC CONTROL SYSTEM FOR HVAC《供热 通风及空调系统(HVAC)用电气控制系统》.pdf_第1页
第1页 / 共7页
NASA UFGS-23 09 33 13 40-2008 ELECTRIC CONTROL SYSTEM FOR HVAC《供热 通风及空调系统(HVAC)用电气控制系统》.pdf_第2页
第2页 / 共7页
NASA UFGS-23 09 33 13 40-2008 ELECTRIC CONTROL SYSTEM FOR HVAC《供热 通风及空调系统(HVAC)用电气控制系统》.pdf_第3页
第3页 / 共7页
NASA UFGS-23 09 33 13 40-2008 ELECTRIC CONTROL SYSTEM FOR HVAC《供热 通风及空调系统(HVAC)用电气控制系统》.pdf_第4页
第4页 / 共7页
NASA UFGS-23 09 33 13 40-2008 ELECTRIC CONTROL SYSTEM FOR HVAC《供热 通风及空调系统(HVAC)用电气控制系统》.pdf_第5页
第5页 / 共7页
点击查看更多>>
资源描述

1、USACE / NAVFAC / AFCESA / NASA UFGS-23 09 33.13 40 (August 2008)-Preparing Activity: NASA SupersedingUFGS-23 09 33.13 40 (July 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR CONDI

2、TIONINGSECTION 23 09 33.13 40ELECTRIC CONTROL SYSTEM FOR HVAC08/08PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 GENERAL REQUIREMENTSPART 2 PRODUCTS2.1 GENERAL2.2 COMMUNICATIONS2.3 DIAGNOSTICS2.3.1 Automatic Diagnostics2.3.2 Comprehensive Diagnostics2.4 ACQUISITION POINT REQUIREMENTS2.5 CONTROL POINT

3、 REQUIREMENTSPART 3 EXECUTION3.1 INSTALLATION3.2 OPERATION AND MAINTENANCE- End of Section Table of Contents -SECTION 23 09 33.13 40 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 09 33.13 40 (August 200

4、8)-Preparing Activity: NASA SupersedingUFGS-23 09 33.13 40 (July 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 23 09 33.13 40ELECTRIC CONTROL SYSTEM FOR HVAC08/08*NOTE: This specification covers the requirements for microprocessor interface

5、 requirements for control of air handling units from a central building control computer, referred to in the text as the Utility Control System (UCS).The purpose of this section is to obtain detailed microprocessor communication protocol in order to interface an air handler microprocessor with a dis

6、similar building control system. Air handler microprocessor will typically communicate with a Remote Terminal Unit (RTU), which is a smart peripheral extension of the UCS.This section should be used in conjunction with the following when applicable:Section 42 22 13.00 40 CENTRIFUGAL PROCESS CHILLERS

7、 AND COOLERS.Section 23 82 19 FAN COIL UNITS.Section 23 34 16.00 20 AIR HANDLING UNITS.Section 23 74 33.00 40 PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP AIR-CONDITIONERSSection 23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITSEdit this guide specification for project specific requirements by ad

8、ding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should

9、be directed to the technical SECTION 23 09 33.13 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Inte

10、rnet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and liste

11、d in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to up

12、date the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this section to the extent referenced. The publications

13、 are referred to within the text by the basic designation only.ELECTRONIC INDUSTRIES ALLIANCE (EIA)TIA/EIA 422-B (1994; R 2005) Standard for Electrical Characteristics of Balanced Voltage Digital Interface Circuits1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00

14、 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are al

15、ready marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in SECTION 23 09 33.13 40 Page 3Provided by IHSNot for ResaleNo reproduct

16、ion or networking permitted without license from IHS-,-,-context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army proj

17、ects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used

18、for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quali

19、ty Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsRecords of Existing

20、Conditions shall be submitted in accordance with paragraph entitled, “General Requirements,“ of this section.SD-02 Shop DrawingsConnection Diagrams shall be submitted for air handling unit microprocessor interface in accordance with paragraph entitled, “General Requirements,“ of this section.SD-03 P

21、roduct DataEquipment and Performance Data shall be submitted for air handling unit microprocessor interface in accordance with paragraph entitled, “General Requirements,“ of this section.SD-07 CertificatesParts List shall be submitted for air handling unit microprocessor interface in accordance with

22、 paragraph entitled, “General Requirements,“ of this section.SD-08 Manufacturers InstructionsOperating Instructions shall be submitted for air handling unit microprocessor interface in accordance with paragraph entitled, “General,“ of this section.SD-10 Operation and Maintenance DataOperation and Ma

23、intenance Manuals shall be submitted in accordance SECTION 23 09 33.13 40 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-with paragraph entitled, “Operation and Maintenance,“ of this section.1.3 GENERAL REQUIREMENTS*NOTE: If Section 23 00 00 A

24、IR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS is not included in the project specification, applicable requirements therefrom should be inserted and the following paragraph deleted.*Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS applies to work specified in t

25、his section.Records of Existing Conditions shall be submitted consisting of the results of Contractors survey of work area conditions and features of existing structures and facilities within and adjacent to the jobsite. Commencement of work shall constitute acceptance of existing conditions.Connect

26、ion Diagrams shall be submitted for air handling unit microprocessor interface indicating the relation and connection of devices and apparatus by showing the general physical layout of all controls, the interconnection of one system (or portion of system) with another, and internal tubing, wiring, a

27、nd other devices.Equipment and Performance Data shall be submitted for air handling unit microprocessor interface consisting of scan rates, and response times to direct commands.Parts List shall be submitted for air handling unit microprocessor interface listing by manufacturers name, part number, n

28、omenclature, and stock level required for maintenance and repair necessary to ensure continued operation with minimal delay.PART 2 PRODUCTS2.1 GENERALAir handling units which utilize a microprocessor-based control system for monitoring alarms, temperature and humidity and control chilled water flows

29、 heating, and humidification, shall have the capability to communicate directly with a microprocessor-based remote terminal unit (RTU) for data acquisition, alarm monitoring, set point and alarm point adjustment.Operating Instructions shall be submitted for air handling unit microprocessor interfac

30、e consisting of standard operating procedures including startup, shutdown, and emergency operation.2.2 COMMUNICATIONSCommunications port(s) shall be a standard interface in accordance with TIA/EIA 422-B. Standard baud rate shall be 9600, on which all performance specifications shall be based. Baud r

31、ate shall be switch selectable to 4800 2400.Each air handling unit microprocessor shall be available for and able to SECTION 23 09 33.13 40 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-communicate directly with the NASA Utility Control Syste

32、m (UCS) remote terminal unit (RTU).2.3 DIAGNOSTICSMicroprocessor control shall include a diagnostic routine that can be performed by the user to check the operation of the microprocessor.Diagnostic routines shall be fully tested by the manufacturer prior to delivery. Diagnostics shall provide two le

33、vels of testing.2.3.1 Automatic DiagnosticsAutomatic diagnostics shall be executed upon system start-up and shall include a read/write check to memory for memory testing, minimal instruction execution check, buss and port checks.2.3.2 Comprehensive DiagnosticsComprehensive diagnostics shall include:

34、Microprocessor instructions: All defined functions and their variationsMicroprocessor memory testing: Memory testing shall include comprehensive memory test with memory execution characteristic printout. Limits on memory access time, all patterns run, run time, and number of successful executions in

35、 worst case pattern shall be included in this printout.Power supply statusBuss and port checksCapability to be initiated remotely (through the communication link)Performance of the diagnostics shall meet the above requirements for final acceptance of the air handling unit.2.4 ACQUISITION POINT REQUI

36、REMENTSAir handling unit microprocessor shall monitor and transmit the values of the following points to the remote terminal unit (RTU):Cooling temperature setpointHeating temperature setpointHumidification setpointDehumidification setpointReturn air temperatureReturn air relative humidityAir handle

37、r fan operation status (loss of airflow alarm)Filter status (dirty filter alarm)SECTION 23 09 33.13 40 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Water flow status (loss of chilled water flow alarm)Return air smoke detector alarmHumidifier

38、 failure alarmUnder floor water sensor alarmActivation of manual override alarmActivation of local alarmMicroprocessor failure (loss of communication is a valid indication of microprocessor failure)Acquisition values returned for a scan request shall be returned in no more than two (2) seconds.Air h

39、andling unit microprocessor shall respond to a scan request in no more than five (5) seconds, total, for up to 16 scanned points.2.5 CONTROL POINT REQUIREMENTSAir handling unit microprocessor shall accept commands from the remote terminal unit (RTU) to control the following points:Unit (fan) start/s

40、topCooling temperature setpointHeat temperature setpointHumidification setpointDehumidification setpointPART 3 EXECUTION3.1 INSTALLATIONEquipment shall be installed as indicated and in accordance with the manufacturers recommendations.3.2 OPERATION AND MAINTENANCEContractor shall submit 6 _ copies o

41、f the Operation and Maintenance Manuals 30 calendar days prior to testing the air handling unit microprocessor interface. Data shall be updated and resubmitted for final approval no later than 30 calendar days prior to contract completion.- End of Section -SECTION 23 09 33.13 40 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 13808-2013 Bitumen and bituminous binders - Framework for specifying cationic bituminous emulsions German version EN 13808 2013《沥青和沥青粘结剂 阳离子沥青乳液的规定框架 德文版本EN 13808-2013》.pdf DIN EN 13808-2013 Bitumen and bituminous binders - Framework for specifying cationic bituminous emulsions German version EN 13808 2013《沥青和沥青粘结剂 阳离子沥青乳液的规定框架 德文版本EN 13808-2013》.pdf
  • DIN EN 13809-2003 Tourism services - Travel agencies and tour operators - Terminology Trilingual version EN 13809 2003《旅游服务 旅行社和旅游经营人员 术语》.pdf DIN EN 13809-2003 Tourism services - Travel agencies and tour operators - Terminology Trilingual version EN 13809 2003《旅游服务 旅行社和旅游经营人员 术语》.pdf
  • DIN EN 1381-2016 Timber structures - Tests methods - Load bearing stapled joints German version EN 1381 2016《木结构 试验方法 承重的钩环接合 德文版本EN 1381-2016》.pdf DIN EN 1381-2016 Timber structures - Tests methods - Load bearing stapled joints German version EN 1381 2016《木结构 试验方法 承重的钩环接合 德文版本EN 1381-2016》.pdf
  • DIN EN 13810-1-2003 Wood-based panels - Floating floors - Part 1 Performance specifications and requirements German version EN 13810-1 2002《木制板材 浮式地板 第1部分 性能规范和要求》.pdf DIN EN 13810-1-2003 Wood-based panels - Floating floors - Part 1 Performance specifications and requirements German version EN 13810-1 2002《木制板材 浮式地板 第1部分 性能规范和要求》.pdf
  • DIN EN 13813-2003 Screed material and floor screeds - Screed materials - Properties and requirements German version EN 13813 2002《刮板材料和地面刮板 刮板材料 特性和要求》.pdf DIN EN 13813-2003 Screed material and floor screeds - Screed materials - Properties and requirements German version EN 13813 2002《刮板材料和地面刮板 刮板材料 特性和要求》.pdf
  • DIN EN 13814-2005 Fairground and amusement park machinery and structures - Safety German version EN 13814 2004《博览会和露天游艺场机械和建筑物 安全》.pdf DIN EN 13814-2005 Fairground and amusement park machinery and structures - Safety German version EN 13814 2004《博览会和露天游艺场机械和建筑物 安全》.pdf
  • DIN EN 13815-2006 Fibrous gypsum plaster casts - Definitions requirements and test methods English version of DIN EN 13815 2006-12《纤维石膏模型 定义 要求和试验方法》.pdf DIN EN 13815-2006 Fibrous gypsum plaster casts - Definitions requirements and test methods English version of DIN EN 13815 2006-12《纤维石膏模型 定义 要求和试验方法》.pdf
  • DIN EN 13816-2002 Transportation - Logistics and services - Public passenger transport Service quality definition targeting and measurement German version EN 13816 2002《运输 后勤和服务 大众.pdf DIN EN 13816-2002 Transportation - Logistics and services - Public passenger transport Service quality definition targeting and measurement German version EN 13816 2002《运输 后勤和服务 大众.pdf
  • DIN EN 13817-2005 Surfaces for sports areas - Procedure for accelerated ageing by exposure to hot air German version EN 13817 2004《运动场表面 在热空气中加速老化规程》.pdf DIN EN 13817-2005 Surfaces for sports areas - Procedure for accelerated ageing by exposure to hot air German version EN 13817 2004《运动场表面 在热空气中加速老化规程》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1