NAVY MIL-C-85441-1980 CABINET ELECTRICAL EQUIPMENT CY-7887 UPQ-5《CY-7887 UPQ-5型电子设备盒》.pdf

上传人:explodesoak291 文档编号:978192 上传时间:2019-03-13 格式:PDF 页数:61 大小:1.87MB
下载 相关 举报
NAVY MIL-C-85441-1980 CABINET ELECTRICAL EQUIPMENT CY-7887 UPQ-5《CY-7887 UPQ-5型电子设备盒》.pdf_第1页
第1页 / 共61页
NAVY MIL-C-85441-1980 CABINET ELECTRICAL EQUIPMENT CY-7887 UPQ-5《CY-7887 UPQ-5型电子设备盒》.pdf_第2页
第2页 / 共61页
NAVY MIL-C-85441-1980 CABINET ELECTRICAL EQUIPMENT CY-7887 UPQ-5《CY-7887 UPQ-5型电子设备盒》.pdf_第3页
第3页 / 共61页
NAVY MIL-C-85441-1980 CABINET ELECTRICAL EQUIPMENT CY-7887 UPQ-5《CY-7887 UPQ-5型电子设备盒》.pdf_第4页
第4页 / 共61页
NAVY MIL-C-85441-1980 CABINET ELECTRICAL EQUIPMENT CY-7887 UPQ-5《CY-7887 UPQ-5型电子设备盒》.pdf_第5页
第5页 / 共61页
点击查看更多>>
资源描述

1、MIL-C- 85441 (AS) 22 December 1980 -+- MILITARY SPECIFICATION CABINET, ELECTRICAL EQUIPMENT CY-7887/UPQ-5 1. SCOPE 1.1 . Scope - The equipment covered by this specification shall provide rack mounting and interconnecting cabling for selected units of the AN/UPQ-5 Mission Recorder Display Set and for

2、 items of Peculiar Ground Support Equipment associated with the AX/UPQ-5 system. Additionally,the equipment shall provide non-operating storage fa- cilities for other items of PGSE associated with the AN/UPQ-5 and for selected spare Shop Replaceable Assemblies from the AN/UPQ-5. 1.2 Classification -

3、 The equipment covered by this specification shall consist of a single movable console containing the following replaceable assemblies: Designation - Al Item Cabinet Subassembly PGSE Storage approval of the procuring activity shall be obtained. SPECIFICATIONS Federal Fi- C-5 9 6 / 1 38 31 ct 1977 Mi

4、litary IIIL-C-915E Amend. 1 5 April 1973 SUPP 1 MIL-G-3 7 67B Amend. 2 Supp IA 27 April 1970 Connector, Plug, Electrical, General Purpose, Hospital Grade Grounding, 2 Pole, 3 Wire, 15 Amperes, 125 Volts, 50/60 Hertz Cable And Cord Electrical, For Shipboard Use General Specification For Connector, Pl

5、ug -And Receptacle (Power, Blade Type), General Specification For Mt L-E-1 6 4 O OG Electronic, Interior Communication And Amend. 1 Navigation Equipment, Naval Ship And Shore, 1 December 1976 General Specification For MIL-E-17 5 55G Amend 2 15 April 1970 Electronic And Electrical Equipment, Accessor

6、ies, And Repair Parts, Packaging And Packing Of ElIL-T-18303B Test Procedures, Preproduction, Acceptnce, And 1 September 1966 Life For Afrcraft Electronic Equipment, Format For i.1 IL-N-1830 7F 4 August 1978 Nomenclature And Identification For Electronic, Aeronautical, And Aeronautical Support Equip

7、menc Including Ground Support Equipment MIL-T-28800B Amend. 1 Electronic Equipment, General Specification For 20 July 1977 Test Equipment For Use With Electrical And Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-C-854qI.1 47 W 9977906 0258047 5

8、 = MIL-C- e5441 (AS) MIL-C-39012B Amend. 2 Supp 1B 14 0c.tober 1976 MIL-C-39019B Amend. 2 SUPP 1 19 July 1978 MIL-A-55339 Amend. 4 Supp 1B MIL-R-81687 Connector, Coaxial, Radio Frequency, General Specification For Circuit Breakers, Magnetic, Low-power, Sealed, Trip.Free, General Specification For Ad

9、apter, Connector, Coaxial, Radio Frequency, (Between Series And Within Series), General Specification For Recorder Set, Mission AN/USH-l7(V) MIL-D-81688A Display Set, Mission Recorder AN/UPQ-SB MIL-D-81976 17 June 1974 MIL-S-81977 17 June 1974 Dummy Load, Electrical DA-662lUPQ-5 Simulator, Radar Sig

10、nal SM-697/UPQ-5 Naval Air Systems Command AR-1A 1 January 1969 Notice 1 16 June 1969 Military Maintainability Of Avionics Equipment And Systems General Tiequirement For MIL-STD-167 -1 1 May 1974 Mechanical Vibration Of Shipboard Equipment (Type I-Environmental And Type II-Internally Excited) - 3- P

11、rovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-14 IL- S TD- 7 8 5A 28 Harch 1969 Notice 2 15 June 1979 MIL-STD-7 94D 15 December 1972 Notice 4 8 August 1975 MIL-STD-810C 10 March 1975 MIL-STD-882A 28 June 1977 MIL-STD-965 15 April1977 Notice 1 22 Dec

12、ember 1978 MIL-STD-147 2B 31. December 1974 Notice 2 10 May 1978 blS-3102C 15 Hay 1969 MS-3106B 15 Hay 1969 1mlS24266K 14 November 1977 Reliability Program For Systems And Equipment Development: And Production Part And Equipment, Procedures For Packaging And Packing Of Environmental Test Methods Sys

13、tem Safety Program Requirements Parts Control Program Interface Standard For Shipboard Systems Section 300, Electric Power, Alternating Current Human Engineering Design Criteria For Military Systems, Equipment And Facilities Connector, ReceptacZe, Electric, Box Mounting Connector, Plug, Electric, St

14、raight Connector, Plug, Electrical Straight, Miniature -4- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DRAWINGS HIU3-Singer, Inc. (FSCM 99592) 325-185 335-804 601209 603680 603685 610600 - RCA Corp (FSCM 49671) 8370986 Converter, Frequency, Stati

15、c CV-2933A/UPQ-5, Source Control Drawing For Mounting Kit, Rack,Specification Control Drawing For Mission Recorder Display Set AN/UPQ-5, Engineering Drawing Package For (Dwg 601209, subordinate drawings, and associated lists) Radar Signal Simulator SM-697/UPQ-5, Eng- ineering Drawing Package For (Dw

16、g 603680, subordinate drawings, and associated lists) Electrical Dummy Load DA-662/UPQ-5, Eng- ineering Drawing Package For (Dwg 603685, subordinate drawings, and associated lists) Video Indicator IP-1314/UPQ-5, Engineering Drawing Package For (Dwg 610600, subordinate drawings, and associated lists)

17、 Nission Recorder Set AN/USH-l7(V), Engineering Drawing Package For (Dwg 8370986, subordinate drawings, and associated lists) PUBLICATIONS Naval Air Systems Command NAVAIR 16-3OPQ5-1 Technical Manual, Operation And Naintenance Instructions (Intermediate) Display Set, Nission Recorder, AN/UPQ-5D Part

18、 Number 601209-5 -5- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-85Y41 Y9 m 9999906 O258050 5 m MIL-C-85441 (AS) NAVAIR 16-3OUPQ5-4 NAVAIR 16-30USH17-1 NAVAIR 16-30USH17-2 Technical Manual, Operatibn And Maintenance Instructions With Illust

19、rated Parts Break- down (Intermediate) Indicator, Video, IP-1314/UPQ-5 Part Numb er 610 6 O 0-1 Technical ;ilanual, Maintenance Instructions (Intemediate M/USH-l7(V)3 And AN/USH-l7(V)7 Mission Recorder Sets Technical Manual, Illustrated Parts Breakdown (Int ermeda te) AI?/USH-17 (V) 3 And AN/USH-17

20、(V) 7 Mission Recorder Sets NAVAIR 16-35 SM 69 7-1 Technical Manual, Operation And Maintenance (Formerly NAVAIR 16-45- 1939) (Intermediate) Simulator, Radar Signal SM- Instructions With Illustrated Parts Breakdown 697/UPQ-5 Part Number 603680-1 and Dummy Load, Electrical DA-662/UPQ-5 Part Number 603

21、685-1 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3. REQUIMHXNTS 3.1 Preproduction - This specification makes provisions for preproduction testing. 3.2 Parts and Materials - In the selection of parts and materials, fulfillment of major design obj

22、ectives shall be the prime consideration. In so doing,the following shall govern: (1) and microelectronic items shall conform to re- quirements specified herein. ihen used,micro- electronic devices shall have two or more surces, and the device from each source shall be inter- changeable. Interchange

23、ability shall be demon- strated by random installation of devices from two or more sources during fabrication of pro- duction quantities. Successful operation of the equipment with a random mixing of device sources shall be proof of interchangeabilty. operation of the equipment shall be evaluated to

24、 determine if a device is faulty or is not inter- changable. Microelectronic Technology shall be considered, Unsuccessful (2) other parts and material requirements shall conf om Except as otherwise specified herein, all to XIL-E-16600. (3) in accordance with paragraph 3.1.3(2) of Specification AR-10

25、. Nonrepairable subassemblies shall be used (4) equipment did not use nonrepairable subassemblies, the design shall not be changed to employ non- repairable assemblies without the approval of the procuring activity. When previously produced models of this 3.2.1 Nonstandard Parts and Material Approva

26、l - Approval for use of nonstandard parts and materials (including electron tubes, transistors, diodes and microelectronics devices) shall be obtained as outlined in specification HIL-E-16400. be in accordance with applicable requirements of MIL-STD-965. Nonstandard parts data shall - 7- Provided by

27、 IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-85441 (AS) 3.2.2 Modules - Electronic portions OE the equipment shall be functionally modularized using the requirements of AR-10 as a guide. 3.3 Design. and Construction - The design, construction, and work

28、manship of the equipment shall be, wherever feasible, con- sistent with the design, construction, and workmanship requirements for the AN/UPQ-5 Mission Recorder Display Set as escribed in MIL-D- 81688. and workmanship requirements of tiIL-E-16400 shall be used as a guide except as otherwise specifie

29、d herein. Where MIL-D-81688 is not applicable, the design, construction, 3.3.1 Total Weight - The total weight of the equipment, including cables, shall be a minimum consistent with good design and shall not exceed 650 pounds. 3.3.2 Reliability - When specified in the contract or order, the contract

30、or shall conduct a reliability program using MIL-STD-785 as a guide. On a reorder from a supplier who has previ- ously produced the equipment, the program previously used may be continued unless otherwise indicated in the contract or order, 3.3.2.1 Operational Stability - The equipment shall operate

31、 with satisfactory performance, continuously or intermittently,for a period of at least 200 hours without the necessity for readjustment of any controls which are inaccessible to the operator during normal use, 303.2.2 Operating Life - The equipment shall have a total operating life of 10,000 hours

32、with reasonable servicing and replacement of parts, by the contractor. Parrs requiring scheduled replacement shall be specified 3.3.2.3 Reliability in Mean Time Between Failure (MTBF) - When the contract or order requires areliability program under pro- visions of section 3.3.2 herein, the mean (ope

33、rating) time between failures (NTBF) in hours and the test requirements shall also be specified in the contract or order. 3,3.2,4 Time Totalizing Meter - Time totalizing meters are not required. 3a3.3 Cabling and Connectors - Cabling and connectors shall meet the following requirements: - 8- Provide

34、d by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-B5YYL q9 9797906 0258053 O e a 3.3.3.1 Cables and Connectors - The equipment shall provide for the use of cables and connectors in accordance with MIL-E-16400 except as otherwise specified herein. - 3.3.

35、3.2 Interconnecting Cabling - The equipment shall be capable of satisfactory operation using external power cabling in ac- cordance with the applicable requirements of MIL-C-915. The external power cabling shall be unshielded, except that a minimum number of individual wires may be shielded when dem

36、onstrated as necessary to meet interference control requirements and provided the assembly of the cable to its plugs may be easily accomplished. The external power cable and that portion of the connector attached to the cable shall be supplied as part of the equipment. 3.3.4 control panels shall con

37、form to the applicable requirements of MIL-E-16400. by the procuring activity prior to the Preproduction testing. Control Panels - All rack and console mounted The configuration of all control panels must be approved 3.3.5 Interchangeability - The equipment shall meet the interchangeability requirem

38、ents of MIL-E-16400. 3.3.6 Electromagnetic Interference Control - The requirements of MIL-E-16400 shall be used as a guide in the design of the equipment for the control of electromagnetic interference. As a minimum, the following requirements shall apply, 3.3.6.1 Enclosure - The equipment cabinet (

39、enclosure) shall be in accordance with the requirements of section 3,5.1.2 herein. 3.3.6.2 EM1 Gasketing - F3fI gasketing shall be provided as specified in section 3.5.1.3 herein. 3.3.6.3 Power Line Filters - EM1 filters shall be provided on the power input line to the equipment. These filters shall

40、 provide a minimum insertion loss, at their rated load, of 30 dB at 15 KHz, increasing to a minimum of 80 dB for frequencies between 60 KHz and 1 GHz. 3.3.7 Provisions or Maintainability - Construction and packaging shall be as outlined in paragraphs 3.1.2, 3.1.4 and 3.1.5 of Specification AR-10. -9

41、- A Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3.7.1 Organizational Level Maintenance - The design of the equipment shall be such as to permit maintenance at the organi- zational level to determine that the equipment meets its performance requ

42、irements and is satisfactory for its intended use. 3.3,7.2 Weight of Replaceable Assemblies - The weights of individual assemblies shall not exceed the weights specified in section 3.5. 3*3*7*3 Accessibility - To provide equipment accessibility, unit mounting shall be in accordance with the followin

43、g: (1) Power Panel (Al) - The PGSE Storage and Power Panel Assembly shall be a standard 19-inch rack mounted assembly secured by front panel fasteners, Weight bearing supports shall be provided in the equipment rack as necessary. (2) Recorder Mount (A2) - The lission Recorder Mount shall be a slide-

44、mounted standard 19-inch rack mounted unit secured by front panel fasteners. (3) Blower (A31 - The Electronic Equipment Air Cooler shall be a standard 19-inch rack mounted unit secured by front panel fasteners. rear-attaching mounting hardware is permissible. Additional (4) Power Strip (A41 - The El

45、ectrical Outlet Strip shall be mounted in the inside rear of the equipment cabinet to permit AC power cords from front mounted units to be individually connected. (5) shall be hard mounted inside the equipment cabinet at the point of entry for the primary AC power connection to the cabinet. Filter A

46、ssembly (A51 - The EM1 Filter Assembly (6) Video Disc Storage Tray - The Disc Storage Shelf Assembly shall be a standard 19-inch rack mounted assembly secured by front panel fasteners. Stored video discs shall be removable from the front of the equipment without removal of the storage shelf itself.

47、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(7) Video Disc Recorder Mount - The Video Disc Recorder Nount shall provide standard 19-inch slide mounting for the Video Disc Recorder unit such that the recorder can be extended on the slide rails for

48、 maintenance. (8) Assembly shall be a slide mounted standard 19-inch SRA Storage Drawer - The SRA Storage Drawer rack mounted unit secured by front panel fasteners. (9) The Time Base Corrector unit, a standard 19-inch rack Time Base Corrector (Not Supplied) Mounting - mounted unit with a nominal 3-1

49、/2 inch panel height, shall be slide mounted and secured by front panel fasteners. (Mounting hardware including slide rails, both chassis and cabinet halves, shall be supplied with the equipment cabinet.) (10) Video Indicator (Not Supplied) Mounting - The IP-1314/UPQ-5 Video Indicator, a bench mounted unit which is part of the KN/UPQ-5, shall be slide mounted on tiltable slides which allow t

展开阅读全文
相关资源
猜你喜欢
  • DL T 1151 12-2012 Analytical methods of scale and corrosion products in power plants Part 12 determination of phosphoric anhydride《火力发电厂垢和腐蚀产物分析方法 第12部分:磷酸酐的测定》.pdf DL T 1151 12-2012 Analytical methods of scale and corrosion products in power plants Part 12 determination of phosphoric anhydride《火力发电厂垢和腐蚀产物分析方法 第12部分:磷酸酐的测定》.pdf
  • DL T 1151 15-2012 Analytical methods of scale and corrosion products in power plants Part 15 Preparation of water-soluble scaling preparative test solution《火力发电厂垢和腐蚀产物分析方法 第15部分:水溶.pdf DL T 1151 15-2012 Analytical methods of scale and corrosion products in power plants Part 15 Preparation of water-soluble scaling preparative test solution《火力发电厂垢和腐蚀产物分析方法 第15部分:水溶.pdf
  • DL T 1151 17-2012 Analytical methods of scale and corrosion products in power plants Part 17 determination of chloride in deporsit-forming impuritied in steam《火力发电厂垢和腐蚀产物分析方法 第17部分.pdf DL T 1151 17-2012 Analytical methods of scale and corrosion products in power plants Part 17 determination of chloride in deporsit-forming impuritied in steam《火力发电厂垢和腐蚀产物分析方法 第17部分.pdf
  • DL T 1151 18-2012 Analytical methods of scale and corrosion products in power plants Part 18 determination of sodium oxide in deposit-forming impuried in steam《火力发电厂垢和腐蚀产物分析方法 第18部.pdf DL T 1151 18-2012 Analytical methods of scale and corrosion products in power plants Part 18 determination of sodium oxide in deposit-forming impuried in steam《火力发电厂垢和腐蚀产物分析方法 第18部.pdf
  • DL T 1151 2-2012 Analytical methods of scale and corrosion products in power plants Part 2 Sampling and dissolving method for scale and corrosion products《火力发电厂垢和腐蚀产物分析方法 第 2部分:试样的.pdf DL T 1151 2-2012 Analytical methods of scale and corrosion products in power plants Part 2 Sampling and dissolving method for scale and corrosion products《火力发电厂垢和腐蚀产物分析方法 第 2部分:试样的.pdf
  • DL T 1151 20-2012 Analytical methods of scale and corrosion products in power plants Part 20 determination of carbon dioxide in carbonate scale《火力发电厂垢和腐蚀产物分析方法 第20部分:碳酸盐垢中二氧化碳的测定》.pdf DL T 1151 20-2012 Analytical methods of scale and corrosion products in power plants Part 20 determination of carbon dioxide in carbonate scale《火力发电厂垢和腐蚀产物分析方法 第20部分:碳酸盐垢中二氧化碳的测定》.pdf
  • DL T 1151 21-2012 Analytical methods of scale and corrosion products in power plants Part 21 determination of metal-element content inductively coupled plasma atomic emission spect.pdf DL T 1151 21-2012 Analytical methods of scale and corrosion products in power plants Part 21 determination of metal-element content inductively coupled plasma atomic emission spect.pdf
  • DL T 1151 3-2012 Analytical methods of scale and corrosion products in power plants Part 3:determination of moisture content《火力发电厂垢和腐蚀产物分析方法 第 3部分:水分的测定》.pdf DL T 1151 3-2012 Analytical methods of scale and corrosion products in power plants Part 3:determination of moisture content《火力发电厂垢和腐蚀产物分析方法 第 3部分:水分的测定》.pdf
  • DL T 1151 4-2012 Analytical methods of scale and corrosion products in power plant Part 4 Determination of the loss (increase) on ignition 《火力发电厂垢和腐蚀产物分析方法 第 4部分:灼烧减(增)量的测定》.pdf DL T 1151 4-2012 Analytical methods of scale and corrosion products in power plant Part 4 Determination of the loss (increase) on ignition 《火力发电厂垢和腐蚀产物分析方法 第 4部分:灼烧减(增)量的测定》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1