NAVY MIL-R-85363 (2)-1986 ROCKET MOTOR MARK 23 MODS 2 AND 3《 MARK 23 MODS 2及 3型火箭发动机》.pdf

上传人:ideacase155 文档编号:981438 上传时间:2019-03-12 格式:PDF 页数:2 大小:75.37KB
下载 相关 举报
NAVY MIL-R-85363 (2)-1986 ROCKET MOTOR MARK 23 MODS 2 AND 3《 MARK 23 MODS 2及 3型火箭发动机》.pdf_第1页
第1页 / 共2页
NAVY MIL-R-85363 (2)-1986 ROCKET MOTOR MARK 23 MODS 2 AND 3《 MARK 23 MODS 2及 3型火箭发动机》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-R-85363 (2) 13 7779906 036q565 4 k-3% 6 MIL-R-85363(AS) AMENDMENT 2 15 JULY 1986 0F Requirements Min Max SUPERSEDING AMENDMENT 1 1 May 1981 140F Min Max MILITARY SPECIFICATION 2.013 2.653 10,Ooo 12,200 25,000 26,250 - 0.30 ROCKET MOTOR, MARK 23 MODS 2 AND 3 i .613 2.113 12,700 15,150 25,800 26,5

2、00 - 0.30 This amendment forms a part of MIL-R-85363, dated 1 May 1981, and is approved for use within the Naval Air Systems Command, Department of the Navy, and is available for use by all Departments and Agencies of the Department of Defense. Maximum thrust PAGE 2 - 16,500 - 16,500 Under ?DRAWINGS

3、?: Add ?DL 1133AS100 Mods, Without Igniter?. Shipping Condition Rocket Motor, JATO, Mk 23 Under ?PUBLICATIONS?: Add ?WR-53/808 Load, Rocket Motors, JATO Mk 23 Mods? and ?WR-53/866 Domestic Unit Load, Rocket Motor, JATO, Mk 23 Mods?. Weapons Requirement, Palletizing Domestic Unit Weapons Requirement,

4、 Palletizing PAGE 3 Add new paragraph as follows: ?3.1.4 Corrosion protection. All parts and surfaces subject to corro- sion shall be protected in accordance with the requirements specified on the drawings listed on DL 1255AS100 or DL 1255AS200.? PAGE 5 * TABLE I: Delete and substitute new table as

5、follows: TABLE I. Ballistic requirements. Avg. thrust duration (sec) Avg. thrust (lb) Avg. total impulse (lb-sec) Ignition interval (sec) DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 1 of2 FSC 1340 Provided by IHSNot for ResaleNo reproduction or networking permit

6、ted without license from IHS-,-,- MIL-R-5363 (2) 13 W 9377706 0364566 O W - MIL-R-85363(S) AMENDMENT 2 PAGE 9 TABLE IV. Change requirement numbers as follows: from “3.4.3” to “3.1.2”, from “3.4.4” to “3.1.4”, from “3.4.5” to “3.4.3”, from “3.4.6” to “3.4.4”, from “3.4.7” to “3.4.5”. * Add “4.5.2.3 P

7、ost-firing visual inspection. All fired hardware shall be visually inspected and shall be free of hot spots, blisters, and permanent deformation. 4.6.3, line 1: Delete “and rocket motors”. PAGE 11 5.1.2, Add second sentence as follows: “Rocket motor shipping condition shall be in accordance with DL

8、1133AS100 when specified (see 6.2.1).” PAGE 12 5.2.1, line 2: Delete “the drawings listed on DL 1255AS100 or DL 1255AS200” and substitute “WR-53/808 or WR-53/866 as specified (see 6.2.1)”. 6.2.1: Add “h. Applicable packing and packaging documents (see 5.1.2 and 5.2.1).” NOTE: “The margins of this am

9、endment are marked with an asterisk to indicate where changes (addi- tions, modifications, corrections, deletions) from the previous amendment were made. This was done as a convenience only and the government assumes no liability whatsoever for any inaccuracies in these nota- tions. Bidders and cont

10、ractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment.” Preparing activity: Navy - AS (Project 1340-N 715 *U.S. GOVERNMENT PRINTING OFFICE 1988 - 606-036/44834 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1