[外语类试卷]BEC商务英语(高级)听力模拟试卷81(无答案).doc

上传人:appealoxygen216 文档编号:857068 上传时间:2019-02-23 格式:DOC 页数:4 大小:30KB
下载 相关 举报
[外语类试卷]BEC商务英语(高级)听力模拟试卷81(无答案).doc_第1页
第1页 / 共4页
[外语类试卷]BEC商务英语(高级)听力模拟试卷81(无答案).doc_第2页
第2页 / 共4页
[外语类试卷]BEC商务英语(高级)听力模拟试卷81(无答案).doc_第3页
第3页 / 共4页
[外语类试卷]BEC商务英语(高级)听力模拟试卷81(无答案).doc_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、BEC 商务英语(高级)听力模拟试卷 81(无答案)一、PART ONE0 You will hear a speaker giving a group of managers advice on how to run a project.As you listen, for questions 1-12, complete the notes using up to three words or a number.After you have listened once, replay the recording.RUNNING SUCCESSFUL PROJECTS1 It is impo

2、rtant to allow sufficient time for the_2 Make sure that you establish a _that is both sensible and manageable.3 Always focus on the_situation.4 Persuade your staff of the value of_to the project.5 Competent_is important for monitoring the project.6 Keeping staff informed will enable them to understa

3、nd the_ they have made.7 Meetings with staff from different departments may _the project.8 Ensure that you_when things go wrong.9 You need to be ready to adapt if your clients_are modified.10 Encourage as much_as possible.11 Be prepared to_as the market shifts.12 Hire people who can be easily_if nec

4、essary.二、PART TWO12 You will hear five senior managers talking about why their companies selected new locations, and about a difficulty that affected the move.For each extract, there are two tasks. For Task One, choose the reason for selecting the particular location from the list A-H. For Task Two,

5、 choose the difficulty that each company had from the list A-H.After you have listened once, replay the recording.Task One - Reason for selecting the locationFor questions 13-17, match the extracts with the reason why the company selected a particular location, listed A-H.For each extract, choose th

6、e reason that the speaker gives.Write one letter(A-H)next to the number of the extract.A low overheadsB help from the governmentC presence of suppliersD custom-built storage capacityE homes that staff could affordF easy recruitment of skilled labourG convenient for staff to travel toH opportunities

7、for networking13 _14 _15 _16 _17 _17 Task Two - Difficulty that affected the moveFor questions 18-22, match the extracts with difficulties, listed A-H.For each extract, choose the difficulty that affected each companys move.Write one letter(A-H)next to the number of the extract.A The building work w

8、as not completed on time.B The company was taken over.C The building plans met with opposition in the area.D The original construction contractor went out of business.E The company re-assessed its needs.F Transportation costs soared.G The charge for using the premises rose.H Too few staff agreed to

9、move.18 _19 _20 _21 _22 _三、PART THREE22 You will hear a discussion between two managers, Kathy and Duncan, who work in the Human Resources department of a company.For each question(23-30), mark one letter(A, B or C)for the correct answer. After you have listened once, replay the recording.23 Duncan

10、thinks that a new employee is needed to(A)assist in marketing activities.(B) deal with customer enquiries.(C) implement database changes.24 Kathy suggests that the new employee will have to(A)work for several departments.(B) undergo further training.(C) delegate various duties.25 Kathy criticises th

11、e way in which(A)vacancies are advertised.(B) interviews are conducted.(C) job specifications are changed.26 Duncan thinks many of the companys staff are dissatisfied with their(A)salaries.(B) workloads.(C) holidays.27 In which area does Duncan believe proposals for change will be accepted?(A)IT(B)

12、finance(C) production28 Kathy says she is concerned about the(A)make-up of teams.(B) meeting of deadlines.(C) lack of information.29 What does Duncan want to be introduced?(A)an in-company newsletter(B) a staff suggestion scheme(C) an annual customer survey30 Kathy thinks that in the future company strategy will be driven by(A)image building.(B) export initiatives.(C) on-line transactions.

展开阅读全文
相关资源
猜你喜欢
  • ASTM C1233-2003 Standard Practice for Determining Equivalent Boron Contents of Nuclear Materials《核材料中当量硼含量测定的标准实施规范》.pdf ASTM C1233-2003 Standard Practice for Determining Equivalent Boron Contents of Nuclear Materials《核材料中当量硼含量测定的标准实施规范》.pdf
  • ASTM C1233-2009 Standard Practice for Determining Equivalent Boron Contents of Nuclear Materials《核材料中当量硼含量测定的标准实施规范》.pdf ASTM C1233-2009 Standard Practice for Determining Equivalent Boron Contents of Nuclear Materials《核材料中当量硼含量测定的标准实施规范》.pdf
  • ASTM C1233-2015 Standard Practice for Determining Equivalent Boron Contents of Nuclear Materials《测定核材料中当量硼含量的标准实施规程》.pdf ASTM C1233-2015 Standard Practice for Determining Equivalent Boron Contents of Nuclear Materials《测定核材料中当量硼含量的标准实施规程》.pdf
  • ASTM C1234-2011 Standard Practice for Preparation of Oils and Oily Waste Samples by High-Pressure High-Temperature Digestion for Trace Element Determinations《痕量元素测定用高压 高温分解法制备油及含油废.pdf ASTM C1234-2011 Standard Practice for Preparation of Oils and Oily Waste Samples by High-Pressure High-Temperature Digestion for Trace Element Determinations《痕量元素测定用高压 高温分解法制备油及含油废.pdf
  • ASTM C1234-2011(2016) Standard Practice for Preparation of Oils and Oily Waste Samples by High-Pressure High-Temperature Digestion for Trace Element Determinations《采用痕量元素测定用高压和高温消解.pdf ASTM C1234-2011(2016) Standard Practice for Preparation of Oils and Oily Waste Samples by High-Pressure High-Temperature Digestion for Trace Element Determinations《采用痕量元素测定用高压和高温消解.pdf
  • ASTM C1238-1997(2003) Standard Guide for Installation of Walk-Through Metal Detectors《地下通道金属探测器的安装的标准指南》.pdf ASTM C1238-1997(2003) Standard Guide for Installation of Walk-Through Metal Detectors《地下通道金属探测器的安装的标准指南》.pdf
  • ASTM C1238-1997(2012) Standard Guide for Installation of Walk-Through Metal Detectors 《内置穿过式金属探测器的安装标准指南》.pdf ASTM C1238-1997(2012) Standard Guide for Installation of Walk-Through Metal Detectors 《内置穿过式金属探测器的安装标准指南》.pdf
  • ASTM C1239-2007 Standard Practice for Reporting Uniaxial Strength Data and Estimating Weibull Distribution Parameters for Advanced Ceramics《高级陶瓷用报告单轴强度数据和评估维泊尔分布参数的标准实施规程》.pdf ASTM C1239-2007 Standard Practice for Reporting Uniaxial Strength Data and Estimating Weibull Distribution Parameters for Advanced Ceramics《高级陶瓷用报告单轴强度数据和评估维泊尔分布参数的标准实施规程》.pdf
  • ASTM C1239-2013 Standard Practice for Reporting Uniaxial Strength Data and Estimating Weibull Distribution Parameters for Advanced Ceramics《高级陶瓷用报告单轴强度数据和评估维泊尔分布参数的标准实施规程》.pdf ASTM C1239-2013 Standard Practice for Reporting Uniaxial Strength Data and Estimating Weibull Distribution Parameters for Advanced Ceramics《高级陶瓷用报告单轴强度数据和评估维泊尔分布参数的标准实施规程》.pdf
  • 相关搜索
    资源标签

    当前位置:首页 > 考试资料 > 大学考试

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1